E. KAMALAKANNAN

Contact: **** 852**-*****

E-Mail: adcult@r.postjobfree.com; adcult@r.postjobfree.com

QA/QC. SENIOR PROFESSIONAL LEVEL

Sector Preference: Oil & gas

Location Preference: India / Middle East

A result-oriented professional with excellence in implementing quality mechanisms to deliver desired output

PROFILE SUMMARY

A competent professional with 33 years of experience in:

Quality Control/Fabrication Piping Installation/Pipeline Welding and Inspection Civil/Marine

Over 33 Years rich and extensive experience (UAE, Kuwait, Qatar, South Africa, Mozambique, and India) in an exciting EPC and construction Projects, like Onshore and Offshore Oil and Gas,) Refinery, Petrochemical, power plant Gas distribution center etc. Presently I have well experience as QA/QC. Manager TARGET ENGINEERING COMPANY.

Possess sound knowledge of SEC 1X, ASME 31.3, ASME SEC V, AWS D1.1 and API-1104.And API 650 &653 Carrying out / participating in internal & external audits and implementing project quality control system to assure that client’s policies, objectives, targets & standards are met.

Prepare review approval of PQP, Quality procedures, ITP, Method statements in the line which scope of work, Prepare review project specification, codes, and standard.

Verification and approval of all the subcontractor’s and QA/QC Procedures and verification all contractors PQR, WPS, and ITP give the approval of the client.

Review and approval of supplier QA/QC documents as per VDDR and co-ordination of TPI inspection and preparing of Project quality plan, Quality control plan. Experience in handling welding operations, quality control/assurance, fabrication & erection work for Oil & Gas and Petrochemical industry.

To make Track record in adopting and implementing stage- by a stage Quality monitoring system for ensuring adherence to technical specification and Quality Manuel and standard.

Conduct PQR, personnel Qualification of the welder, welding operator, and painting Qualification. Ability to network with engineers, client & sub-contractors on a daily basis to resolve any quality problems/issues

Conducting QA/QC. Meeting with sub-contractors to resolve the issues /concern related to Quality and ensure proper control on receipt distribution of contractual documents and drawing with assistant from document Controller. Co-ordinate with client stage wise inspection as per ITP and specification, such as fit-up, welding, visual, NDT, PWHT, hydro testing and valve installation.

Monitoring Non- conformances and following with site team for close out. Ensuring corrective/preventive action are taken to avoid repetitions of non-conformance and review of all ITP, QCP, WPS and other Quality related procedures. Vendor inspection carries out as a project requirement

Implement the QA/QC management system at the site. Coordinate with quality inspections with all the site sub-contractors and vendors coordinate all non-destructive testing and non-Destructive test on site

Coordinate with quality inspections with all the site sub-contractors and vendors coordinate all non-destructive testing and non-Destructive test on site. Coordinate with the customer’s representative on all quality matters

Coordinate all receipt inspections. Distribute relevant QA/QC documentation to site subcontractors

Verify that the quality related site activities are in accordance with the applicable codes and standards

Participate in the site internal and external site audits. Coordinate all the quality site inspections through the site QC. Engineers and QC inspectors

Ensure all quality control documentation complies and competed for as-built drawing hand over through the QC turnover engineer. Control all nonconformance reports and undertake remedial action. Compete for site quality control instructions and action remedial responses.

Review the customer's specification and undertake relevant training to the site QC. Engineers, QC inspector, and QC. Document controller. Monitor the implementation of the approved site QC Plan and Inspection Test plan.

Coordinate with the site construction manager on all quality issues Coordinate and chair the QA/QC site weekly meetings with the projects subcontractor’s QC personnel. Elaborating inspection and test programs

I have a strong background in piping welding /pipeline, fabrication installation, site management, capabilities, strong NDT knowledge and managerial skills.

ORGANISATIONAL EXPERIENCE

Sep 19 To till Now C2C ENGINEERING CHENNAI. QA/QC. MANAGER

JUNE 19 to AUGUST 19 DNV GL Third-party inspection Qatar. Senior plant inspector

Jan’16 – May 19 : Target Engineering Company LLC. Abu Dhabi. Lead QA/QC Engineer

Nov’14 – DEC’15 : AL JABER Energy Services LLC, Abu Dhabi as. QA/QC. ENGINEER

Nov’ 06 – DEC’ 14 : AL JABER Energy Services LLC, Abu Dhabi as QA/QC. Team Leader

NOV’05 – OCT’06 : GPS/AJES - Abu Dhabi as SR.QA/QC. PIPING/WELDING.INSPECTOR

SEP’03 – OCT’05 : AL JABER Energy Services LLC, Abu Dhabi as SR.QA/QC. INSPECTOR

DEC’02 – AUG’03 : GRINEKER - LTA ME, South Africa as Senior QA/QC. Engineer/NDT

Mar’00 – NOV’02 : Al JABER GRINEKER-LTA, Abu Dhabi as QA/QC. Senior Piping/welding.

MAY’96 – FEB’00 : KREMENCO. Kuwait as Sr. Welding Inspector/NDT Head

MAR’95 – APR’96 : PEMCO Inspection Company, Doha. Qatar as NDT Engineer /coordinator

JUN’94 – FEB’95 : NDT CCS, Abu Dhabi, as NDT Specialist

MAY’86- MAY’94 : SCANNRAY Metallurgical Services, Chennai, India as NDT Supervisor.

Key Result Areas

Preparing, monitoring & carrying out regular welding audits, welding procedure qualifications, welder performance qualifications and preparation of weld maps & weld sequence for welding

Inspecting & maintaining quality standards for incoming raw materials, equipment and ensuring stringent adherence to quality standards, norms & practices. Identifying gaps and taking corrective action; undertaking inspection of welding & fabrication works for dimensional accuracy.

Preparing and submitting daily / weekly / monthly performance reports and providing all technical & QC documentation and necessary advice to obtain relevant approvals for all engineering operations of the project including providing QC inputs for various project execution plans.

Verifying daily welding productions reports and ensuring compliance with NDT requirements; monitoring the status, as necessary, of all contract specifications and issuing quality documentation within the project norms

Participating in the kick-off meeting and weekly proceed progress meeting. Devising and implementing company quality assurance program in compliance with company requirements.

Monitor the performance of special process control activities, to ensure that the activities are conducted by appropriately qualified operators and that the process conducted by the approved procedure

Co-ordinate with client RT film interpretation. Which film is doubt will be clarified and PT/MPT/UT witness and painting inspection. Co-ordinate with a client for Hydro test, leak test, oil leak penetrates test, vacuum box test, and pneumatic test.

Expertise in comprehending, interpreting, and communication quality specification, fabrication drawing, welding procedures and specifications, and inspection reports. Welder/weld monitoring and maintain for NDE coverage as per line class, those having random Radiography lines.

The final dossier reports and records for handover as per ITP and as per company requirements. The witness of line flushing layup tested lines. Maintain reports and records as per project requirements

Preparing and submitting daily/monthly

Highlights

Certificate of Appreciation Award 2016 RLNG PROJECT. (GASCO)

Certificate of Appreciation Award Month of OCTO 2016 RLNG PROJECT. (ACCELERATE SERVICES)

Attained the Certificate of Excellence for delivering outstanding work in the QC Department (ALEC)

Bagged the Long Service Award G/LTA for working without industrial actions (SA)

It's SKILLS

MS Office, Excel, word, power point and Internet Applications

CERTIFICATIONS

AWS Certified Associate Welding Inspector (American Welding Society)

ASNT – RT Level II, ASNT – Ultrasonic Inspection Level II

ASNT – Magnetic Particle Level II, Penetrant Testing level II

ASNT – Film Interpretation Level II.

ASNT – Visual Inspection Level II.

Certified Radiographer License from Kuwait (RPD

Certified Radiographer Course (BARC), Mumbai. India.

MEMBERSHIPS

American Welding Society Membership

Indian Society of Non-destructive Testing Centre, Chennai

EDUCATIION

Diploma in Commercial Practice (DCP) State Institute of Commerce Education Chennai

HSC. Higher Secondary course 10+2. Govt. higher sec. School.

Other Courses

Travel Safely by BOAT OPITO Approved Course CODE-5605(ET & SDC)

ZADCO Offshore Safety Training Certificate (E T & SDC)

H2S/BREATHING APPARATUS.2016 TO 2017(GTSC)

HELICOPTER UNDERWATER ESCAPE TRAINING (GTSC

SEA SURVIVAL (GTSC)

PERSONAL DETAILS

Date of Birth : 22nd March, 1961

Permanent Address : No.19, 4th Avenue, Shanti Nagar, Velum Post-Chengalpattu (Dist.) – 603 002

Languages Known : English, Hindi, Tamil and Malayalam

Marital Status : Married

Nationality : Indian

No. of Dependents: 5

Visa Details : 29-02-2016 to 28-02-2018

Driving License Details: NIL

Passport Details : Passport No. / Expiry: K.7421132 /15-07-2022

ANNEXURE

Projects Undertaken

In C2C ENGINEERING CHENNAI AS SITE QA/QC. MANAGER

Title: BASF WE CREATING CHEMICAL CHENNAI

Client: BASF MAHENDRA CITY. CHENNAI

Period: SEP 2019 – Till Now.

Role: QA/QC.MANAGER / NDT

During this project dealing with contractor and sub-contractor. Monitoring all activities in pre-fabrication such as welding joint preparation, dimensional accuracy final weld appearance, workmanship, and installation of equipment. Monitoring all activities in pre-fabrication such as welding joint preparation, dimensional accuracy final weld appearance, workmanship, and installation of equipment. Developing/co-coordinating with contract Quality manager for the timely submission of all Quality Documentation/deliverable. Ensuring and assistant the implementation of the sub-contractor and project Quality system/plan and ensuring all inspections are done understood by site personnel/workmen and sub-contractors and providing training in the Quality systems and skill functions necessary. Prepare where necessary, statistical data which will show Quality trends.

In DNV GL THARD PARTY INSPECTION. As SITE SENIOR PLANT INSPECTOR

Title: DOLPHIN ENERGY SERVICES QATAR

Client: DOLPHIN energy ltd

Period: JUNE 19 TO AUGUST 19

Role: QA/QC. SENIOR PLANT INSPECTOR.

Experience in preparation, review of-of Test Packages and testing witness. Experience in Line walk and generating Punches. Able to prepare Pipe book and maintain other Inspection records. Follow up with Inspection Notifications and closure. Able to raise NCR's timely and ensure their timely closure. Manage Pipeline QC team and produce best results. Able to handle Inter departments and coordinate with Company personnel. Able to interpret Company Specifications and relevant Codes and Standards. Good team Leader and team member. Able to review ITPs, Quality procedures and WPS. Able to prepare MCC Dossiers and submit to Company. QC experience in Static and rotating equipment erection and testing. Knowledge of Welding processes and welding consumables. Now 5 to 15 inspectors of various disciplines in their job assignments. Overall responsible for Mechanical Qc Team to conduct following Pipeline/ piping/ welding, painting, NDT activities of inspection for all mechanical and site execution activities. Assed all applicable documents such as the scope of work drawing, Quality plans, Procedures codes, and standard. Developed the internal punch list for punch close out activities Updated the non-conformance report register and ensured timely closeout.

In Target Engineering Company LLC. As SITE LEAD QA/QC. ENGINEER

Title: EPC ALUMINA PROJECT

Client: ABU DHABI EGA/ BECHTEL/ PETROPACK

Period: JAN 2018 – JUNE 2019

Role: SITE QA/QC.NDT.HEAD

In Target Engineering Company LLC. As SITE LEAD QA/QC. ENGINEER

Title: EPC FOR CAUSEWAY PIPELINES PROJECT.MUBARRAZ ISLAND (OFF SHORE)

Client: ABU DHABI OIL COMPANY ADOC (JAPAN)

Period: JAN 2017 – Dec 2017

Role: SITE QA/QC.NDT.HEAD

Monitoring of all activities for Civil/Marine /Pipeline/Piping EPC Mechanical project. During this project dealing with ADCOC. Monitoring all pipelines activities such as welding joint preparation, dimensional accuracy final weld appearance, workmanship, and installation of the pipeline. Developing/co-coordinating with contract Quality manager for the timely submission of all Quality Documentation/deliverable. Implementation of the objective set during management review.

6” & 10” SWEET GAS and 12” & 18” SOUR GAS Line Main Pipeline material API 5L X60 each pipeline. We have used Root welding E7010 and remaining passes E8010 around 16 kilometers every diameter of welding. Preparing weekly Quality performance and documentation to the Quality Manager. Responsible for reviewing all Quality records on site and retaining them handover files.

In Target Engineering Company LLC. As SITE QA/QC. MANAGER.

Title: RUWAIS LNG TERMINAL PROJECT

Client: GASCO. RLNG TERMINAL PROJECT.CIVIL/MARINE.PIPING AND PIPELINE.

Period: Feb 2016 – Dec’2016

Role: AS QA.QC. Site MANAGER

During this project dealing with contractor and sub-contractor. Monitoring all activities in pre-fabrication such as welding joint preparation, dimensional accuracy final weld appearance, workmanship, and installation of equipment. Monitoring all activities in pre-fabrication such as welding joint preparation, dimensional accuracy final weld appearance, workmanship, and installation of equipment. Developing/co-coordinating with contract Quality manager for the timely submission of all Quality Documentation/deliverable. Ensuring and assistant the implementation of the sub-contractor and project Quality system/plan and ensuring all inspections are done understood by site personnel/workmen and sub-contractors and providing training in the Quality systems and skill functions necessary. Prepare where necessary, statistical data which will show Quality trends. Implementation of the objective set during management review.

24” Main Pipeline material of API 5L X60. We have used Root welding E7010 and remaining passes E8010 around two kilometers and different diameters of pipe welding. Preparing weekly Quality performance and documentation to the Quality Manager. To carry out internal and sub-contractor meet audit. We make preparing Hot Tap procedure /Hot Tap welding to connect 42” main pipeline to 24” pipeline. Responsible for reviewing all Quality records on site and retaining them handover files.

High-Pressure Valve, PSV, Plug Valves, Control Valves, Check Valves and Gates Valves as per heat nos. received or not to be confirmed. Industrial products including pressure part and non-pressure part components. Ensuring preparation of Final Handover Documentation and submission of quality-related documents and Final dossier, reports and records for handover as per our company procedure.

In AL JABER ENERGY SERVICES LLC. ISO 9000 as QA/QC. ENGINEER

Title: ABU DHABI OIL REFINING COMPANY (TAKREER)

Client: SAMSUNG ENGINEERING AND CONSTRUCTION COMPANY.

Period: July’15 TO DEC’15

Role: TEAM LEADER/LEAD.QA/QC.

Conduct PQR, personnel Qualification of the welder, welding operator, and painting Qualification. Ability to network with engineers, client & sub-contractors daily to resolve any quality problems/issues

Conducting QA/ QC. Meeting with sub-contractors to resolve the issues /concern related to Quality and ensure proper control on receipt distribution of contractual documents and drawing with assistant from document controller. Co-ordinate with a client for carries out stage wise inspection as per ITP and specification, such as fit-up, welding, visual, NDT, PWHT, hydro testing and valve installation. Monitoring Non- conformances and following with site team for close out. Ensuring corrective/preventive action are taken to avoid repetitions of non-conformance and review of all ITP, QCP, WPS and other Quality related procedures. Vendor inspection carries out as a project requirement.

Planning and distribution and allocation of inspection of inspection activities to inspectors and monitoring day to day activities of each discipline inspectors and co-ordination with clients and sub-contractors to execute the QA/QC. Activities and Attend site QC meeting ensuring company Quality requirements are fully discussed. Responsible for reviewing all Quality records on site and retaining then handover files. Ensuring preparation of final handover documentation and submissions of Quality related documents.

Expertise in comprehending, interpreting, and communication quality specification, fabrication drawing, welding procedures and specifications, and inspection reports. Welder/weld monitoring and maintain for NDE Coverage as per line class, those having random Radiography lines. To keep up services and QC manager regularly updates regarding the Quality services.

Title: Offshore Island - ZAKUM Development Company (ZADCO)

Client: ZADCO Upper ZAKUM UZ750 Project for South, North, Central and West Island

Period: NOV’14 – JUNE’15

Role: Site.QA/QC.TEAM LEADER

Maintaining the ISO systems requirements in the organization as and QA/QC In charge. Conducting Internal ISO Audit and arranging Management Review Meeting. Conducting the Quality and Prequalification audit at Supplier and Sub-contractor premises. Conducting PQR and Welder qualification test with various Codes. Inspection of Incoming Materials, such as plates, pipes, beams, channel, angle, welding consumable etc. Inspection various activities In-Process & Final stages at shop and site. Monitoring and coordination of equipment’s' calibration with calibration agency. Co-ordination with Customer / Third Party Inspection. Co-ordination with Customer / Third Party Inspection agency, and NOT agency. Inspection Preparation of Customer Inspection Reports at different stages, the offering products to customer or their representatives (TPA) at different stages as per ITP/contract requirements. Coordinating with different departments in the Organization. Analyzing & attending customer complaints within the Organization frame work.

Title: RUWAIS Sulphur Terminal Project (RSHT-2) Mechanical

Client: GASCO

Period: Sep’12 – Oct’14

Role: QA/QC. SUPERVISOR.

Guiding the control of repair welding, reviewing & interpreting drawings and reviewing/interpreting of drawing and review of all NDT activities. Carrying out / participating in internal & external audits and implementing project quality control system to assure that client’s policies, objectives, targets & standards are met. Preparing, monitoring & carrying out regular welding audits, welding procedure qualifications, welder performance qualifications and preparation of weld maps & weld sequence for welding. Inspecting & maintaining quality standards for incoming raw materials, equipment and ensuring stringent adherence to quality standards, norms & practices. Identifying gaps and taking corrective action; undertaking inspection of welding & fabrication works for dimensional accuracy. Conducted welder Qualification as per sec IX and structural welding as per SEC AWS D.1 Witnessed and Welder qualification position of 1G, 2G, 3G, 4G, and 6G. Stacker Declaimers of portal welding as per GASCO approved WPS and ITP and QCP for piping and welding activities. Facilitated the rail alignment inspection release for concrete/ after concrete alignment inspection. Prepared documents for welding works and identifying material classification & physical condition for damaged materials and equipment. Tank joint welding and inspection for field erection as per API 650 around four tanks open and floating tank. Tanks out of services inspection asper API 653. Preparation of inspection reports/certificates with all findings, evaluations and recommendations. Prepares inspection test plan, QA/QC plan, check lists and method of statement. Thickness evaluation of Tank shell, Bottom / Annular plates, roof and nozzles. Inspection during Tank construction by Fit-up and welding. Inspected by peaking, banding and Plumpness. Tank settlement evaluation as per API 653 Appendix B. Tank roundness and plumpness evaluation as per API 653.

Title: RUWAIS Refinery Expansion Project (RRE-2. Mechanical)

Client: SK Engineering and Construction Company (KORIYA)

Period: Feb’12 – Aug’12

Role: SR.QA/QC.PIPING/WELDING INSPECTOR.

Title: Fluorine Complex Project- ICAD II

Client: Gulf Fluorine / SIMON CARAVAN

Period: Sep’10 - Jan’12

Role: QA/QC. SUPERVISOR

Verifying daily welding productions reports and ensuring compliance with NDT requirements; monitoring the status, as necessary, of all contract specifications and issuing quality documentation within the project norms

Co-ordinate with client RT film interpretation. Which film is doubt will be clarified and PT/MPT/UT witness and painting inspection. Co-ordinate with a client for Hydro test, leak test, oil leak penetrate test, vacuum box test.

Expertise in comprehending, interpreting, and communication quality specification, fabrication drawing, welding procedures and specifications, and inspection reports. Welder/weld history and maintain NDE coverage.

Verifying daily welding productions/reports /Quality of welding and ensuring compliance with NDT requirements. Co-ordinate with the client any Quality part of issue NDT jobs like RT/UT/MT/PT and PWHT witness

Title: BOROUGE 2 ETP Project (Effluent Treatment Plant)

Client: TECHNICAL RENIDUAS Spain Company

Organization: Al Jabber Energy services

Period: Jan’08 – Aug’10

Role: SR.QA/QC. TANK/PIPING/WELDING INSPECTOR.

This project inspected by Piping, structural and storage tanks inspection. All applicable documents such as scope of work drawings, quality plans, procedures, codes and standard. Tank joint welding and inspection for field erection as per API 650 around four tanks open and floating tank. Tanks out of services inspection asper API 653. Preparation of inspection reports/certificates with all findings, evaluations and recommendations. Prepares inspection test plan, QA/QC plan, check lists and method of statement. Thickness evaluation of Tank shell, Bottom / Annular plates, roof and nozzles. Inspection during Tank construction by Fit-up and welding. Inspected by peaking, banding and Plumpness. Tank settlement evaluation as per API 653 Appendix B. Tank roundness and plumpness evaluation as per API 653.MFL (Magnetic Flux Leakage) and Vacuum box evaluation for Tank floor. Inspect the top, bottom and sides of the container to observe for exterior dents, bulges, holes, missing bungs or caps, rust or other signs that might indicate leakage or potential leakage of contents. Standard Bottom plate lap joint testing. Witnessing Tank hydro test along with stage -wise settlement evolution. Supervision of multi-disciplined NDE inspectors to complete client inspection

Title: ICAD II Gas Distribution NetWorks

Client: Zone Corporation (ADNOC) Abu Dhabi, UAE

Period: Nov’06 – Dec’07

Role: QA/ QC. PIPELINE WELDING Engineer.

Conducted inspection of all activities in cross country pipeline project such as welding joint preparation, alignment, dimensional accuracy final weld appearance and workmanship.35 KM gas pipeline for industrial gas line 18” & 12” Dia. material of API 5L Gr.46. Monitoring of stringing, bending and thrust boring. Witnessing of tie joints road crossing and golden joints. Consumables storage for electrodes, portable hotbox and welding machine calibration. X-Ray and Gama X-Ray Film interpretation according to codes and standards. Welding related work in SMAW, GTAW, and FCAW (inner and outer shield) GMAW. All kinds of NDT activities of like RT, UT, MT, PT and visual inspection witness. Controlled QC activities such as procedure & welder qualification witness as per API1104. Developed procedures and WPS correct welding parameters of AMPS and volts. Executed ISO 9001-2000 Quality Management System.

In Global Process System

Title: GPS (FABRICATION SHOP)

Client: QGPC-KPCC and UOP’S

Period: Nov’05 – Oct’06

Role: SR. QA/QC. PIPING/ WELDING /NDT CO-ORDINATOR.

Preparing and submitting daily / weekly / monthly performance reports and providing all technical & QC documentation and necessary advice to obtain relevant approvals for all engineering operations of the project including providing QC inputs for various project execution plans. Verifying daily welding productions reports and ensuring compliance with NDT requirements; monitoring the status, as necessary, of all contract specifications and issuing quality documentation within the project norms. Co-ordinate with client RT film interpretation. Which film is doubt will be clarified and PT/MPT/UT witness and painting inspection. Co-ordinate with a client for Hydro test, leak test, oil leak penetrates test, vacuum box test, and pneumatic test. Expertise in comprehending, interpreting, and communication quality specification, fabrication drawing, welding procedures and specifications, and inspection reports. Welder/weld monitoring and maintain for NDE coverage as per line class, those having random Radiography lines.

Other Projects:

In AL JABER Energy Services

Title: AL TAWELAH Gas Receiving Facilities Off-site Pipeline

Client: Dolphin Energy Services, UAE

Role: Sr. QA/QC. Piping/welding

Title: Unleaded Gas Line/Low Sulphur Gas Oil Project (ULG/LSGO)

Client: TECHNIP Italy (SPA)

Period: Sep’03 – Oct’05

Role: Sr.QA/QC. Piping/Welding.

In GRENEKER South Africa

Title: TAMANI Pandey Development Project, Mozambique

Client: Sasol Technology (PTY) Ltd. /Foster Wheeler

Period: Dec’02 - Aug’03

Role: Senior QA/QC. Engineer /NDT

In AL JABER GRINEKER LTA. Abu Dhabi

Title: BOROUGE Petrochemical Project/Sulphur Plant/Ethylene Export

Client: Bechtel / LINDE

Period: Mar’00 – Nov’02

Role: QA/QC. Senior Piping/welding

In Kerman Co.

Title: Equate Ethylene Project (CCC), KNPC, KOC

Client: China Petroleum Project

Period: May’96 – Feb’00

Role: Senior welding inspector/NDT Head

In PEMCO Inspection Company

Title: QGPC Offshore PS1 TO PS4

Client: DOPET &QGPC

Period: Mar’95 – Apr’96

Role : NDT Engineer/ Coordinator

In NDT CCS

Title: OGD 545 Oil & Gas Project

Client: CCC

Period: Jun’94 – Feb’95

Role: NDT Specialist

In Scaanray Metallurgical Services

Title: ONGC PIPELINE

Client: ONGC

Period: May’86-May’94 Role: NDT Tech/ Supervisor. Role

: NDT SUPERVISOR.



Contact this candidate