Post Job Free

Resume

Sign in

Engineer Manager

Location:
Cairo, Cairo Governorate, Egypt
Posted:
April 21, 2020

Contact this candidate

Resume:

(* of *)

C U R R I C U L U M V I T A E

Mamdouh Fatehy Okasha

B 11 G 3 El Rehab city - New Cairo – Cairo - Egypt. Cellular: +2-012-***-*****

Landline: +202-**-***-***

E-mail: adcv73@r.postjobfree.com

P E R S O N A L I N F O R M A T I O N

Nationality: Egyptian

Date of Birth: SEP 14 th, 1979

Military Status: Completed.

Marital Status: Maride .

B I O G R A P H Y

• Over 16 years of experience in implementation of the structural works for all structural elements in varies kind of projects such as industrial projects, residential projects, the field of experiences which include quantity surveying, revision of variation orders, cost estimation, and assessing the claims, reviewing shop drawings, co-ordination between various departments in the projects, following up reports and invoices, review soil and concrete tests and its data analysis, monitoring project progress according to project time schedules, review & control project quality according to project quality plan and civil codes and control projects man power as well .

• The last years gained a valuable experience in Multi use projects as different roles within project tendering beside main duty extent to cover design coordination, seek solutions to problems and estimate the economic viability of each potential solution is normally considered along with the technical aspects to achieve a suitable financial and technical proposal within an agreed time and budget.

• Involved in a different types of projects Athletic, hospitals, educational, infrastructure and building projects.

• Good knowledge in unified building law 2008 and executive regulations. E D U C A T I O N

Bachelor's degree, Major: Design and Material testes Faculty of Engineering, Hell wan University / Civil - May, 2003 E X P E R I E N C E S U M M A R Y

TechnipFMC Italy for construction (may.2019: present) Construction Manager act as Interfacing and Permitting coordinator

RMC Rafat Miller consultant and engineering (Nov.2018: may.2019) Senior structuer engineer (Consultant)

Al-ARABEA Contractor for Real Estate Development, (2years) Construction manager and Site Project Manager (Contratcor) Dimension Consulting and Engineering (April. 2016: Nov 2018) Resident Engineer (Consultant)

Hussein Sabbour Consulting Bureau (HSCB), (5 years) Site project manager (Consultant)

Al-Ahly Real Estate Development/ SABBOUR (HSCB), (4years) Representative of Owner and Site Project Manager

(OWNER)

Global Company Building Systems, (2 years)

Site Engineer ( Contractor)

Al Maram for licenses and design (May.2009: present) Owner and Manager of Al Maram office for design and

(2 of 9)

1

licenses.

W O R K R E S P O N S I B I L I T Y & E X P E R I E N C E May.2019:present

TechnipFMC Italy for construction

Construction Manager act as Interfacing and permitting coordinator Location: Free Zone-Borg El Arab- Alex

Location: MIDOR EXPANSION REFINERY PROJECT

Owner: Middle East oil refining

Project manager: WOOD consulting

Contractor: PTJ construction

brief on project

expansion of the existing plant capacity from 100,000 BPSD to 160,000 BPSD including all engineering work and construction work in green area and red area . Job Description

• Responsible for the day to day personnel oversight and the coaching, mentoring, monitoring and development of each team member so they are capable, engaged contributors to the success of their group, team, department, and the contract.

• Troubleshooting issues, problems or areas requiring enhancement within the fabrication / Service scope of deliverables, provide analysis and recommend solutions to meet contractual requirements, also support the transition of new workflows and resources into the designated working areas.

• Ensure consistency of communication to the customer, staff and other stakeholders, standardization of workflows, reports, procedures, structure, memoranda, proposals and support of day to day operational tasks.

• Permitting Project Engineer who shall, with the help of other permitting Engineers update the correctness and status of each required permit whilst bringing to the attention of the project director any permitting issue that may have an impact on the project schedule. The duties of the Permitting Project Engineer include that he shall Define a Preliminary Permit List and maintain, with the input of other project coordinators.

• Be responsible for the successful completion of the Project Interface Management Plan.

• Propose resolutions if conflicts arise regarding internal interface points and cordially inform the OWNER's Interface Coordinator of the outcome

• Review and propose the change of work.

• split between SUBCONTRACTORs Ratify all internal interface point Agreements Give the permission to Discipline.

• Interface Coordinators to update the Project Interface Management Database

• Cooperate with other Interface Coordinators to manage all flow of information on interface issues in order to ensure the success of the completion of the interfaces.

(3 of 9)

Nov. 2018 – May.2019

Senior structure engineer

Location: MIVIDA office park

Location: MIVIDA PROJECT

Owner: EMAAR

Project manager: TIME turner

Contractor: ASGC construction

Job Description:

• senior construction Engineers and workers, contractors, junior engineers, and technicians.

• Ensure that all contributors to a project are performing their duties and meeting the demands of each project.

• Responsible for completing several tasks on a daily basis to satisfy all job requirements.

• Responsible for evaluating the structure to ensure that it meets all local codes and specifications. Make sure that all safety and regulatory issues have been addressed and resolved.

• Creating schematics and plans for new construction or renovation projects

• Developing budgets for construction projects

• Reviewing code compliance and resolving safety issues

• Evaluating completed projects to ensure they satisfy all guidelines and specifications

• Reviews Contractor's correspondence and issues the replies of the Engineer's Representative on matters as Contract Conditions and the Engineer's delegated authority allow.

• Checks Contractor's submittals for completeness and either issues (Engineer's Representative) ER's decisions on matters delegated to him by the Engineer, or prepares his proposed response to the submittal and forwards both to the Engineer for finalization.

• Checks Contractor's correspondence on contractual issues (variation orders evaluation, extension of time, claims, etc.) and provides his initial comments to the Engineer with all the background information so that the Engineer may issue a decision.

• Ensures that the Works are carried out in accordance with the Contract Documents requirements.

• Certifies monthly payment certificates for the Employer

• Chairs periodic progress meetings and technical meetings.

• Issues monthly progress reports to the Employer's and the Engineer's managements.

• Follows up Contractor's compliance with the undertaking to complete outstanding works during the defects liability period (maintenance period).

• Involved in a project from the start, preparing estimates and costs of the work.

• Lead Take-off team to review project quantities and assign major quantities and prepare tender and contract documents, including bills of quantities.

• Create project budget and review all estimates prior to submission and manages all costs relating to project, from the initial calculations to the final figures.

• Advice design team to suitable with project budget and document the design and construction budgets, cost estimates, associated financial reporting including cash flow projections

• Follows up the financial, cost reporting forms, development, and specific formats for design and construction monitoring purposes.

• Keep track in construction phase for any variations to the contract that may affect costs.

(4 of 9)

• Approved, Follows up variation order, cost reporting forms for the project and monitoring project cost planned versus actual.

Apr. 2016 – Nov.2018

Dimension Consulting and Engineering

Construction manager

Location: Site and head office

Job Description:

• lead construction Engineers and workers, contractors, junior engineers, and technicians.

• Ensure that all contributors to a project are performing their duties and meeting the demands of each project.

• Responsible for completing several tasks on a daily basis to satisfy all job requirements.

• Responsible for evaluating the structure to ensure that it meets all local codes and specifications. Make sure that all safety and regulatory issues have been addressed and resolved.

• Creating schematics and plans for new construction or renovation projects

• Developing budgets for construction projects

• Reviewing code compliance and resolving safety issues

• Evaluating completed projects to ensure they satisfy all guidelines and specifications

• Reviews Contractor's correspondence and issues the replies of the Engineer's Representative on matters as Contract Conditions and the Engineer's delegated authority allow.

• Checks Contractor's submittals for completeness and either issues (Engineer's Representative) ER's decisions on matters delegated to him by the Engineer, or prepares his proposed response to the submittal and forwards both to the Engineer for finalization.

• Checks Contractor's correspondence on contractual issues (variation orders evaluation, extension of time, claims, etc.) and provides his initial comments to the Engineer with all the background information so that the Engineer may issue a decision.

• Ensures that the Works are carried out in accordance with the Contract Documents requirements.

• Certifies monthly payment certificates for the Employer

• Chairs periodic progress meetings and technical meetings.

• Issues monthly progress reports to the Employer's and the Engineer's managements.

• Follows up Contractor's compliance with the undertaking to complete outstanding works during the defects liability period (maintenance period).

• Involved in a project from the start, preparing estimates and costs of the work.

• Lead Take-off team to review project quantities and assign major quantities and prepare tender and contract documents, including bills of quantities.

• Create project budget and review all estimates prior to submission and manages all costs relating to project, from the initial calculations to the final figures.

• Advice design team to suitable with project budget and document the design and construction budgets, cost estimates, associated financial reporting including cash flow projections

• Follows up the financial, cost reporting forms, development, and specific formats for design and construction monitoring purposes.

• Keep track in construction phase for any variations to the contract that may affect costs.

• Approved, Follows up variation order, cost reporting forms for the project and monitoring project cost planned versus actual.

(5 of 9)

Apr. 2016: Nov 2017

Dimension Consulting and Engineering

Resident engineer

Location: Emerald Nile tower project- Head

Office

Owner: Emerald Nile Residence

Project manager: Dimension Consulting and Engineering Contractor: Soil Egypt

Job Description:

• lead construction Engineers and workers, contractors, junior engineers, and technicians.

• The project consists of four underground floors (basement) on an area of 6,245 square meters for each floor.

• The ground floor has a total area of 5605 square meters.

• Mezzanine floor with an area of 3165 square meters.

• The first floor has a total area of 3809 square meters.

• It is followed by 29 floors with a total area of approximately 3900 square meters.

• The last floor has a total area of 1047 square meters.

• The height of the property is approximately 70 meters.

• 10 Fadden (total area).

• Project value: 150,000,000 LE.

Apr 2016: Apr. 2017

Dimension Consulting and Engineering

Senior structure engineer

Location: The GATE project

Owner: Abraj real-estate

Project manager: HILL INTERNATIONAL

Contractor: SIAC construction

Job Description:

• lead construction Engineers and workers, contractors, junior engineers, and technicians

• provide 1227 residential apartments having variety of 1 bed room, 2 bed rooms, 3 bed rooms, Duplex, Studio, Sky Villas starting from the 1st floor till the 9th floor and 10216 square meter total area of offices and 10713 square meter total area of clinics and provide also 95440 square meter as commercial & mall area through basement 2 partially, basement 1, Ground and mezzanine.

• 20 Fadden (total area).

• Project value: 3,000,000,000 LE

Apr 2014- Apr 2016

Owner: Al Arabia real-estate and development

Project and Construction manager Contractor

consultant: Hussein Sabbour Consulting Bureau (HSCB) Location: DYAR Residence -New Cairo (Apr. 2014 – Apr 2016)

• Checking the daily activities and work progress according to project schedule, phases and project delivery and management of all technical matters.

• Management of the day to day activities on site.

• Responsible for ensuring that the works are carried out to a satisfactory level and safely.

(6 of 9)

• Responsible to ensure that the project is supplied with all documentation, methods and materials needed to carry out the works.

• Coordinate on a daily basis with the subcontractors, and assist in the preparation of the work requisition for the subcontracted works.

• Review technical and commercial comparison sheets of offers received from the subcontractors, and follow up of the subcontracted works, including the payment

• Review work requisition for all required permanent materials, and prepare material submittals and follow-up of the approval process.

• Managing site workmanship.

• Manage subcontractor’s performance to achieve their tasks according to projects schedule and quality requirements.

• Mange the equipment usage for its full capacity to ensure proper operation.

• Ensure adequate working conditions for site personnel.

• Approve the implemented works during the specified time duration to issue the interim payment.

• Prepare the required reports for project progress, requirements and problems.

• To monitor and supervise the projects execution presses on site to ensure completion of the job within specified time frames, in an organized and cost-effective manner, in accordance with the approved design and quality standers so as to meet customers’ satisfaction and maintain continuity of business.

• Examine the drawings, assess the material requirements, approve and submit the materiel requisition accurately so as to facilitate purchase of appropriate quantities of materials.

• Examine the project program and based on the schedule mentioned assess the material and manpower requirement for the job.

• Prepare and forward the requisition of sub-contractors required for different jobs to H.O for approval.

Jul 2014 – Apr 2012

Hussein Sabbour Consulting Bureau (HSCB)

Construction Manager

Location: Veterinary vaccine factory Vaxin -October 6 Owner: Vaxin Co

Project manager: Hussein Sabbour Consulting Bureau (HSCB) Job Description:

• Project value: 250,000,000 LE

• 15,000 M2 (total area)

• In implementation of the whole project from cut & fill stage to finishing and Equipment installation and commissioning of the site.

• Following and control project budgets and schedule to ensure that project work runs smoothly and in accordance with the time frames, mile stones and budget.

• Ensure that project operation effectively with the approved drawings, specifications, and project requirement.

• Reviewing & approving project quantities, invoice, & monthly payments. Issue of documentation for the monthly assessments of contractor Jul 2009 – Apr 2012

Hussein Sabbour Consulting Bureau (HSCB)

Site project Manager (Consultant)

Location: Dyar Residence -New Cairo (Jul. 2009 – Apr 2016) Dyar Park Residence -New Cairo (Jul. 2009 – Apr 2016) Owner: AL ARABIA Real Estate Development Co

(7 of 9)

Project manager: Hussein Sabbour Consulting Bureau (HSCB) Contractor: Al Arabia for construction

Job Description:

• Managing, supervising and advising in construction of the project.

• Project value: 250,000,000 LE

• 105 Fadden (total area)

• 304 villas &11 artificial lakes. In supervising the Landscape of the whole project & acting the artificial lakes from cut & fill stage to finishing and overseeing the implementation of the entire project villas, roads, and coordination of the site.

• Following and control project budgets and schedule to ensure that project work runs smoothly and in accordance with the time frames, mile stones and budget.

• Ensure that project operation effectively with the approved drawings, specifications, and project requirement.

• Reviewing & approving project quantities, invoice, & monthly payments.

• Issue of documentation for the monthly assessments of contractor. Jan. 2005: July 2009

Al-Ahly Real Estate Development / SABBOUR (HSCB)

Representative of Owner and Site Project Manager (OWNER) Location: Grand Residence-New Cairo (Jan. 2005 – July 2009) Flower Do vile – Etwal Do vile -New Cairo

Compound Flower do vials – 10 cities of Ramadan

Owner: Al-Ahly Real Estate Development

Project manager: Hussein Sabbour Consulting Bureau (HSCB) Contractor: Miser contracting (MIDECOM EGYPT)

Job Description:

• Managing, supervising and advising in construction of the project.

• Following and control project budgets and schedule to ensure that project work runs smoothly and in accordance with the time frames, mile stones and budget.

• Ensure that project operation effectively with the approved drawings, specifications, and project requirement.

• Reviewing & approving project quantities, invoice, & monthly payments.

• Issue of documentation for the monthly assessments of contractor. Technical Office Engineer (Jan. 2005 – Dec. 2005)

Grand Residence-New Cairo

Job Description:

• Reviewing & approving project quantities, invoice, & monthly payments.

• Reviewing & approving variations & value engineering.

• Reviewing & approving Shop drawings & Materials submitted by contractor. Grand Residence-New Cairo (Jan. 2005 – July 2009)

155,000,000 LE 67 Fadden (total area) .298 villas. 10 artificial lakes. In supervising the Landscape of the whole project & acting the artificial lakes from cut & fill stage to finishing and overseeing the implementation of the entire project villas, roads, and coordination of the site.

Flower Do vile-New Cairo

133,000,000 LE. 45 Fadden (total area) .135 villas. 2 artificial lakes.

(8 of 9)

In supervising the Landscape of the whole project & acting the artificial lakes from cut & fill stage to finishing and overseeing the implementation of the entire project villas, roads, and coordination of the site.

1 Jul 2003- Jul 2005

Global Company Building

Site Engineer Contractor

Location: Zizienia Compound -New Cairo (JUL. 2003 – Jul 2005)

• The receipt of the site and oversee all the work is done the project site.

• Review all the tests that take place on the supplies and samples Special Work.

• Implementation time schedule for the project.

• Supervision of delivery of all items to the project consultant.

• Supervision of and ensure the safety of all calibration and measurement, inspection and test equipment Project.

• Review of periodic reports on the progress of the project work.

• Review and approval of Payment Work / subcontractors and suppliers.

• Approved The Samples of the project from consultant.

• Study change orders before included in the schedule.

• Review project requirements of needs and resources. May.2009: May.2019

Al Maram for licenses and design

Owner and manager Al Marram office for design and

licenses.

• Design arch and structure infrastructure such as (factories, roads, sewage, and water).

• Equipment installation and commissioning for factories project ( steel and concrete project).

• Prepare drawing and documents refer to requirements and permission for Issuing licenses.

• Follow up with governmental agencies to obtain the required licenses and approvals.

• Follow –up with the decile of the civil liability insurance companies to approve the construction panels.

• Follow-up with the authorities responsible for the permits of industrial and tourist establishments and the processing of documents for appropriations and licenses. C E R T I F I C A T I O N S

PMP, Project Management Professional Prepare Curse - Polaris (2016) SAP 2000, ETAB, SAF Design structure – OM (2003)

K E Y P R O J E C T S

Design and licenses

• Design arch and structure infrastructure such as (factories, roads, sewage, and water).

• Industrial, residential and tourist facilities licenses and design. Tunnels Project

• Military tunnels in El Suez Civil Construction Works Medical Projects

• Veterinary vaccine factory Vaxin -

October 6

Building Projects

• THE GATE Project

(9 of 9)

• EMERALD NILE TAWOER Project

Hotels Projects

• HELTOWN DOUBEL TREE Project

Housing Projects

• Grand Residence Housing Project - Community Facilities

• Flower do veil Residence Housing Project - Community Facilities

• E twal do veil Residence Housing Project - Community Facilities Infrastructure Projects

• Compound Infrastructure Works-

Recreational projects

• LEGOLAND

• Service Clubs

Industrial Project

• Borg El Arab Factories

• New Cairo Factories

S K I L L S

ENGINEERING PROGRAM

• AutoCAD

• SAP 2000

• ETAB 17

• SAF 16

• Primavera (P6)

• Microsoft project

• Adobe Photoshop

• Microsoft Office

• PMP Course

• Fidic Background

• Housing laws and requirements.

L A N G U A G E

ARABIC

• Level: Mother tongue

ENGLISH

• Level: Expert

Membership of Professional Institutions:

• Member Egyptian Engineers Syndicate



Contact this candidate