Post Job Free

Resume

Sign in

Manager Engineer

Location:
Laredo, TX
Posted:
April 03, 2020

Contact this candidate

Resume:

P a g e * of *

Jose A. Gonzalez

**** ******* **. ****** ** 78045 956-***-**** -mail adcmac@r.postjobfree.com EDUCATION

Master of Science, Engineering Administration

St. Mary’s University at San Antonio.

Bachelor of Science, Production & Industrial Engineering. Instituto Tecnologico de N. Laredo, Mex.

INDUSTRY EXPERIENCE

Distribution Center / Warehouse Manager, Johnson Controls / Lux Products Corp. Dec. 1999 -November 2019

• Managed Supply Chain Process and MRP system information accuracy on a daily basis. Maintained KPI’s records. Made necessary daily adjustments based on KPI’s to keep productivity and efficiency at its highest level. Reviewed and developed packaging and shipping instructions for Retail, EDI, MRO and e-commerce customers.

• Issued purchasing orders in MRP system based in sales forecast and Inventory levels. Responsible for Inventory Management over $3.5 M.

• Maintained equipment maintenance schedule (Preventive maintenance). Maintained monthly Safety records and coordinated corrective actions. Conducted bi-monthly safety meetings and maintained MSDS documentation.

• Developed and Implemented Customers Returns procedures as well as maintained records of such reports in a monthly basis.

• Responsible for Purchasing and account payable daily approvals.

• Negotiated agreements with LTL and Parcel carriers achieving an average of 20% cost reduction ensuring the continuation and enhancements of service.

• Approved drawings specs and developed work instructions for packaging and production processes as well as inspection and testing procedures as needed for new products.

• Hired and maintained necessary work force levels according to demand fluctuations, including employee training and bi-weekly payroll approval.

• Attained a 25% improvement in order picking by improving packaging processes and warehouse layout. Optimized picking, shipping and storage areas as well as packaging process flow. Coordinated shipping, receiving and logistics for inbound and outbound orders.

• Conducted quarterly presentations to inform status of KPI’s and project’s progress. Plant Manager / Lux Operating Co. Sep. 1998 – Nov. 1999

• Oversaw all aspects of a Maquiladora Program operation. Coordinated shipping and receiving between two plants which included US and Mexican customs rules and regulations compliance, Inventory control, quality and production scheduling.

• Was responsible for decisions related to scheduling, delivery, logistics, quality control and employee staffing levels.

• Negotiated Union Agreements and payroll levels for all labor.

• Evaluated employee’s performance and recommended salary adjustments. Jose A. Gonzalez Page 2 of 3

Operations and Quality Control Manager / Lux Products Corp. Jan. 1994 – Aug. 1998

• Coordinated production schedule, materials flow and procedures for different production lines.

• Recorded and maintained a Quality Control program, coordinated corrective actions. Put into practice a Waste Reduction Plan achieving an 8% scrap reduction.

Production Manager / Lux Products corp. May 1991 – Dec. 1993

• Developed the layout of production lines and equipment to optimize process flow. Implement manufacturing method and continues improvement for assembly lines. Achieved dramatic increase in production outcome and product quality. Improved and designed mechanical fixtures and equipment to increase efficiency and process flow.

• Created work instructions and coordinated production schedules for three different production lines and packaging department.

Quality Control Manager / Robertshaw Controls Co. Aug. 1989 – Apr. 1991

• Maintained quality levels within tolerances and assessed employee’s performance under quality levels. Reviewed process flows.

• I was responsible for inspection of incoming parts and vendor evaluations which included filing records and implement corrective actions for key components of different product lines.

• Traveled to customer’s sites and coordinated Engineering changes to improve quality and follow up on corrective actions.

Production Supervisor / Robertshaw Controls Co. Sep. 1988 – July, 1989

• Supervised production personnel and maintain production flow within quantity and quality standard levels.

• Implemented and improved work processes and documented Engineering changes.

• Served as liaison Engineer in the startup of a timer production line. Assessed employee’s performance and implement training programs to increase productivity. Planner - Process Engineer / General Dynamics Jan. 1988– Aug. 1988

• Wrote assembly procedures for “Atlas/Titan” Space Program based on military standards and per drawings specs.

• Interpreted and developed processes. Coordinated instructions with project managers and quality control department.

Planner - Process Engineer / Tracor Aerospace. Feb. 1986 – Dec. 1987

• Initiated written procedures for Mechanical assembly per drawing specifications. Meet military standards and inspection points during the process.

• Developed procedures for wire harnesses and connector assembly of a military project. Production and Warehouse Supervisor / Bulldog-Jordan Co. Jan. 1984 – Jan.1986

• Developed the Start-up of a production line and documented assembly procedures and standard times by operation.

• Trained production personnel in manual and equipment operations.

• Maintained production records and follow up production schedule.

• Kept inventory records and coordinate production work orders. Jose A. Gonzalez Page 3 of 3

SKILLS

Proficient in: Computer software such as; Excel, Word, Power Point, BarTender (label software). Experience in: WordShip, Ship Manager, and Endicia (Shipping software) Implementing Continues Improvement Manufacturing methods. Languages: Spanish (Fluent in reading and speaking)



Contact this candidate