Post Job Free

Resume

Sign in

Power plant chp operation engineer

Location:
Bilaspur, Chhattisgarh, India
Salary:
30000
Posted:
April 06, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

GULAB SINGH GOND

ADDRESS FOR COMMUNICATION:

VILL-BICHPURA POST KANOUR

THE.BARHI DISTIC KATNI M.P 483770

Email:adcn0e@r.postjobfree.com

(Mobile: 789-***-****

Career Objective

To work on technically challenging assignments, in which I can get an opportunity to foster my capabilities.

To become a successful professional in the field of Power Sector and to work in an innovative and competitive environment

Synopsis

A competent professional with5 .5 yearof experience in the areas of Thermal Power PlantsMainly in Coal operation .Dedicated to quality work with good communication and presentation skills, along with adaptability and a deep sense of commitment.Highly creative & innovative when exposed to new concepts. Have good leadership qualities, is a cooperative team player and has an ability to perform under pressure

Work Experience:

1. Company :. Chennai Radha Engineering Pvt.Ltd.

Designation. : Shift in charge(junioer Engineer)

Period :. 01 jan 2016 to till date.

Location. :. BINA OMAN REFINERY LTD.,Bina, M.P.

Job profile:

Working in 3 150 TPH Coal,Petcoke and Limestone Handling Plant.

Handling the Operations of CHP starting from coaland Limestone unloading in Hopper to conveying

in bunkers and Petcoke from DCU to conveying in bunkers.

Handling the operations of CHP equipment viz. Belt conveyors (both LT and HT motor driven),

Scoop Coupling,, Stacker cum Reclaimers etc. along with protection systems like Zero Speed, Belt

Sway and Pull Cord Switches.

Monitoring and the effect/performance of the plant.

Handling the Operation of Lime Stone Mill and conveying from vessel to lime Stone bunkers through

compressor(both HT and LT).

Responsible for managing Operation and maintenance related to the coal and lime Stone procurement

activates.

Handling of operation ash handling and conveying from vessel to bed material bunker.

2.Company:Feedback Power ONM Services Pvt.Ltd.

Designation: Engineer (Operation)

Period: 12 May 2015 to 25 Dec.2015

Location: lalitpur power generation compny ltd u p

Job Profile:

Working in 2 1800 TPH Coal Handling Plant.

Handling the Operation of CHP starting from coal unloading in Track hopper to conveying in bunkers.

Looking after the coal yard management and the heavy earth machines associated with it.

Handling the Operation of CHP equipment viz. Belt conveyor(both LT and HT motor driven),fluid

coupling, Stacker cum Reclaimers etc.along with Protection systems like zero speed, Belt sway and

Pull cord switches

Responsible for managing operation and maintenance related to the coal procurement activates.

Close monitoring and blending process of different grade coal

Monitoring and the effect/performance of the plant.

Preparing SOPs and indents for procurement.

Monitoring the effect/performance of the plant.

Organizing the various training sessions for the team to enhance their performance.

Coordinating the Sampling analysis process.

Prepare daily,monthly and annually progress report.

Monitoring the diesel consumption of all HEME equipment's.

3. company :. G.R.L. under Reliance Power LTD.

Designation:. Field Engineer

Period :. 1 jan 2013 to 30 April 2015

Location :. SASAN ULTRA MEGA POWER PLANT LTD.(6 660MW) in Singrouli,M.P.

JobProfile:

Working in 6 1950 TPH Coal Handling Plant.

Knowledge of working in Allen Bradley PLC ABLOGIX 5000 along with its hardwire interfacing with various drives and instruments.

Handling the Operation and Maintenance of CHP starting from silo to coal conveying in bunkers

Looking after the coal yard management and the heavy earth machine associated with it.

Handling the Operation of CHP equipment viz.Belt Conveyor(Both LT and HAT motor driven),fluid coupling, Stacker cum Reclaimers etc.along with Protection systems like zero speed, Belt swayand Pull cord switches.

Responsible for managing Operation and Maintenance related to the coal procurement activities.

Close Monitoring and blending process of different grade of coal.

Monitoring and the effect/performance of the plant.

Maintain the log book and physically stock of the coal at all time.

Preparing SOPs and indent for procurement.

4.Company: Anand mines engineering works pvt ltd.

Designation: Field Engineer

Period:. 1 Jan 2012 to15 Dec 2012

Location: Hindustan Zink ltd.Aguch mines,Bhilwara,Rajsthan.

JobProfile:

•Workingin 2000 TPHZink mines

•.

HandlingtheOperationandMaintenanceofrmhpstartingfromsilotocoalconveyinginbunkers

LookingaftertheZink yardmanagementandtheheavyearthmachineassociatedwithit.

HandlingtheOperationofrmhp equipmentviz.BeltConveyor(BothLTandHATmotordriven),fluidcoupling,StackercumReclaimersetc.alongwithProtectionsystemslikezerospeed,BeltswayandPullcordswitches.

ResponsibleformanagingOperationandMaintenancerelatedtothecoalprocurementactivities.

CloseMonitoringandblendingprocessofdifferentgradeofston

Monitoringandtheeffect/performanceoftheplant.

Maintainthelogbookandphysicallystockofthestoneatalltime.

PreparingSOPsandindentforprocurement.

Academic Qualification:

Passed diplomaMECH. R.G.P.V. BHOPALwith 68.28

Passed XIIth fromM.P. BOARD72 %with marks.

Passed Xth from M.P.BOARD, 57.00%with marks.

Personal profile

●Father’s Name :MR.KANCHHEDI LAL

●Date of Birth :05-04-1986

●Gender :MALE

●Marital Status :MAIREd

●Nationality :INDIAN

●Postal Address :VILL BICHPURA THE BARHI KATNI MP 483770

Declaration:

I hereby declare that the information furnished above is true and complete to the best of my knowledge and Ibear the responsibility for the correctness of the above-mentioned particulars

(Gulab Singh gond )



Contact this candidate