ANDERSON FU
adcsd6@r.postjobfree.com
Phone: 905-***-****
Cell: 647-***-****
Summary
Effective leader; capable to supervising 30-40 production staffs and conduct performance review
Ability to communicate with different department and management member with strong team works skills
CI/ Process/Quality/Manufacturing Engineer with many years’ experience in plastics and automotive and food industries
Familiar with different plastics materials and polymer. i.e. FDA, PET, TPE,PE,HDPE, PP, PVC, ABS & engineering plastics
Proven track record of process design/continuous improvement, time studies, quality improvement, troubleshooting, installation, cost reduction, 5S, six sigma, health & safety standard and lean manufacturing
Experienced in different manufacturing process, production area layout, equipment, automation packaging and conveying, procedures and tooling,
Experienced in develop business plan and action plan to reach the company goal
Experienced in root cause analysis, problem solving skills and strong decision making with different situations
Experienced in extrusion, thermoforming, injection, stamping and welding process
Experienced in handle multiple tasks and use time management to meet the time line and documentation
Experienced working in a unionized and non-unionized environment
Experienced in DOE, SPC,PPAP, APQP, PFMEA, ECR, ISO 9001, 14001, QS9000,and TS16949
Experienced in MS Office, MS Project Excel, Power Point, Word, Access,
Familiar Auto Cad
Working Experience
Process Manufacturing Technical/Engineer
Amhil, Mississauga, ON Apr 2016 to Present
Set up and trouble shooting
Provided technical support and problem solving
Process Continues improvement
Replace worn tool, set control vacuum, air pressure and temperature
Monitor the thermoforming, printing, packaging and conveying system
Synchronize speed and adjust control as necessary
Reduce set up time and scrap rate
Follow up the run-at- rate, on line quality check and troubleshooting quality issues
Used predetermined time studies to predict standard time needed
Located defects cups products and check for conformance to specifications
Keeps manufacturing 5S system.
Process Engineer
Global Plas, Vaughan, ON Jul 2014 to Apr 2016
Review and install Flocking Line for 760A program
Provided technical support for flocking and molding process
Oversee the continues improvement project
Implemented PFMEA, FMEA and PPAP for 760A and review current program
Review the process and mold set up
Handle molding and quality, issues
Reduce the injection waste with recycle program
Process and fine tuning adjustment and run molding machine
Quality Engineer
TG Minto, Palmerton Jul 2013 to Apr 2014 (Contract)
Launched 760A Toyota program
Handle injection molding quality issues, check Fixture and preparing PPAP and FMEA for new program
Work closely with process engineer to reduce the injection waste
Performed process audits to determine the effectiveness of the manufacturing process
Provides additional support with regards problem solving and improvement by preparing report/studies as required by customers, internal department and external suppliers
Ensure the effective resolution of problem/defects through a documented corrective action process
Ensure all shop floor SPC/SQC measuring equipment is calibrated to ISO/TS16949 requirements
Process & Product Development Engineer
EHC-Global, Oshawa Nov 2010 to Oct 2012
Optimized the manufacturing plastics extrusion process and equipment to improve productivity and quality
Provided daily technical support by troubleshooting and resolving problems.
Regular visit with outside customers/client to reach common goals and their satisfaction needs.
Developed a new recycling program that effectively reduced scrap by 15% as well as increasing line throughput by 5%.
Reviewed all process/equipment flow and design, update any equipment expenditures within the plant and assemble cell
Successfully launched the new NT 740 and inter bell project by contributing product design, tooling, equipment, quotation, installation/commissioning, prototype die and test run. pilot run i.e from start to finish
Interacted with production, engineering & development personnel to ensure products were process capable and efficient.
Implemented a new PM schedule and work closely with production and maintenance to ensure the equipments be services and without delays any other projects
Used MOST to improve process and quality control, and updated PFMEA, FMEA and PPAP.
Provided a cross over training between production operators and assembly line to achieve safety work with equipments, high quality standard and process procedures
Implemented lean manufacturing systems to continuously improve the quality and process flow
Provided update information include daily production issues to management other department team members
Set up, ran and monitored the extrusion machines, to ensure that the customer requirements were met.
Prepared the quality document and test report and file into the database system.
Manufacturing /Quality Engineer
Cooper Standard, Stratford Sep 2007 to Aug 2010
Successfully developed and launched the new GMX 521 interior trim program for preparation for the new production line
Oversee the extrusion process, thermoforming extrusion line and molding
Upgrade conveying line and developed the automation packaging system
Reviewed plant layout and relocation the production machine to optimize work area.
Prepared capital projects (proposals, budgets, quotes etc.) to purchase new equipment and equipment installation and ensure the machine safety ( machinery safeguard)
Provided a technical training for plant operators, leader and supervisor
Used predetermined time studies to predict standard time needed for new or current production schedules
Conducted Quality Control processes to measure products for conformance to quality requirements
Implemented a preventive maintenance (PM) system to ensure that machines are operating properly
Implemented 5S housekeeping to improve the production efficiency and work environment
Provided and review the process and material for thermoforming
Oversee the material/process flow for extrusion, thermoforming and welding process
Coordinated, prepared meeting and set up training workshop for different department
Provided the technical process plan and business strategic for management to review
Manufacturing/Quality Engineer
Noma Automotive, Toronto, ON Aug 2005 to May 2007
Developed bill of material (BOM) to identify all items required for the assembly, follow up and updating of the process flow and FMEA for the plant in Mexico.
Used time and motion studies to analyze, materials,standards cost per unit/hour, and wages to reduce excess costs
Provided and review the quality control and process system for new Mexico plant
Implemented a one piece flow system which reduced cycle time by 20%
Launched GMT 900 interior trim project program- developed/test die and mold, successfully led product into production on March 2006
Daily support and review molding issues
Set up all production schedule and assembly cell, review and work on painting line project and process flow
Continuous Improvement/ Process Engineer
Metzeler Automotive Profile System, Oakville, ON Dec 2003 to Apr 2005
Developed 2D Matrix bar code system that enabled full product tracking and quality analyses while enhancing production efficiency.
Implemented pro-active recycling programs that effectively reduced scrap by 10
Completed install the flocking laminates project and vision system on line to monitor process/identify and resolves process bottlenecks.
Provided the lean manufacturing techniques CI project together implanted the Poke-Yoke and Kaban system to reduce quality scrap and costing saving 50,000 per year
Oversaw cost reduction and process improvement projects as well as any major outsourcing transitions
R&D Project/Process Engineer
Co-Ex-Tec Ltd, (Division of Decoma International), Vaughan, ON Jan 2000 to Nov 2003
Developed a new foaming technology to reduce part weight/density by 15%
Utilized extensive background in plastics in order to assist the company in converting from rubber to plastic technology
Oversaw cost reduction and process improvement projects as well as any major outsourcing transition
Provided the technical support for thermoforming and extrusion process
Involved in all aspects of new program launch for Ford from design tooling, prototype design and product test
Responsible project management including plant start-up, plant trails, planning project within manufacturing/engineering, coordinating team, creating timelines, facilitating meeting
Provided technical trouble shooting support and problem solving together with technical training
Created an innovative recycling program that represented approximately $500,000 in net new sales.
Conducted a cost study project that effectively reduced manpower by 10% resulting in production cost saving
Implemented new process method to improve color matching on line.
Education
London School of Polymer Science and Technology, London England
B.Sc., Bachelors of Science 1981
Polytechnic Institute of South Bank, London England
National High Diploma Chemical Engineering 1984
The Hong Kong Management Association, Hong Kong
National Diploma in Management
Society of Plastics Engineer Member(SPE)
Society of Manufacturing Engineer Member (SME)
Hong Kong Management Association Member (HKMA)
Hong Kong Mold and Die Association Member
References available upon request