Experience = 26 years

OBJECTIVE:-

To secure a challenging position in an esteemed organization, where my capabilities can be

utilized for the growth of the organization and scope obtained Agitacareer growth.

To use the knowledge, experience and skills acquired, to learn and adopt new and emerging technologies.

CAREER PROFILE:-

1.Responsibilities have been included OPERATION AND MAINTENANCE of plant through monitoring parameter and ensure smooth running of all equipment’s and trouble shooting.

2.Strong interpersonal, team working and leadership skills, an effective communicator with excellent relationship, management skills and strong analytical solving problems

3.Material Management in SAP like, Inventory modeling. Purchase Requisitions, Preventive Maint, Breakdown Maint, Line Break, and Hot Work permit etc.

4.Commissioning done of Thermal Power Plant.

WORK EXPERIENCE:-

1.Reliance Industries Ltd as a DGM – Power Plant Operation & Maintenance of 64MW x 2 no’s thermal Power Plant & 110MW x 1 no Gas Power Plant from Feb-2015 to continuous.

2.Adhunik Metaliks Limited as a Manager- Power Plant –Operation & Maintenance of 17MW x 2 no’s thermal power plant from May-2014 to Feb 2015.

3.Operation Energy Group as a GM-Power Plant Operation & Maintenance of 27MW x 2 nos thermal power plant from Oct-2013 to May-2014

4.Adhunik Metaliks Limited as a Manager- Power Plant –Operation & Maintenance of 17MW x 2 nos thermal power plant from Oct-2011 to Oct -2013

5.Bhushan Energy Limited as a Sr.Manager- Power Plant –Operation & Maintenance of 150MW x 2 nos thermal power plant from July-2011 to Oct 2011

6.Adhunik Metaliks Limited as a Manager- Power Plant –Operation & Maintenance of 17MW x 2 nos thermal power plant from Nov- 2006 to July – 2011.

7.Nicco Industries Limited as a Dy.Manager- Power Plant –Maintenance of 10MW x 1 nos thermal power plant from April-1990 to Nov-2006

Responsibility:-

1.Responsible for safety of man, machine & housekeeping on the shop floor. etc.

2.Administrating the entire plant operation & maintenance with prefect planning by advance techniques such as PM, TPM, Predictive, etc.

3.Applied Kaizen & 5S System in the organization and developing SAP for Material management, PR, PM Permit and Maintenance Permit.

4.Recommending Equipment purchases & Standardization based upon history and experience.

5.Making annual budget for CAPEX.

6.Formulating & Deploying Strategies for spare parts budgeting & Inventory control.

7.Recommending Equipment purchases & Standardization based upon history and experience.

8.Leading & monitoring the performance of team members to ensure efficiency in operations and meeting of individual & group target.

9.Recognizing areas of improvement and organizing training program for the same.

10.Identifying areas of Breakdowns and taking steps to rectify the equipment through application of trouble shooting tools like root cause analysis

11.Follow up following attribute such as Time management, Interpersonal relationship, Rationalization of available resources, Delegation and empowerment, Prioritization and proactive approach, Analytical problem solving.

12.Monitoring and managing the day to day Mechanical, Electrical of power plant as well as capital improvement and / or expansion projects relating to mechanical, Electrical and civil Engineering initiatives.

13.Conduct advanced engineering studies relating to boilers, turbines, condenser, cooling towers etc, and other mechanical engineering technologies. Evaluate alternatives, makes recommendations and present regularly to senior management on next generation technologies.

14.Develops new processes, procedures and systems as required to conform to optimized plant efficiency, which includes reducing plant and / or machine downtime related to mechanical and electrical issues, focuses on predictive and preventative maintenance for all key equipment.

15.Implementing & adhering of the operation & maintenance procedures like ISO-9001, ISO-14001-2004 EMS, and OHSAS-18001-2008.

16.Follow proper safety procedure permit with RA sheet, tool Box talk, HITRA for Maintenance job.

Job Description:-

1.Improving overall operation and maintenance standards & optimizing maintenance cost & establishing of maintenance systems for better maintenance practices or activities.

2.Responsible for safety of man, machine & housekeeping on the shop floor. etc.

3.Responsibility monitoring the parameters and ensure smooth running of all equipment’s

4.Preparation & planning of spares material, tools & tackles, indenting of the same for timely procurement.

5.Review & improvement / development of existing operation & maintenance process, methods & technology.

6.Identification & implementation of cost reduction measures.

7.Conversant with trouble shooting techniques of major equipment’s of plant.

8.Co-Ordination with purchase department for vendor development & ensuring quality at vendors end is in line with our requirement & suggesting, implementing quality changes & cost reduction projects.

9.Keep all equipment’s data sheet, operating log sheet, Maintenance Breakdown records, documents and correspondence necessary to meet compliance requirement.

10.Minimized cost of Materials and operating expenses, improved methods of Operating and maximized plant utilization by implementing plant shutdown projects.

Achievements:-

1.Achieved 95% PLF.

2.Achieved 100% availability of all the equipment’s.

3.Achieved Reduced Breakdown of Boiler and auxiliaries.

4.Improve the coal losses in coal conveyor and feeding system in Boilers.

Projects:-

1.Installation and commissioning of 17MW x 2 no’s

2.Installation and commissioning of CFBC Boiler, WHRB Boilers and auxiliaries.

3.Installation and commissioning of cooling towers.

Education:-

1.Diploma in Mechanical Engineering from State council of technical of Orissa passed on 1987.

2.Degree in Mechanical Engg from Institute of Mechanical Engineering,Mumbai, passed on 2019

SOFTWARE SKILLS: - AutoCAD, SAP (material management, work permit, modeling, PR, Material codification, material reservation)

Name. Kawaljit Singh

Father’s Name. N.Balbeer Singh

Date of Birth. 02.11.1965

Gender. Male

Nationality. Indian

Language English, Hindi, Punjabi, Oriya.

Address M-24.ph-1.Near VSS, Market.Chhend colony

Rourkela. Sundergarh. ODISHA.

Declaration:-

I hereby declare all the statement made in this application are true complete Skill correct to the best of my knowledge and belief

Date: - Signature of the applicant

Place:-. (Kawaljit Singh)



Contact this candidate