PROFESIONAL SUMMARY
- Profesional experience in oil and gas industrie services both (Onshore-Offshore)and service for
several years and directl exposed with (EPCComm) Engineering,Procurement
Construction Fabrication & Commissioning,Maintenance service,and Power Plant & Utility
- SAP & Planning work path method
- CMMS knowledge
- SCM,materials and contract management offices
- Scheduling methodologies such as CPM (Critical Path Method)
- Ability to work under pressure and multitasking both in team work or individual basis
- Have a high motivation,integrity,networking and coordination
- Have was advance project contruction,various project scheduling methods
- Have a good administrative skill,team work,problem solving,creative and honesty
OBJECTIVE
Contribute fully and maintaining high standards of accuracy and attention to detail of the company achievement by working smart,Schedule & Planning, dedicated, responsible, trustworthy and be independency employee along with challenging people, and implementation and commit with QHSE standards
PERSONAL DATA
Name Wanda Firmansyah
Place & Date of Birth Padang, 15th April 1986
Address Jalan Kalibata Utara II No.17 Jakarta Selatan – DKI Jakarta
Email address adctae@r.postjobfree.com
Gender Male
Age 32th
Religion Moslem
Passport No. A 3908987
Contact Number +62-852-******** / +62-812**-******
EDUCATION
2004– 2009 College Student of Computer Science (S1)
Putera Indonesia YPTK University Padang - West Sumatera
Major : Engineering System Information of GPA 2.75 Grade A
2001 – 2004 Senior High School
SMU Swasta Semen Padang – West Sumatera
Major : Science Politic and Social (IPS)
1998 – 2001 Junior High School
SLTP Swasta Semen Padang – West Sumatera
1992 – 1998 Elementary School
SD Swasta Semen Padang – West Sumatera
COMPUTER & TECHNICAL SKILL
Operating System OS Windows 10,Ms Office,Microsoft Project 2010 -2013,Primavera P6 (P6.R8.2) Project Planner & QDMS Document Control systems
Programme VisualBasic 6.0,C++, VBsript Server
Database Ms SQL Server . Oracle
Language English – Bahasa
PRACTICAL ON THE JOB
1.Computer Engineering Basic @ Mirga Daya Komputer.
2.Computer Security System @ Putera Indonesia YPTK Padang University.
3.Implementing Ms SQL Server2005 Database @ Activetraine.
4.Developing Web Application using Ms Visual Studio 2008 @ Activetraine.
5.Electrical Maintenance of Commercial High Building @ Tridinamika Jaya Instrument.
6.Bina Nusantara English Proficiency Test Course.
7.Ms.Project 2007-2010 and Primavera P 6 @ LM PATTRA HARVEST JAKARTA.
8.Ms.Project 2013-2016 @ Srikandi Consultant Jakarta
9.T_BOSIET (Tropical – Basic Offshore Safety Induction & Emergency )@ PT Baron Internasional OPITO
10.Leadership Health and Safety Environmental & First AID (LIHES).
11.ISO 9001 : 2008 Quality Management System.
12.OHSAS 18001 Safety and Health.
13.ISO 14001 Implementing Environmental Management System.
14.Rigging and lifting Trainee of PT Shaftindo Energy.
15.PTO, LOTO, Working Hight and Safety basic Training Cource at PT Petrosea Tbk.
16.Basic Fire fighting @ PT Indohes Magna Persada.
17.Basic First Aider @ PT Indohes Magna Persada.
18.K3 Migas @LSP Migas
PROFESIONAL EXPERIENCES
(Nov 19 – Present) Company : PT Jaya Construction Management
Position : Project & Doc.Control Engineer
Job Family : Construction & Power Plant
Status : Direct Contract
Project :
- SULBAGUT-1 (2x50MW) CSFPP - Coal Steam Fired Power Plant
PT Toba Bara Consortium PT Gorontalo Listrik Perdana J.O PT Shanghai
Electric Power Constructions Ltd. - North Sulawesi
•Development and detailed project master schedule,incorprating
milestone and keydate during the excecution plan, for proper planning
and supervisition at all levels
•Prepare project measurement,update progress construction
report to client as per periodicity actual & forecasting required by client
•Monitor project schedule,including summary current status,critical path,
Technical progress,forecasting of remaining work
•Follow up procurement schedule listing all materials
(Mechanical,Electrical & Instrument) equipments required in the project
to help purchasing dept
•Monitor progress periodically triggering any lag to stakeholders and assist to SM activities
•Preparing project meeting with owner,EPC and Consultant discuss progress construction and S-Curve presentation
•Assist.Document review as technical procedure such as ITP,NCR,RFI,DCN
& ITN (i.e by QDSM system Document Controls)
(May 19 – October 19) Company : PT Elnusa Tbk
Position : Project Control Engineer
Job Family : Oil & Gas
Status : Direct Contract
Project :
- Planning, Procurement and Construction (EPC) Services for Gas Pipeline
Distribution & Development - PT Pertamina Gas (Persero) Kuala Tanjung
Nort Sumatera
- OCS ( Onshore Maintenance Services & Facilities ) at ConocoPhillips
Grissik Ltd – South Sumatera
-Oil Spill Responder Project YYA-1 Platform PT Pertamina Hulu Energi
Offshore North West Java
- Turn Around (TAR) Project MRA-14 101 RFCC at PT.Pertamina (Persero )
Refinery unit IV – Cilacap Central Java
Assist Project Managers with day to day project tasks
Prepare and maintaining project status reports, including meeting with project team members to gather information
Assist with developing schedules for proposals and projects
Update construction master schedule (Resources loaded,WBS Based) based on actual progress & actual contract
May attend meetings with clients
Manage single / two discipline projects while being mentored by Project Manager
Responsbilities may include working the with estimating and cost/budget group to help develop estimates and manage cost
(Sept 18 – April 19) Company : PT Grama Bazita Indonesia
Position : Scheduler & Planner
Job Family : Oil and Gas
Status : Contract Completion
Project :
- (ME & EL) New Plant Factory PT Forisa Nusapersada Food &
Beverage Manufacturer Plant Semarang – Central Java
Organize & prepare matter prior work execution, establish master schedule (Up to level 4) & S-Curve,drawing,prepare manpower,prepare material,tools & consumables
As supervision coordinate and controlling all activities at (MEP & EI and Civil)
Monitor and controlling master progress report and S-Curve
Produce scheduling of the job (MEP & EL and Civil) for execution of the work
Monitor construction of : MEP & EI and Civil work and ensure they are completed as per approved engineering documentation and project specifications
Update construction master schedule (Resources loaded,WBS Based) based on actual progress & actual contract
Support for write Permit & JSA construction in monitoring and appraising sub-contractor’s activities
Ensure & coordinate with material controllers shipment material activity
enure all activities in project are effective and efficient in timely manner conform to the project schedule and budget.
Create Report & VO (Daily & Weekly)
Coodinate with client & rutine weekly presentation as report progress construction
(Oct 17 – March18) Company : PT Istana Karang laut ( Entrepose Group)
Position : Schedule & Planner
Job Family : Oil and Gas
Status : Contract Completion
Project
- Engineering,Procurement,Construction Commissioning and Start-Up
at SYLHET GAS FIELD LIMITED I and II - Bangladesh
- Off Grid Power Plants 3 Villages in Berau Regency – East Kalimantan
Prepare at outset of project,schedule of project & proposal according to update/revise schedule as required by project/proposal
Monitor progress in coordination with document control and engineering and identify areas of concern and potential late issue
Monitor progress reports from vendors and incorporate in progress reports
Monitor expediting reports and incorporate in progress reports
Monitor progress reports from construction and incorporate in progress report
Issue weekly and monthly progress reports identifying areas of concern and late issue
Assist project team to develop status report to keep management informed on project progress
Comply with Health and safety policy and procedure at all times in the workplace
The duties and responsibilities in this job description are not exclusive or exhaustive and the post holder will be required to complete such duties as may reasonably be expected within the scope and grade of the post
(June 17 – July 17) Company : PT Tracon Industri (TRACON)
Position : Project Control
Job Family : Oil and Gas
Status : Contract Completion
Project :
- Turn around (TAR) and Plant Stop (assist and implementation
monitoring,Inspection mechanical work of HE,Vessel,Heater and
Piping) at PT.Pertamina (Persero) Refinery unit II Dumai – Riau Province
- Golden Chemical Renewable (GCR Project) Construction at PT
Energi Sejahtera Mas,Lubuk Gaung Dumai – Riau Province
Planning and monitoring progress reporting of turn
arounds,shutdowns plan of oil refinery (PT.Pertamina RU II)
Interface with operations,Inspector,and contractors engineering to
develop accurate and workable work scopes
Update job pack tracking sheets Identify any engineering drawings
required for execution of job plan
Assist in development of the TAR worklist; communication worklist quality standard to business team (PT.Pertamina RU II)
Prepare closure forms for all equipment ex Permit & JSA
Review schedule of individual equipment (CPM) communicate any concerns to lead project control
Identify pre TAR requirements and track progress vs. schedule using Primavera P6
(June 16 – Jan 17) Company : PT Meindo Elang Indah
Position : Project Control
Job Family : Oil and Gas
Status : Contract Completio
Project :
- Provision of Construction Service ( GELONGGONG RIVER
BRIDGE REPAIR ) ExxonMobil Cepu limited - Onshore
-ALAS TUA WEST WELL PAD – ExxonMobil Cepu limited.
-Module and PAU Fabrication Work – SNC Lavalin
-Bangka TOPSIDES Facilities Offshore – PT Chevron Indonesia
-Piping Prefabrication and Painting Work (Inc.Tank Work) PT Pertamina KSO JGC Cooperation.
Preparing master scheduler (Up to level 4) project using primavera P6
Check progress measurement prepared by project report
Make sure project management documents and reporting are following schedule
Update construction master schedule ( Resouces loaded,WBS based)
Prepare daily & weekly progress report and make sure official issuance before the weekly meeting
Coordinate with project manager in preparing cost planning
Review man hours plant vs construction progress
Review man hours report issued by yard and site highlight the overrun
Clerical and administrative supporting document
Integrate construction engineering documents, material status related to construction progress report
Indicate if there is any additional work to be change order
To fulfill HSE regulation
(June 15 – Feb 16) Company : PT Petrosea Tbk
Position : Quantity Surveyor Engineer
Job Family : Mining & Metal
Status : Contract Completion
Project :
- IndoMet Coal Project Lampunut North Road Stage #01 Work
Construction BHP Billiton – Central Borneo
access Road & East Levee Stockpile Project PT Freeport McMoran Copper and Gold – MP38 Timika
Preparing tender and contract documents, including bills of quantities with the relevant parties (ex: architect or client)
Identifying, analyzing and developing responses to commercial risks, performing risk, value management and cost control
Undertaking cost analysis for repair and maintenance project work
Assisting in establishing a client’s requirements and undertaking feasibility studies
Providing advice on contractual claims and procurement strategy to resolve disputes between clients, designers and building contractors
Analyzing outcomes and create detailed progress reports
Maintain and implementing HSE programs including Environmental Management System to ensure the effectiveness of the programs conform to official standard and requirement
(Jan 15 – Mei 15) Company : PT Advanced Offshore Contractor Services
Position : Project Coordinator
Job Family : Oil and Gas
Status : Permanent
Project : Diving Services,Underwater
IMR,DrillingConstructions,ROV Services TOTAL E&P Indonesie
Handil II - East Kalimantan
Supervision on charge in maintenance,repairing,service,system of ROV (Remote Operated Vehicle)
Asst.ROV Pilot / Operator /Technician
Operate Critical equipment’s and systems of all process
Inventory and fixed assets
Project Engineering,Calculation,Estimations and Management
(Oct 14 – Dec 14) Company : PT Shaftindo Energy
Position : Project Control
Job Family : Oil and Gas
Status : Contract Completion
Project : Onshore Project Gas Plant Suban #13,#14
Flowline and Wellsite Facility Conocophillips Indonesia – South
Sumatera
Perform on charge of planning master schedule (Up to level 4) and controller at the feasibility Engineering,Procurement,Construction stages of the projects
Supervision & Monitaring project activities include contractors – Sub Contractors
Support write Permit & JSA before excute all construction activities
Update overall of master schedule (Resources loaded,WBS Based) the quality,accurate and critical using WBS preparation
Monitoring contractors overall projects report ( Engineering,Contruction & Pre-comm,Commissioning)
Prepare presentase internal / owner Weekly meeting
(March 14 – Aug 14) Company : PT Sarku Enjinering Utama
Position : Project Planner
Job Family : Oil and Gas
Status : Contract Completion
Project : Major Maintenance,Hook-Up,Commissioning,and
Construction Offshore Project South- North Belut WHP-D Platform at
Conocophillips Indonesia
Perform project planning & development,Implementation,maintenance of project master schedule (Up to level 4) using Primavera P6
Monitoring progress against plans and variance analysis
Assist in the development and maintaining of the department budget cost estimates
Analyze schedule variances and recommend corrective action
Work with project coordinator and client’s designated staff
Ensure that relevant schedule management procedures and reporting requirements are used
Consolidate all project progress, analysis, and forecast as portfolio report for management
Monitoring & update detail Engineering,Procurement progress,Construction and Commissioning progress
Report project progress to project manager for review
Build positive and effective working relations
(July 13 – Jan 14) Company : PT ODG Indonesia
Position : Project Planner
Job Family: Mechanical & Electrical Maintenance and Fire System
Service
Status : Contract Completion
Project :
-Lentera Nestle Indonesia Project – Karawang Timur
-Supply & Install Mechanical and Electrical at PT
Freeport McMoran Copper and Gold - #MP72 Bus Station
Tembagapura.
Perform and coordinating a wide variety of schedules,administrative site projects office functions; developing and/or maintaining records systems and/or in collecting information, preparing reports ; Handling highly sensitive, confidential issues
Perform master schedule (up to level 4) using WBS based,Resources loaded using Primavera P6
(July 11 – July 12) Company : PT Saipem Indonesia
Position : Software Developer Engineer
Job Family : Oil and gas
Status : Contract Completion
Infrastructure & Network (Hardware, Software equipment, Networking) including preventive Technician Support : Maintenance,Repair,Manage,tools,Device Installations in order to ensure IT infrastructures in all offices are working properly and effectively
System Supporting including software installation,Data application maintenance and Manage and trouble shooting (Active Directory) FTP Server, Domain Name Server (DNS)
Data Supporting on user management,filing and Data management System (Create GHRS And TMS user ID’s passwords and Helpdesk Dekstop) Using Programing Language order to ensure all systems and data are working within security standards
Develop and maintain continuous communication relationship with software and Hardware vendors,in order to Ensure reliable supports in case of IT problems and maintenance
IT Provide internal coaching, mentoring/technical and training to all related new users in Company regarding IT related matters, in order to ensure the transfer of IT knowledge to all staff Departement
(Oct 09 – March 11) Company : PT Pepperl-Fuchs Indonesia – Bintan Industrial Estate
Position : Demand & Production Planner
Job Family : Electrical Manufacturing
Status : Contract Completion
Process orders received from customers and schedule the jobs according to production capacity
Develop and recommend production activity, attachment, and inventory schedules and order fulfillment activities for the facility line.
Expedite clearance of backlog orders
Ensure all the special customers’ requirements are reflected in the orders loaded to production
load and pick jobs to production
Ensure for all that full-kit jobs are picked to production line
Liaise with customers for sufficient orders to sustain production capacity
Report to production manager for daily report,weekly and monthly
Attachment :