Antonio B. Gerez
***-** **. **** *** Kalubihan, Talamban Cebu City, Cebu Philippines
Prince Naif Street, Olaya Riyadh Kingdom of Saudi Arabia
Cell # 054******* WhatsApp 054*******
E-mail Address: adckpi@r.postjobfree.com
PERSONAL PARTICULARS:
Age : 47 years old
Date of Birth : November 11, 1972
Nationality : Filipino
Marital Status : Married
Religion : The Church of Jesus Christ of Latter-Day Saints (Mormon)
EDUCATIONAL BACKGROUND:
GraduateSchool
School : University of Southern Philippines Foundation
Major : Masters of Science in Environmental Management
Address : Salinas Drive Lahug Cebu City Philippines
Year Graduated : With Units Only (Under Graduate)
School : Technical Education Skills and Development Authority (TESDA)
Address : Arch Bishop Reyes Street, Cebu City, Philippines
Major : Industrial Motor Control
Year Graduated : February 26, 2005
School : University of San Jose- Recoletos
Major : Bachelor of Science in Civil Engineering
Address : Magallanes Street, Cebu City Philippines
Year Graduated : March 26, 1994
Secondary School:
School : Abellana National School
Address : Jones Avenue Cebu City, Cebu Philippines
Year Graduated : March 1989
Primary School:
School : Banilad Elementary School
Address : Governor Cuenco Sts. Cebu City, Cebu Philippines
Year Graduated : March 1985
EMPLOYMENT HISTORY
Company Name : ALISHAR PROPERTIES
Position : Site Engineer
Specialization : Engineering/Civil-Construction
Date Joined : January 5, 2019 – Present
Project : Abha Housing Project (PRECAST)
Responsibility :
Checking all delivered Precast Panels, Precast Beams, Precast Stairs, Precast Parapet and Precast Scooper.
Checking of rebar work of foundation.
Checking the lay outing of Panel installation and it corresponding dowels.
Checking the panels if it follows the tolerance/allowable of verticality and horizontality.
Checking the plumbness of Panels on each corner.
Checking the installation of steel bar between panels before grouting.
Checking the Hollow Core Slab and its opening for electrical and plumbing services.
Monitoring all workers that they will meet the schedule.
Monitoring the availability of materials on site so that there will be no delays/slippages on schedule.
Making Daily Construction Report to be submitted to the owner, Consultant and Project Manager
Company Name : Freyssinet KSA
Position : Quality Control/Quality Assurance
Specialization : Engineering/Civil-Construction
Date Joined : December 2008- June 2013
Responsibilities: (Headquarters Business Park) 56 Storey Building ( 900,000,000 SR)
Check the concrete delivered on site, slump and its corresponding temperature.
Check the verticality of the kelly’s rig and the deep of excavation
Quality Control Reporting.
Inspection of piles during the progress of concrete pouring.
Make Daily Report and Weekly Report to the Project manager.
Make Inspection Report to be submitted to the consultant.
Monitor of the Pile Head Breaking and Trimming if it reaches to the allowed elevation.
Monitor the Plate load test.
Monitor the piles with Integrity Test and Cross Hole Sonic Test.
Monitor the O-cell Test.
Monitor the Coring Test conducted by independent Laboratory (URS).
Checking the Rebar works of piles before concreting.
Monitoring the Dynamic Load Test.
Checking and monitoring of rebar works, electrical piping laying installation before concrete pouring will occur if all are intact and accepted by the consultant.
Monitoring and checking of Architectural Finishes such as Marble installation, Painting Works, Door and Door Jamb’s finishes, Railings installation and painting, Installation of Acoustic tiles and its accessories such as T-runners etc., Checking the progress activities of subcontractors at all mechanical works at chiller area, HVAC, plumbing works at fire sprinkler at Ceiling, monitoring of all plastering works at all Concrete Hollow Blocks.
(Haramain High Speed Rail Phase 1 Package 1 – Jeddah)
(June 08, 2013 – October 2013) (500,000,000.00 Saudi Riyal)
Familiarization of all Approved Drawings on Site that conforms with ISO Standards.
Quality Control/Quality Assurance
Documentations and Letter.
Monitoring all request for Inspection.
Checking all updated Approved Drawing on Site.
Checking all the queries to the Consultants (DAR al-Handasah)
Making daily Construction Report to be submitted to the Project manager, Planning Engineer, Structural Engineer and Site Manager.
Monitoring the Piling Works.
Monitoring and witnessing the on-going installation of Segmental Girders (Sand Blasting, Threading, Application of Epoxy and Squeezing of Girders and its installation.
Monitoring and inspection of Backfilling and Compaction and FDT.
Monitoring and inspection of Waterproofing.
Monitoring of all accomplished work at the Project Site.
Ministry of Housing – Infrastructure Project (Jeddah Saudi Arabia)
Site QA/QC Engineer
November 2013 – July 2016 (338, 000, 000.00 SR)
Make Daily Reports to the Consultants and Project Manager, Construction Manager
Monitoring the Every Layer of Compacted Materials if it passed or not and the soil sample they laid.
Checking the Clearing and Grading of the Area.
Checking the Soil Compaction using Nuclear Test Methodology
Making Inspection Request.
Monitoring all activities of the Subcontractor
Witnessing the FDT Test with the Consultants (PARSONS) and Third Party (RGF).
Checking and monitoring of the Laboratory at the Site.
Checking of all the Filling materials used before dumping /used at site.
Coordinate with the consultant.
Monitoring the FDT Schedules and monitor if it pass or not.
Monitor sand making of Daily Quality Report to be submitted to the QA/QC Manager and to the Consultant’s QA/QC.
Monitoring the Soil Laboratory.
Replying the Site Instruction.
Closing all Non Conformance Report (NCR)
Metro Railway – Metro Depot (Riyadh Saudi Arabia)
QA/QC Engineer
July 28, 2016 – October 18, 2016
Monitoring and Checking of all installed Formworks, Rebars
Checking the Rock Identification
Monitoring the newly poured Concrete at CIVIL ROADWAY.
Checking the Duct Banks to be poured with concrete on that day.
Checking FDT at CIVIL ROADWAY.
AL-DOHO PROJECT – Restoration of OLD HERITAGE BUILDING
QA/QC Engineer
October 19, 2016 – November 15, 2018
Checking all existing floor, walls, ceilings, finishes and etc to be restore.
Checking actual dimensions and location of stairs, hallways, rooms, courtyards and etc.
Checking the area that needs immediate shoring and propping.
Checking actual installation of new materials at heritage building.
Making some drawings to submit to the CADD Team to be an existing plan.
Quantifying the actual area cubic meters to be remove on site and actual dimension of all the buildings.
Taking photos daily for daily reports.
Assessing AUTOCADD to verify the site for concerns.
Designed of CEB (Compressed Earth Blocks) for approval to the consultant
Monitoring the Width, Length and Thickness of CEB.
Monitoring the whole work force (Production Area)at site.
Making new design as per manager’s request and consultant’s approval.
Checking of soil delivered on site.
Daily testing of CEB if it reached to its desired strength before delivering it to the site.
Company Name : THE CHURCH OF JESUS CHRIST OF LATTER- DAY SAINTS
(Construction Dept./Project Management Division)
Position : Project Employee/Project Inspector
Specialization : Engineering/Civil-Construction
Date Joined : July 2000
Date End : November 2008
RESPONSIBILITIES
Have monthly meeting with the Project Manager and other higher executives who will visit the project.
Discuss the problem occurred if there is any and other upcoming problems and find solutions to the needs of the projects as well as the need of the contractor.
Have a meeting with the consultants and discuss the progress of the works and its percentage. Have a weekly contact with the consultant to meet the quality and standard plans and specifications.
Inspect all the materials installed if it meets the specifications. Work well with the contractor if they follow the agreement before the project has started.
Inspect all the works from excavation of Foundation, Concrete/Structural, plumbing, Mechanical, Electrical, Architectural, Site Development, Landscaping, Specialties, Roofing, Painting.
Monitor daily the Execution of Personal Protective Equipments if contractor did follow.
Make a monthly report to the project manager such as the Milestone of each phase of the work, Percentage Accomplishment to date, Status of the Activity, Masonry, Architectural, Carpentry, Site Development, Status of Materials Delivered, Minutes of the Meetings, MEMO/Letter to the leaders and contractor, MONTHLY PROGRESS REPORT, PROJECT TRACKING FORM, PROJECT COST CONTROL, AC-21. These documents will be mailed to the Project Manager for his report to the committee.
PROJECT HANDLED
Guizo, MandaueCity, Cebu Meetinghouse
Humay-Humay, Lapu-lapuCity, Cebu Meetinghouse
Tanauan, Leyte Meetinghouse
Lahug, Cebu Meetinghouse
Lilo-an, Cebu Meetinghouse
Sudlon, MandaueCity, Cebu Meetinghouse
Carcar, Cebu Meetinghouse
Tagbilaran, Bohol Meetinghouse
Consolacion, Cebu Chapel (ACU Project)
Labogon, Mandaue Cebu Chapel (ACU Project)
Aloguinsan, Cebu Meetinghouse
Company Name : The Church of Jesus Christ of Latter-Day Saints
(Operation and Maintenance Division)
Position : Project Inspector
Specialization : Engineering/Civil-Construction
Date Joined : July 1997
Date End : July 2000
RESPONSIBILITIES :
Visit and inspect the project to be bid.
Make a detailed specification.
Invite contractors to attend the Pre-Bid.
Estimates the project.
Make a detailed Bid Recap.
Inspect the project while on-going from painting, varnishing, plumbing, civil works, electrical and mechanical if follows the specifications.
Monitor the weekly Value of Work base on their Bid Estimates.
Report to the Operation and Maintenance Manager weekly and discuss the progress of the work.
Project Handled:
Calbayog Chapel, Western Samar, Philippines
Tanauan Chapel, Leyte, Philippines
Baybay Chapel, Southern Leyte, Philippines
Maasin Chapel, Southern Leyte, Philippines
Catbalogan Chapel, Western Samar, Philippines
Tacloban Mission Home, Tacloban Leyte Philippines
Tacloban Mission Office, Tacloban Leyte Philippines
Tolosa Chapel, Leyte Philippines
Canmogsay Chapel, Leyte Philippines
Calape Chapel, Bohol, Philippines
Lo-on Chapel, Bohol Philippines
Pardo Chapel, CebuPhilippnes
Fatima Chapel, Tacloban Leyte, Philippines
Company Name : White Leopard Builders (Sideline Project)
Position : Project Engineer/Estimator
Specialization : Engineering/Civil-Construction
Date Joined : January 2005
RESPONSIBILITIES:
Visit the project to be bid and attend the pre-bid conference. Checked all the prices of the materials and estimate the said project.
Supervise the project until it will be turn over to the owner.
Have a weekly meeting with the workers and monthly meeting with the owner of the construction to find solutions to speed up the works and find probable upcoming problems and find solutions to it.
PROJECT HANDLED
1.Lahug, Cebu Meetinghouse
2.Lapu-lapu, Cebu Meetinghouse
3.Lilo-an, Cebu Meetinghouse
4.Pardo, Cebu Meetinghouse
5.Lasang, Davao Meetinghouse
6.Mangagoy, Surigao Meetinghouse
7.Babac, Davao Meetinghouse
8.Carmen, Davao Meetinghouse
9.Nabunturan, Davao Meetinghouse
10.Calbayog Samar Meetinghouse
11.Pinamungajan, Cebu Meetinghouse
12.Allen, Samar Meetinghouse
13.Tolosa, Leyte Meetinghouse
14.Burauen, Leyte Meetinghouse
15.Tacloban, Leyte Meetinghouse
16.TAPA KING Restaurant, Mabolo Cebu City
17.TAPA KING Restaurant, SM City Cebu
Company Name : MIJO CONSTRUCTION (Sideline Project)
Position/Title : Quality Assurance/Estimator
Specialization : Engineering/Civil-Construction
Date Joined : January 2003
Date Left : November 2004
RESPONSIBILITIES
Visit and attend pre-bid conference and estimates the project to be bid.
Attend all the problem occurred during the on going project. Inspect all the quality of the building. Making sure that the materials installed will meet the standard specifications of the project.
Meeting with the owner side inspector if there were lapses/lacked in the plans.
PROJECT HANDLED
Alang-Alang, Leyte Meetinghouse
San Miguel, Leyte Meetinghouse
Dagami, Leyte Meetinghouse
Almeria, Biliran Meetinghouse
Tacloban, Leyte Meetinghouse
Pardo, Cebu Meetinghouse
Calbayog, Samar Meetinghouse
San Isidro, Leyte Meetinghouse
Calubi-an, Leyte Meetinghouse
Lutopan, Cebu Meetinghouse
Company Name : GEOTEST RESOURCES
Position/Title : Lead man in Soil Exploration
Specialization : Geology/Geophysics
Date Joined : September 1992
Date Left : March 1993
RESPONSIBILITIES
We do some soil exploration using split spoon and checked the condition of the soil as well as the kinds of soil.
Checked all the moisture content as well as the plasticity limit of the soil.
Monitor the number of boreholes and its depth and report to the Soil Engineer.
OTHER PROJECTS
Two-Storey Residential house located at PACIFIC GRAND VILLAS Suba Bas-bas, Marigondon, Lapu-lapu City, Cebu owned by Mr. & Mrs. Jerome Caballes.
Two-Storey Beach Side Residential House located at Luyang, Carmen, Cebu owned by Mrs. Josefina Mag-usara Hatakanaka.
Tapa King Restaurant located at Mabolo Cebu City and SM City Cebu owned by Mr. and Mrs. Matthews.
Sheridan Bldg. at North Reclamation Project Mandaue City, Cebu Philippines owned by Mr. Joseph Tan. Inspection (Punch listing) of entire Three Storey Building prior to turn over to the owner.
REFERENCES
Name : Jongyoung Song
Cell# : (966-**-***-****
WhatsApp : +821*-****-****
Company : Freyssinet Saudi Arabia
Relationship : Branch Technical Director
Name : Edgardo E. Fernando
Telephone Number : +639*********
Company : The Church of Jesus Christ of Latter-Day Saints
E-mail Address : adckpi@r.postjobfree.com
Relationship : My previous Area Facility Manager
Name : Karl Russel Matas
Telephone : +966-**-***-****
Company : Freyssinet Saudi Arabia
Relationship : Old Friend