CURRICULUM VITAE
Megh Shyam Gupta
*** ***** *****, *.*.B. Enclave,
Shahadra, Delhi-110093.
Email: adcqay@r.postjobfree.com, adcqay@r.postjobfree.com Phone: +91-966*******, +91-965*******, +91-971******* Position : Project Manager K.V. Prateek Enterprises (Siemens - Riyadh Metro Project Saudi Arabia)
Total Experience : 24 years 09 Months
Abroad Experience : 07Years 07 Months
Current Location : Saudi Arabia (Riyadh)
Location Preference : Anywhere
Training : Siemens STG-600 Turbine Operation & Maintenance
: Siemens DCS Operation & Maintenance
: Areva T & D - GSUT 13.8/33KV transformer Installation, Testing
& maintenance.
: GEA Westfalia OSC60 Crude Oil Separator Installation, Testing Operation & Maintenance.
: Veolia Water Treatment Plant Operation & Maintenance
: Pedco LTD Battery & Charger Operation & Maintenance
: Wood Ward Japan Governors 505, 505E, DSLC & MSLC. Programming.
: SI-TEC Xtend Governor Co-Generation Controller & GSM Programming
: Alstom LTD T & D for on work site HSE.
IT Skills : Window 10 &7, XP, MS Word, MS Excel & Power Point.
: Auto CAD 2009
Professional Experience:
1. Name of Employer : M/s K.V. Prateek Enterprises Saudi Arabia Title of Position : Project Manager
Project : Siemens -Riyadh Metro Project Saudi Arabia Client : Siemens
Period : July 2018 – Until Now
Responsibilities :
• Supervise and co-ordinate with staff and Utility providers throughout the project to ensure consistency and continuous application of required standards and procedures.
• Coordinate with Planning Team to prepare "Master Time Schedule.
• Monitor the progress of the project with respect to approved MTS.
• Lead, motivate, communicate with, develop, appraise and manage staff to ensure staff is fully motivated to achieve best performance to meet the company’s targets.
• At all times comply with company policies, procedures and instructions 2. Name of Employer : Al- Arrab Construction Company, Saudi Arabia Title of Position : Site Manager
Project : 132/13.8 KV Sub Stations. Saudi Arabia (Riyadh) Client : NGSA
Period : Sep 2015 – June.2018
Responsibilities :
• Supervise and co-ordinate staff, Sub-Contractors, material suppliers and Utility providers throughout the project to ensure consistency and continuous application of required standards and procedures.
• Coordinate with Planning Engineer to prepare "Master Time Schedule” and monitor the progress of the project with respect to approved MTS.
• Provide professional advice and direction for the resolution of site problems related to design, material, construction, QA/QC, progress or any other matter arising at site.
• Scheduling work to be carried out to ensure project targets are achieved.
• Lead, motivate, communicate with, develop, appraise and manage staff to ensure staff is fully motivated to achieve best performance to meet the company’s Targets.
• At all times comply with company policies, procedures and instructions
• Identify potential crises and devise contingency plans. Professional Experience:
3. Name of Employer : Al- Arrab Construction Company Saudi Arabia Title of Position : Site Manager
Project : Duba Power Plant Extension Project 3X 15MW Gas Turbine. Client : Saudi Electricity Company (SEC).
Period : Aug. 2009 – July 2012
Responsibilities :
• Supervise and co-ordinate staff, Sub-Contractors, material suppliers and Utility providers throughout the project to ensure consistency and continuous application of required standards and procedures.
• Coordinate with Planning Engineer to prepare "Master Time Schedule” and monitor the progress of the project with respect to approved MTS.
• Provide professional advice and direction for the resolution of site problems related to design, material, construction, QA/QC, progress or any other matter arising at site.
• Scheduling work to be carried out to ensure project targets are achieved.
• Lead, motivate, communicate with, develop, appraise and manage staff to ensure staff is fully motivated to achieve best performance to meet the company’s targets.
• Determine and assess need for additional staff and make the appropriate recruitments during project cycle
• At all times comply with company policies, procedures and instructions
• Identify potential crises and devise contingency plans. 4. Name of Employer : Fichtner Consulting Engineers PVT Chennai. Title of Position : Construction Chief Engineer (Electrical) / Site Manager Project : 3 X 15 MW Duba Power Plant Extension Project for Saudi Electricity Company (SEC).
: 50MW Gas based power plant for Silk Road Sugar Ltd. Kakinada, Andhra Pradesh (India)
: 25 X 4 MW coal based captive Co-Generation power plant for CMEC Gujarat Cement Works at Amerli, Gujarat (India) Period : July 2006 to July. 2009
Responsibilities :
• Coordinate with design department for approval of all drawings.
• Site coordination, Supervision, Installation, Testing and commissioning.
• Reporting to the project manager for plant progress.
• Coordinate with Planning Engineer to prepare the plane for completing work as per schedule.
• Provide professional advice and direction to Contractors and Engineers for completing the work as per schedule.
• Inspection of QC during Installation of equipment’s. 5. Name of Employer : Gov. Control India PVT LTD, New Delhi Title of Position : Assistant Manager
Project : 3 X20 MW Steam Turbine Power Plant.
Client : Bajaj Hindustan Limited
Period : May 2005 to June 2006
Responsibilities :
• Site coordination, Supervision, Installation, Testing and commissioning.
• Inspection and testing of all equipment before dispatching to Customer.
• Testing of Turbine and other accessories in workshop.
• Programming of Governor as per customer requirement and turbine design
• Technical training arranged for employees programming of Governors. 6. Name of Employer: ALSTOM LTD
Title of Position : Team Leader
Project : Renovation & Modification of 29 Nos. of existing 33/11KV Sub-Stations.
Client : Power Grid Corporation of India Ltd. (PGCIL) Period : June 2004 to April 2005
Responsibilities:
• Supervision of Installation, Testing and commissioning activities of Sub-Stations
• Modification of 29nos. existing 33/11KV Sub-Stations, and augmentation of transformers capacity.
• Preparing schedule, execution plan, and billing break- up for process the payment.
• Coordinating with suppliers & sub-contractors for completing the work as per schedule.
• Preparing progress report for cash collection targets. 7. Name of Employer : M/s Kessels Engg. Works Ltd. Delhi Title of Position : Sr. Project Engineer
Project: 20MW TG Set of Dhampur Sugar Mills Limited (Uttar Pradesh).
: 50MW TG Set of Bajaj Hindustan Limited Budhana at Mujaffar Nagar (Uttar Pradesh)
: 10MW TG Set of Bajaj Hindustan Ltd. Bijnorin (Uttar Pradesh)
: 8MW TG Set of Kalyani Steels Limited (Karnataka).
: 15MW TG Set of High Tech Carbone Limited in Chennai (TN)
: 20MW TG Set of Terna SSK Limited (Maharashtra)
: 15MW TG Set of Rana Sugar at Amritsar (Punjab).
: 6 X 3 MW TG Set of Akaberpur Chini Mill Limited at Ambedkar Nagar (Uttar Pradesh)
: 10MW TG Set of DSM Sugar Ltd. at Asmoli (Utter Pradesh)
: 15MW TG Set of Extraction Control Kalyani Agro (AP) Period : May 1992 to May 2004
Responsibilities :
• Inspection of all materials before dispatching to customer.
• Testing of all equipment in workshop.
• Testing of Steam Turbine in workshop
• Supervision of Installation, Testing and commissioning of Power Plant equipment’s. Programming of Governor as per turbine rating and design. Personal Information
Professional Qualification: B. Tech in Electrical Engineering2015 Professional Qualification: Diploma in Electrical Engineering 1992 Date of Birth : 06 October 1968
Sex : Male
Marital Status : Married
Nationality : Indian
Address : 110 Janta Flats, G.T.B. Enclave, Shahadra Delhi-110093 Phone Number : 91-966******* Mob. 91-965*******, 91-971******* 966-*********
Email : adcqay@r.postjobfree.com, adcqay@r.postjobfree.com Passport Number : J 8632752
Megh Shyam Gupta