Gregory G. Boyce
**** **. ***** ***** ****. Firestone CO 80504
adcuor@r.postjobfree.com
SUMMARY OF QUALIFICATIONS
Over 33 years of facilities and operations experience in both the hospitality and property management industries as a quality driven, customer care and detail oriented professional. Committed to process excellence and high performing team development.
PROFESSIONAL EXPERIENCE
Building Engineer – City and County of Denver (January 2012-March 2020)
Responsible for four city buildings: City and County Building, Police Administration Building, Pre-Arraignment Detention Facility, and District 6 Police Station
All had pneumatic controls to 4 pipe fan coil units; Carrier air handlers all 4 pipe systems fed by DDC controls for valves and dampers
Hot water pumps that transferred hot water converted by steam
Chilled water pumps, chilled water provided by city and ran through flatplate
Chief Engineer - Golden Mardi Gras Casino (2006-October 2008).
Responsible for all facets of building and grounds maintenance, including snow removal, for three casinos.
Supervision and training of maintenance engineering staff.
Interviewing, hiring, performance reviews, and disciplinary actions of department staff.
Scheduling and assignments of staff. Budget management and inventory control.
Capital management.
Strategic goals and objectives of engineering department.
Review and negotiate vendor contracts and services.
Installation of temporary chiller in 1.5 days due to loss of cooling system
Chief Engineer - ACF Property Management (2002-2005).
Responsible for all facets of daily maintenance operations for office buildings and an outdoor shopping complex.
All of the above responsibilities/skills with the exception of the installation of a temporary chiller.
Supervision of janitorial staff in addition to maintenance staff
Part-time Consultant/ Contractor (1999-2002).
Contracted project management; energy conservation, power distribution, lighting retrofits
Director of Engineering - Marriott Hotels and Resorts (1981-1999).
Responsible for all facets of building and grounds maintenance.
Equipment responsible for includes (2) 150 ton Carrier Chillers, (2) 200 ton cooling towers, (2) 100RP Ajax low pressure steam boilers, 70HP Ajax high pressure boiler, Automated Logic DDC energy management system, Simplex automated fire system, and Cummins diesel generator and fire pump.
Developed and initiated preventive maintenance program.
Developed and initiated customer care program.
Installed ECS energy management system.
Executed total room renovation that included remodeling of all guest rooms, as project manager selected contractors and supervised their performance until completion of project and final inspection.
Worked at several properties within a diverse demographic. Began in entry level engineering position performing all basic maintenance duties. Progressed to kitchen and laundry mechanic, and then to HV AC mechanic. Positions entailed a large amount of electrical, pneumatics, and low pressure steam applications. Installation of Andover energy management system