Post Job Free

Resume

Sign in

Engineer Power Plant

Location:
Paris, Ile-de-France, France
Posted:
April 16, 2020

Contact this candidate

Resume:

Job Objective

Extensive experience in managing key projects with experience in instrumentation & control, client & sub-contractor management and ramping-up projects within time, budget & quality parameters as per project management & best practice guidelines, targeting assignments in:

Instrumentation

Competent professional with 15 years of experience in executing process measurement & control instrumentation & services to optimize manufacturing processes

Preparation/Review of Instrumentation, Automation and Electrical Documents including P&IDs, Instrument List, Instrument Datasheets, Instrument Loop Wiring Diagrams, Instrument Hook Ups (Smart Plant Instrumentation (IN tools)), I/O list, Automation System Configuration Drawing, Automation system Functional Description, GA and Wiring Diagram of Automation system, Electrical Load list, Cable Datasheets, Equipment, Cable, Earthinglayouts.

Technical Support for Procurement through Proposal Evaluations and TechnicalNegositations.

Preparation, Issuing Clarifications and Approval of Client EIA Engineering Documents.

Inspection of Electrical, Instrumentation and Automation Deliverables for the project.

Site Supervision for Erection, Testing and Commissioning of Electrical, Instrumentation and Automation equipment.

Ensuring calibrations and maintenance of equipment; scheduling predictive & breakdown maintenance jobs with key focus on spares availability & root cause analysis

Participate to the witnessing of the Control room

Maintaining and ensuring stringent adherence to quality standards, norms & practices, identifying gaps and taking corrective action

To control continuous operation of the units under care

Installing and commissioning as well as conducting tests & inspections to ensure operational effectiveness of plant & utilities; planning & effectuating maintenance schedules for equipment

Execute appropriate processes needed for start, operation and interruption of an installation / equipment or a production unit, in compliance with procedures and instructions

Exceptional operational analysis, strategic/capacity planning, and decision-making strengths

Participate to the review of the OTS

Skilled in routing & support planning, project documents like deliverables list, design verification plan, design basis & project awards review including Instrumentation Diagram & Drawing (P&ID) requirements, safety & integrity requirements, operations & maintenance requirements, goods engineering practices & client comments & requirements

To ensure implementation of operation procedures and safety and environment rules

Good understanding of specific Engineering discipline.

Knowledge of commissioning software.

Good command of written and spoken English.

Good technical knowledge and skills.

Good Communication skills.

AUGUST 2019 TO TILL DATE NATIONAL OIL WEL VARCO UAE

AS AN E&I ENGINEER

DEC-17- TO JULY 2019 SYMBIOTIC CONTROL & INSTRUMENTATION

PVT.LTD BENGALURU, KARNATAKA, as instrumentation Engineer

July-15-Sep’ 17 Gulf Petrochemical Services & Trading LLC, Oman as Instrumentation Engineer

Jun’14-May’15 MED GULF Construction Co. W L L. Doha, Qatar as Instrumentation Project Engineer

Sep’13-Jan’14 Dodsal Engineering & Construction Pvt. Ltd., Abu Dhabi as Instrument Commissioning Engineer

May’12-Jun’13 Kelton Controls, Kudankulam, Chennai, India as Instrument Commissioning Engineer

Dec’09-Nov’11 Kentz, Saudi Street, Saudi Arabia as Instrument Engineer

Jul’07-Jul’09 Washington Group of International & Al-Jaber Energy Services, Doha as Instrument Engineer

Ap’06- Jun’07 Rashtriya Chemicals and Fertilizers Limited. Chembur as Instrument Engineer

Mar’05-Mar’06 Pro-tech Engineers & Controls Jammohammed Estates, Mumbai as Instrument Engineer

Sep’04-Feb05 Anil Engineering Pvt. Ltd. Mumbai as Instrument Engineer

Key Result Areas:

Planned methods sequence for instrument calibration and erection.

Preparation of Technical Bid evaluation related Instruments based on the offer.

Preparation of data sheets as per the Tender documents and Specification,

Preparation of cable block diagram, cable routing layout, Junction Box Termination Drawing.

Instrument Tagging and numbering allocation on P&ID as per the project Specification

Submitting the Documents for Client Approval

Making the Technical Query for the instruments based on the technical offer

Preparation of Comment Resolution Sheet for submitting to client for getting the document approval

Preparation of Instrument index by review the P&ID with the use of INtools.

Ensuring the execution of schedule progress report and recorded activity deviation in the field.

Preparation of cable Schedules & Interconnection diagrams.

Preparation of Instrument specification sheet (ISS) with the use of specification module and process module in INtools.

Formulated data sheet of each instruments, conducting the loop checking with Client and Vendor.

Preparation of Process Hook-Ups and Pneumatic Hook-Ups with the interpretation of INtools as well as AutoCAD and calculation of BOQ.

Performing cable sizing, cable routing & scheduling with INtools, Excel.

Preparation of Instrument mounting typical and Material Take-off list (MTO).

DCS & Instrument panel layout inside control room.

Preparation of Junction box details and Cable tray layout design.

Assessed areas of obstruction / breakdown and taking steps to rectify the equipment through application of troubleshooting tools

Coordinate with the construction/third party agency to make the as built in the project site.

Onsite coordination for the modification and updating of Hook up, index, Additional Loop creation, MTO etc.

Vendor drawing review & Coordination with other disciplines.

Interaction with Project, Proposal, Procurement & Construction team.

Prepared field instruments like; Hook-up, Cable Tray Route, Cable Schedule, Impulse Piping Layout Drawing by observing P&ID approved Drawings

Planning and effectuating predictive & preventive maintenance schedules for various equipment to increase machine uptime & equipment reliability

Coordinating designing & production process for any kind of alterations required as per the clients requirements in the design of the equipment.

Preparation of project scope of work.

Selection & Sizing of various Instruments like control valves, flow meters, thermo wells, relief valves etc.

Anchoring erection & commissioning of equipment and ensuring completion of project in minimum turnaround time with effective resource utilization to maximize the output

Executed installation and commissioning of the heavy equipment to ensure operational effectiveness of machinery

Checked requirements/specifications upon discussions with engineering consultants, technical collaborators, external suppliers, sub-contractors and owners/clients

Monitor and maintain Control-Loop tuning on Process Control Systems to ensure the availability of best quality of control to the operators to meet operating targets.

Co-ordinate and participate in the System Support multi-disciplinary teams, conduct regular system checks, perform system upgrades and take system backups regularly as a part of process monitoring to ensure best system reliability and integrity.

As a part of system support teams, inform other members about system changes and problems and seek assistance to resolve system faults.

Conduct regular control systems performance analyses to forecast and plan for system upgrades and enhancement for improvements.

Prepare control system guidelines, standards, procedures and policies and keep it up to date.

Prepare ERs to obtain budgetary approval from management for all assigned projects and follow up with expenditure reviews and forecasts to ensure adequate control and monitoring of project expenditure in line with the approved budget and schedule. Conduct cost benefit analyses with viable alternatives to ensure project benefits commensurate with costs.

Prepare relevant documents such as project scope, feasibility and depth studies, business system designs, functional specifications, user procedures, conversion design, display and database configuration design and implementation plans for approval by all involved groups at relevant stages of the project towards effective implementation.

Perform necessary detailed design tasks, coordinate and monitor all ancillary services including project drafting services, services by external groups such as Licenses and approvals from regulatory bodies, work assigned to other departments and divisions, etc., to finalize working specifications, calculations and secure approval for all engineering documents and drawings by the concerned authorities.

Prepare material and equipment Specification, issue requisitions, evaluate Vendor offers, raise technical queries, and prepare technical bid analysis to ensure availability of all Materials required for completing the construction work of the project.

Major Project Managed

Project: Gas Detector System

Skill Set

SIL

Fire & Gas Systems/ESD systems ( Emerson/Yokogawa/Honeywell)

Rotrok ( Pakscan)

PBM (Plant Blenty Management) Total Plant Profit system.

Turbine Machinery

Steam Generators

Thermal Control System

Distribution Control Systems (DCS) (Emerson/Yokogawa/Honeywell)

Burner Management System (BMS)

Pipelines Instrument Equipment in the Plant

(GE) Gas Turbine Control and Protection System

Programming Logic Control (PLC) with ESD Systems (Emerson/Yokogawa/Honeywell)

B.Tech. (Electronics & Instrumentation Engineering) from Govt. Engineering College, Calicut, Calicut University, Kerala in 2004

IT Skills

MS Project, MS Office and Internet Applications

Date of Birth: 16th January, 1981

Residential Address: Be Joy House, Ammancheriparamba, Post Kuthiravattom, Kozhikode-673016, Kerala

Languages Known: English, Hindi, Tamil & Malayalam

Passport Details: Number: N4889330

Place of Issue: Muscat, Oman

Date of Issue: 17-03-2016

Date of Expiry: 16-03-2026

Please refer to annexure for details on projects

Annexure

Organization : NATIONAL OIL WEL VARCO UAE 13th Roundabout Jebel Ali Free Zone Dubai, PO BOX61490

Role: E&I ENGINEER

Duration: August 2019 to Till date

Preparation of Instrument, Instrument Cable data sheet, checking the P&ID, Making the TBE with technical offer.

Preparation of I O list, Instrument index, Instrument list, Alarm & Trip settings.

Reviewing Technical Offers and Provide the Comments for Clearing the Quotation as per the Tender Document.

Checking the HMB with P&ID to prepare the Data sheet.

Organization: Symbiotic Control & Instrumentation PVT. LTD, Bangalore, Karnataka

Role: Instrumentation Engineer

Duration: Dec17- JULY 2019

Organization: Gulf Petrochemical Services & Trading LLC, Muscat, Oman

Role: Instrumentation Engineer

Duration: Jul15-September 2017

Key Result Areas:

Designing and developing new Control System. Testing maintaining and modifying existing systems

Analyzing data and presenting findings in written reports, managing operations, working collaboratively with design engineers operation engineers, purchasers and other internal staff

Liaising with Clients, Suppliers, Contractors and relevant authorities

Project management with in cost and time constrained environments. Understanding and ensuring compliance with relevant health and safety regulations and quality standards

Providing advice and consultancy support, Purchasing equipment

Writing computer software and test procedures

Developing new Business proposals. Supporting PBM activities in the ORPIC Refinery Storage Facilities

Receives Project documentation and understands Scope of Work related to his discipline what is required.

Lead a team to undertake commissioning activities in small projects.

Interfaces with other disciplines to ensure integration of activities.

Implement & test the subsystems as per project commissioning test sheets.

Preparation of method statements, procedures and routines where required.

Interface towards Pre commissioning and Company personnel.

Reports on work progress, bringing to notice potential problems or delays and recommends solutions.

Assist during the database preparation for pre commissioning status index and commissioning technical database.

Plan, Monitor and assist in Vendor activities as required.

Ensure temporary supplies and commissioning spares are adequate for the sub system testing.

Perform inter-discipline checks.

Compliance in accordance with HSE Standard.

Organization: MED GULF Construction Company W.L.L.

Doha, Qatar

Role: Instrument Engineer

Duration: June 2014-May 2015

Description: Support Emerson Ovation’s field-proven control system, YokogawaCentum VP TDC& DeltaV distributed control systems; NCF changes, native window, Native Window graphics, as well as, GUS and DeltaV graphic design and modifications, Configure control loops and maintain system health; Foundation Field bus configuration and implementation. Design and built DeltaV control schemes using Delta V Control Studio.

Highlights:

Checked project specifications, scope of work, installation drawings and vendor documents

Coordination with design consultants, vendors, suppliers

Procured materials from suppliers and Vendors as per the project planning

Formulated inspection & test plans, method statements and job hazard analysis

Assessment of cost and time implications of design changes/new designs

Helped QA-QC department in technical assessment, construction issues and non-conformities

Prepared design basis preparation of specification material requisition

Involved in pre-commissioning and commissioning Qatar Petroleum Project in Ras-Abu Fontas at Wakrah

Technical Bid Evaluation and Vendor Drawing Review, HAZID, HAZOP & SIL Studies,

Factory Acceptance Tests (FAT) and Site Acceptance Test (SAT)

Organization: Dodsal Engineering & Construction Pvt. Ltd., Abu Dhabi

Role: Instrument Commissioning Engineer

Title: Habshan Sulphur Granulation Plant Project 5267

Client: GASCO, Abu Dhabi

Period: Sep’13 to Jan’14

Keltron Controls/ Kudankulam, Chennai, India

Title: Kudankulam Nuclear Power Plant Project

Client: Nuclear Power Corporation of India Ltd., Kudankulam, Chennai, India

Period: Mar’12-Jun’13

Other Projects

Kentz, Saudi Street, Saudi Arabia

Title: JAC Commissioning Project & Utility 1st and 2nd Project

Client: Saudi International Petrochemical Company

Location: Jubail

Period: Dec’09 to Nov’11

Al- Jaber Energy Services Raslaffan Doha Qatar

Title: Common Sulfur Granulation Project

Client: Qatar Gas II

Location: Raslaffan Industrial City Doha Qatar

Period:July-2007 to July-2009

Job Title: Instrument Engineer

Company: Rashtriya Chemicals and Fertilizers. Chembur, Mumbai

Period: April 06-June 07

Job Title: Instrument Engineer

Company: PRO TECH ENGINEERS & CONTROLS

Client: NTPC, Kayamkulam

Period: Mar’05-Mar’06

Job Title: Instrument Engineer

Company: Anil Engineering Pvt. Ltd Mumbai, India

Period: Sep’04-Feb-05

Organization Rashtriya Chemical & Fertilizers Limited, Chembur (Mumbai)

Organization Honey Well Automation India Limited, Pune

BEJOY HOUSE

Ammancheriparamba

Post- kuthiravattom

Pin-code-673016

Kozhikode, Kerala, India

+971*********

adctza@r.postjobfree.com/ adctza@r.postjobfree.com

adctza@r.postjobfree.com

Core Competencies

Project Management

Instrumentation

Commissioning

Maintenance

Installation

MIS/ MIR

Procurement

Engineering

Soft Skills

Communicator

Innovator

Collaborator

Communicator

Innovator

Career Timeline

2019-

2017 -2109

2015-2017

NATIONAL OIL WELL VARCO UAE

SYMBIOTIC CONTROLS & INSTRUMENTATION

Gulf Petrochemical Services & Trading

2014-2015

MED GULF Construction Co

2013-2014

Dodsal Engineering & Construction Pvt. Ltd

2012-2013

Keltron Controls

2009-2011

Kentz

2007-2009

Washington Group of International

2006-2007

Rashtriya Chemicals and Fertilizers Limited

2005-2006

Pro-tech Engineers & Controls

2004-2005

Anil Engineering Pvt. Ltd

BIJOY PARAKKAL

STRATEGIC PROFESSIONAL

Profile Summary

Organizational Experience

Academic Details

Personal Details

Insert ph oto



Contact this candidate