Post Job Free
Sign in

Power Plant Electrical

Location:
Durg, Chhattisgarh, India
Posted:
April 05, 2020

Contact this candidate

Resume:

Dear Sir,

I have to request that, I want to work in your organization.

I have a Diploma in Electrical Engineering in the year 2004.

After that, I started the Job. I have working experience of more than 14 years in the fields of Electrical Commissioning, Projects, Operation and Maintenance in Different Industries.

I started my job as an Electrical Commissioning Eng. worked in Gas power plant, The thermal power plant

, Cement Plant and Edible Oil Industry.

Last Project I worked as an Electrical Commissioning Supervisor in Hyundai Engineering & Cons. Company

Ltd Abu Dhabi (UAE) for 1600MW, Combined Cycle Gas turbine Project.

I am having a Passport also submitting my resume with this letter.

With Regards,

Mohammed Imteyaz

+91-910*******)

RESUME

Contact Address M. IMTEYAZ

Ward no-41, H. No-253 Mobile: +91-910*******

Kelabadi, Durg,CG +91-917*******

INDIA

Email: adcney@r.postjobfree.com

Email: adcney@r.postjobfree.com

Passport no- M 8607306

Professional summary:

14 years of work experience as Electrical Engineer.

Education Details:

Diploma in Electrical Eng.

Engineering From Govt. polytechnic College Durg. Chhattisgarh (INDIA) University of Rajiv Gandhi Proudyogiki Vishwavidyalaya Bhopal

2004

L & T switchgear training Programme at Pune: Selection of switchgear & Automation (SSA)

21 -25 th April 2014

Worked Experience in Gulf:

•Worked in Yemen (National Cement Plant) As Electrical Commissioning Eng., Behalf of Siemens through M/S Spectrum Electrical Eng. Since March 2008 to Sep.2008.

•Worked in Kuwait (Ministry of Electricity & water Power plant) As Electrical Supervisor (Commissioning) through M/S Sejong Corp. and with Hyundai Eng. & Construction Company Ltd. Since Feb. 2009 to Oct. 2010.

•Work Experience in India 9 years and Gulf Experience is 5 years.

Working Experience:

Organization

GAMA Power Systems Engineering & Contracting Inc.

Designation

Electrical Commissioning Supervisor

Duration

Aug 2018 to Dec.2019

Project Involved-

Aluminium Bahrain (ALBA) Line 6 Power Station 5 Expansion Project - BAHRAIN

•Plant Capacity 1800 MW Combine cycle Power Plant.

Responsibility:-

1.Pre Commissioning of LV switchgear, Power & Distribution Transformer, Motor Aux. systems like Air-cooled condition (ACC), Fin Fan Cooler (FFC) and GC RMS.

2.Testing of MM300 Motor Relay manufactured by GE.

3.Checking the Ethernet communication with ECS for SWGR & MCC.

4.Pre Commissioning of HVAC Fire detection system.

5.Pre Commissioning of Heat Tracing Thermistor at Gas Pipe line.

Organization

Hyundai Engineering & Const. Company Ltd. Abu Dhabi(UAE)

Designation

Electrical Commissioning Supervisor

Duration

July 2016 to April 2018

Project Involved-

MIRFA Independent Water & Power Project (IWPP) at Abu Dhabi (UAE)

# Plant Capacity 1600MW, Generating capacity comprising CCPP 1259.17MW, Where CCGT (3 257MW), STG (2 284MW) and OCGT 360 MW (4 90MW)

#GT -3 units supplied by GE Frame 9FA engines & HRSG 3 units & STG 2 units supplied by HHI.

Responsibility:-

1.Pre commissioning of LV switchgear, Power & Distribution Transformer, Generator aux. System & Circuit Breakers, IPBD,SFC & Excitation Panel supplied by AEN, ABB & Siemens.

2.Functional and simulation test between equipment to DCS system.

3.Testing and Commissioned of 11KV Motors at HRSG section.

4.Project Co-ordination between vendor, Owners Engineers & construction team.

5.Scheduling of electrical Commissioning work supervision of testing & Commissioning activities.

Organization

Panchsheel Solvent Pvt. Ltd. Rajnandgaon(India)

Designation

Electrical In charge

Duration

Nov. 2010 to June 2016

# Handle the 100TPD Refinery (Rice bran Oil) Plant, Supplied by Desmet Ballestra Pvt ltd.

# Handle the 500 TPD Solvent (Rice bran Oil) Plant, Preparatory, DORB & ETP units.

# Handle the 12 Tonne Thermax Boiler Plant.

# commissioned of Thermax Bag filter for Boiler unit.

# Handled the O & M activities of all over the plant.

# Handled the LV SWGR, Motors, Siemens AC Drives and DG Set, Transformer maintenance and Preventions.

Organization

M/S Sejong Corporation (Kuwait)

Designation

Electrical Supervisor (Commissioning )

Duration

Feb. 2009 to Oct. 2010

Project Involved:

Ministry of Electricity & water Power plant (MEW),Kuwait Location: Shuaiba North Co-Generation Power & water distillation Plant.

# Plant capacity: 828 MW CCPP, 45 MIGD Distillation plant, GT 3 units (GE 9 FA), HRSG 3 units, ST-1 unit (Toshiba).

Responsibility: 1.Supervised and oversee the all over commissioning activity.

2.Correspond with the client representative for work permits needed in the site.

3.Reviewed engineering plans, specifications, and circuit diagrams.

4.maintained effectively and report about discussed modifications of site issues, Investigate problems and recommended solutions.

5.Testing & simulation of electrical equipment and auxiliaries for the steam turbine With Toshiba engineers.

6.Lead the teams for line & loop checking of laid cables including Meggaring and High pot testing of MV cables.

7.Work under the deadline and pressure hand to hand.

8.Testing and commissioned of six nos. Of 11KV Motors.

9.Commissioned of 20 no’s of 2.0 and 2.5 MVA transformer.

10.Steam turbine Generator protection panels testing & commissioning Co-ordination with Toshiba vendor. 11. Handled the all over plant (MV & LV SWGR with All Transformer) trouble shooting and maintenance activity Behalf of Hyundai Eng. & Const. company since Jan 2010 to Oct 2010.

Organization

M/s Spectrum Electrical Eng. Mumbai (India)

Designation

Testing & commissioning Engineer

Duration

Jan. 08 to Feb. 09

Project Involved:

M/S NATIONAL CEMENT COMPANY, YEMEN

Job Designation: Testing & commissioning Engineer (Behalf of Siemens) Duration : March 2008 to sep. 08

Responsibility : 1. Testing and commissioned of low voltage Bkrs of Siemens with MCC sets.

2.Testing and commissioned of low voltage motors in different locations like raw mill, Coal mill.

3.Commissioned the battery chargers in different locations.

4.Testing co-ordination of Siemens make socomec relay.

5.Handling the pre-commissioning activity independently in Coal mill and Additive crusher mill.

6.Handling the pre-commissioning activity of Cement mill section.

7.After commissioned plant, Handling the plant maintenance and trouble- shooting activity With NCC Eng. Until successfully run.

8.After commissioned the Cement plant, participated in PG test for 72 hours.

M/s GENERAL MOTOR INDIA LIMITED, Talegaon, Pune

M/s JAYKAY CEM LTD, Lokapur, Mudhol.

M/s ALOK INDUSTRIES, Silvassa

M/s SUZLON LTD, Naliya, Bhuj.

M/s GALLANTT ISPAT LTD, Gorakhpur

Organization

M/s Om Electrical Eng. Mumbai (India)

Designation

Testing & commissioning Engineer

Duration

Nov. 2005 to Dec. 07

Responsibility- Testing & Commissioning of PCC, MCC, Motors & Transformers.

Project Involved:

M/S NATIONAL THERMAL POWER CORPORATION, Bilaspur

M/s RELIANCE INDUSTRIAL LTD, Jamnagar

M/s BHARAT PETROLEUM CORPORATION LTD, Manmad (M.H.)

BHARAT PETRLEUM CORPORATION LTD(BPCL), Shirpur (M.H.)

M/S NATIONAL ALUMINIUM COMPANY (NALCO), Angul (Orissa)

ROHIT FERRO TECH LTD, FURNACE PLANT, Jajpur (Orissa)

M/S HYDRO POWER PROJECT, Shahpur (Mumbai)

I hereby declare that the above-furnished information is true to the best of my knowledge.

(M.IMTEYAZ)



Contact this candidate