Post Job Free

Resume

Sign in

Engineer Construction

Location:
Fereej Ibn Dirhem, Qatar
Posted:
March 23, 2020

Contact this candidate

Resume:

CV OF GAZI MD BADRUDDOZA

Name: Gazi Md Badruddoza, PEng.

Education :

Name of College/University Dates attended Degree obtained Rajshahi University, Bangladesh 1980-1984 (1982-1986) BSc Engg Civil (1986)

(Bangladesh Institute of Technology

Khulna formerly Khulna Engineering

College under Rajshahi University)

OVERVIEW OF MYSELF : I have over 33 years of experience especially in Expressway/Highway/Bridge/Rural Road projects. I have worked as Senior Pavement Engineer Specialist/Highway Engineer/Quality Control & Quality Assurance

Engineer/Road Maintenance Specialist/Road Asset

Management for Feasibility and Detailed Engineering Studies, preparation of Specifications, Maintenance manual and Supervision manual for Construction

Supervision Projects. I have been involved in the traffic and transportation mobility design and assessing the traffic and transportation mobility matters to resolve the urban mobility matters. I have been involved in pavement condition survey, pavement evaluation survey, roughness survey, International Roughness Index (IRI), BBD test, soil tests, Preparation of Main report and cost estimate involving design, Bill of Quantities and Drawings for tendering and execution of works, Preparation of Bid document and Quality Control Manual for various road works and construction and supervision of Expressway/National Highways including monitoring & evaluation. I have experience in the

Structural and Functional Evaluation of Pavements, evaluation of design parameters and mix design of various pavement layers and Concrete based on tests and quality control tests. Quality Control & Quality Assurance – Formulate quality plan, mix design of cement concrete, asphalt concrete, SBST & DBST, routine check on quality

(MDD, FDT, CBR, LA, ACV & Gradation for construction materials). I have experience more than 15 years in flexible pavement design and concrete pavement design. I have thorough knowledge regarding the using of modified bitumen i.e. PMB for Asphalt Concrete.

I have thorough knowledge of QCS2010 & QCS2014 (Qatar Construction Specifications), IANs, QHDM (Qatar

Highway Design Manual), BS, ASTM, AASHTO, FIDIC,

and International standards and I have experience in International ‘best practices’ in the field of planning, design, Current Position Senior Pavement Specialist Engineer Name of Firm PARSONS INTERNATIONAL Limited – Qatar Date of Birth: 22nd May, 1963

Citizenship Bangladeshi

CV OF GAZI MD BADRUDDOZA

construction and maintenance of flexible/rigid/rural roads pavement including latest codal stipulations and

specification.

I have thorough knowledge of IRC, MORTH, MOST, BS, ASTM, AASHTO, FIDIC, and International standards and I have experience in International ‘best practices’ in the field of planning, design, construction and maintenance of flexible/rigid/rural roads pavement including latest codal stipulations and specification. Thorough knowledge with SATCC Specifications and Standards (Southern African Specifications and Standards).

Thorough knowledge with Snip Specifications and GOST Standards (Russian Specifications and Standards).

I have good command on Microsoft Word, Excel, Microsoft Office, Power Point, AutoCad, Internet browsing, CivilCad and etc.

Affiliations:

• Life Fellow (F/7950), Institution of Engineers, Bangladesh.

• Registered Engineer (15946), MMUP/MME, State of Qatar

• Member (00304908), ASCE, (American Society of Civil Engineers), USA.

• Professional Engineer (PEng). Registered from BPERB (Bangladesh Professional Engineers’ Registration Board), Bangladesh

• Member & Professional Engineer (EIZ No. 220************), The Engineering Institute of Zambia. Language (Spoken & Written):

Language Read Write Speak/Oral

English Excellent Excellent Excellent

Bengali Excellent Excellent Excellent

Academic Training:

• Parsons Project Management Courses (P PMC) Best Practices Jan 2020

• PACE Quality Management Course 2019.

• Construction and Maintenance of Asphalt Pavement, organized by Institution of Engineers, Bangladesh.

• Use and Application of FlDIC-IV, Project Management Tools & Estimating organized by CenTR of Bangladesh Consultants Ltd. Bangladesh.

• Application of Remote Sensing in Survey Works, Aerial Photo Grammetry and Satellite Technology organized by CenTR of Bangladesh Consultants Ltd and Practical Demonstration in SPARRSO Laboratories, Bangladesh.

• Training in Civil CAD and Auto CAD for highway design organized by CenTR of Bangladesh Consultants Ltd., Bangladesh.

• Road Construction Management and Maintenance of Asphalt Pavement, from Institution of Engineers (IEB), Bangladesh.

• Microsoft Office 2008, Microsoft Excel, Microsoft Word, Power point from Center of Bangladesh Consultants Ltd, Bangladesh.

• Attended 1month Training Program for Safety measurement and Construction Management Plan while working in Malaysia Expressway, 6-Lanes project in Malaysia. CV OF GAZI MD BADRUDDOZA

Attended a seminar in Kualampur in the year of 1997 on “Quality assurance and Quality Control” in Malaysia.

• Training for good governance, from Southern Province Rural Economic Advancement Project, Sri Lanka

• Workshop for setting-up the Institutional framework in the Ministry level, Provincial level and Local level for construction, maintenance and financing the rural Infrastructures in the Ministry of Local Government and Provincial Councils, organized by MOLGPC of Sri Lanka and the World Bank in Sri Lanka.

• Training on Road Safety measures in INDIA organized by National Highway Authority of India (NHAI)

• Project Management training organized by NHAI, India

• Contract Management and Project Procurement training organized by NHAI, India

• Environmental measures for the Implementation of the Project

• Brain storming seminar on Indian Specifications (MORST&H) and IRC organized by NHAI, INDIA

• Workshop on “A Brief History of the Development of Bridges and some futuristic Bridge Architecture” Organised by Indian National Group of the IABSE in association with NHAI, India

• Training in Primavera (P6) in INDIA.

• Conducted few workshops on pavement works during the period of project work from August 2015 to till to date in State Of Qatar.

• Training on safety issues, Code of Conduct & professional development with AECOM University

& ParsonsU in The State Of Qatar.

Professional History & Detailed Experience:

Detailed Tasks Assigned on

Consultants Team of Experts:

Reference of Prior work/Assignments that Best Illustrates Capability to Handle the Assigned Tasks

Name of assignment or project: P007 C7 P2-Design & Construction of Al Bustan Street North (Landmark Project).

Year: July 2018 to Present

Company: Parsons International Limited – Qatar

Location: State of Qatar

Client: ASHGHAL, Public Works Authority (PWA), State of Qatar Main Project features: Design & Construction of Al Bustan Street North Project: Project length is 3km, (8-lanes & 3m paved shoulder both sides, 300 thousand Tons Asphalt Works), 4 nos. Interchanges/Junctions (Interchanges No. B6, B5, K1, B4), Collectors & Distributors. B6 (near to landmark mall, crossing the AL Shamal Highway), is the largest and biggest interchanges in Qatar. Total Cost: USD 1.00 billion (approximately).

Position held: Senior Pavement Engineer Specialist Activities performed: Responsible for evaluating designs of pavements. Responsible for selecting the appropriate material for block paving, performing the pavement design process, implementing pavement management system, monitoring pavement using different evaluation techniques, managing, planning, design and design reviews, reporting of projects, method statements. Responsible for carrying out geometric layouts, horizontal and vertical alignments pavement analysis, signing, directional signing, and marking. Responsible for highway geometric and structural design including all related street furniture. Liaising, coordination and follow up with clients, sub- consultants & prequalification and evaluation of contractors. CV OF GAZI MD BADRUDDOZA

Responsible for quantity take off, cost estimate, preparation of tender documents and Particular Specifications. Coordinating with the client and all concerned authorities. Performing other responsibilities associated with this position as may be appropriate. Exposure to QA procedures around Hot Mix Asphalt Plant. Ensure the usage of material and mix as per specifications (QCS2014 & project specifications). Ensuring the contractor to adhere to maintenance standards during construction and defect liability period, ensuring usage of international

‘best practices’ in the field of design, construction and maintenance of flexible/rigid pavement including latest codal stipulations and specification and quality control of construction materials. Responsible for maintaining the riding quality of the road surface. Monitor and assess the CAP and CAS with ANAS representatives. Organize the training program & workshop with pavement/Roads team members. Responsible for Ensure that the Contractor fulfill his contractual obligations. Review and Comment on the Contractor Program submission by analyzing the sufficiency of plant, manpower, rate of output and material source proposed by him and construction methodology of sub-base, road-base & asphalting works. Review & comments on the ITP (inspection & testing plan) & Method Statement of Road Works/Asphalting works/rigid pavement. Issuing the NCR/CAR/SOR for unspecified works. Review the traffic survey and axle load survey for design the roads and the cost-effective pavement thickness. Review the Construction and Maintenance Manual. Review the Contractor’s schedule and report. Supervise the regular quality control test at site and laboratory. Check the borrow materials for construction of road works. Review the sufficiency and approve the Contractor Quality Assurance Manual and Maintenance Manual, Traffic Management Plan, Health, Safety and Environmental Plan by ensuring that it covers the minimum Technical Specifications and Guidelines as required while assisting the Senior Resident Engineer, Resident Engineer (Roads), Safety Engineer, Senior Material Engineer & QA/QC Manager. Provide inputs in the preparation of QA/QC reports. Monitor progress against the work program submitted by the Contractor. Carryout test as per ASTM, AASHTO, BS, & International Standards. Checking the riding quality, evenness test & other tests as per the Specifications.

Name of assignment or project: P023-Design & Construction of New Orbital Highway & Truck Route Project. Contract C1 (Mesaieed to Orbital Highway Route), Contract C2 (Salwa Road to North Relief Road) & Contract C3 (Mesaieed to Salwa Road).

Year: June 2017 to June 2018

Company: AECOM Middle East Limited - Qatar

Location: State of Qatar

Client: ASHGHAL, Public Works Authority (PWA), State of Qatar Main Project features: Design & Construction of New Orbital Highway & Truck Route Project, C1: Project length is 43km, (5-lanes & 3m paved shoulder both sides, 1.4 million Tons Asphalt Works), 4 nos. Interchanges/Junctions, Collectors & Distributors. Total Cost: USD 1.00 billion (approximately). C2: Project length is 45km, (5 lanes plus 2 lanes Truck Route & 3m paved shoulder both sides, 1.8 million Tons Asphalt Works). 8 nos. Interchanges/Junctions, Collectors & Distributors. Total Cost: USD 1.50 billion

(approximately).

C3: Project length is 45km (5 lanes plus 2 lanes Truck Route & 3m paved shoulder both sides, 2.1 million Tons Asphalt Works), 5 nos. Interchanges/Junctions, Collectors & Distributors. Total Cost: USD 1.70 billion

(approximately).

CV OF GAZI MD BADRUDDOZA

Position held: Senior Pavement Engineer Specialist Activities performed: Responsible for evaluating designs of pavements. Responsible for selecting the appropriate material for block paving, performing the pavement design process, implementing pavement management system, monitoring pavement using different evaluation techniques, managing, planning, design and design reviews, reporting of projects, method statements. Responsible for carrying out geometric layouts, horizontal and vertical alignments pavement analysis, signing, directional signing, and marking. Responsible for highway geometric and structural design including all related street furniture. Liaising, coordination and follow up with clients, sub- consultants & prequalification and evaluation of contractors. Responsible for quantity take off, cost estimate, preparation of tender documents and Particular Specifications. Coordinating with the client and all concerned authorities. Performing other responsibilities associated with this position as may be appropriate. Exposure to QA procedures around Hot Mix Asphalt Plant. Ensure the usage of material and mix as per specifications (QCS2010, QCS2014 & project specifications). Ensuring the contractor to adhere to maintenance standards during construction and defect liability period, ensuring usage of international ‘best practices’ in the field of design, construction and maintenance of flexible/rigid pavement including latest codal stipulations and specification and quality control of construction materials. Responsible for maintaining the riding quality of the road surface. Monitor and assess the CAP and CAS with ANAS & KBR representatives. Organize the training program & workshop with pavement/Roads team members. Responsible for Ensure that the Contractor fulfill his contractual obligations. Review and Comment on the Contractor Program submission by analyzing the sufficiency of plant, manpower, rate of output and material source proposed by him and construction methodology of sub-base, road-base & asphalting works. Review & comments on the ITP (inspection & testing plan) & Method Statement of Road Works/Asphalting works. Issuing the NCR/CAR/SOR for unspecified works. Review the traffic survey and axle load survey for design the roads and the cost-effective pavement thickness. Review the Construction and Maintenance Manual. Review the Contractor’s schedule and report. Supervise the regular quality control test at site and laboratory. Check the borrow materials for construction of road works. Review the sufficiency and approve the Contractor Quality Assurance Manual and Maintenance Manual, Traffic Management Plan, Health, Safety and Environmental Plan by ensuring that it covers the minimum Technical Specifications and Guidelines as required while assisting the Senior Resident Engineer, Resident Engineer (Roads), Safety Engineer, Senior Material Engineer & QA/QC Manager. Provide inputs in the preparation of QA/QC reports. Monitor progress against the work program submitted by the Contractor. Carryout test as per ASTM, AASHTO, BS, & International Standards. Checking the riding quality, evenness test & other tests as per the Specifications.

Name of assignment or project: P019-Construction of AL Jemailiya / AL Otouriyah / AL Shihaniyah Road. Year: August 2015 to May 2017

Company: Egis International, Middle East

Location: State of Qatar

Client: ASHGHAL, Public Works Authority (PWA), State of Qatar Main Project features: Construction for Rehabilitation and Reconstruction of Construction of AL Jemailiya / AL Otouriyah / AL Shihaniyah Road, Project length is 29km (6-lane plus 3m paved shoulder both sides & Cycle way), Total Cost: USD 125 Million

Position held: Senior Pavement Engineer Specialist Activities performed: Responsible for pavement condition survey and review of investigation data, review of pavement design, road alignment and construction materials, review of design of geometric alignment all along the project, interacting with the co Responsible for pavement condition survey and review of investigation data, review of pavement design, road alignment and construction materials, review of design of geometric alignment all along the project, interacting with the contractor and PMC (project management consultant) to ensure life cycle cost effectiveness and viable design of pavement including rehabilitation and strengthening of existing pavement. Ensure the usage of material and mix as per specifications (QCS2010, QCS2014 & project specifications). Ensuring the contractor to adhere to maintenance standards during construction and defect liability period, ensuring usage of international ‘best practices’ in the field of design, construction and maintenance of flexible/rigid pavement including latest codal stipulations and specification and quality control of construction materials. Responsible for maintaining the riding quality of the road surface. Monitor and assess the CAP and CAS with ANAS & KBR representatives. Organize the training program & workshop with pavement/Roads team members. Responsible for Ensure that the Contractor fulfill his contractual obligations. Review and Comment on the Contractor Program submission by analyzing the sufficiency of plant, manpower, rate of output and material source proposed by him and construction methodology of sub-base, road-base & asphalting works. Review & comments on the ITP (inspection & testing plan) CV OF GAZI MD BADRUDDOZA

& Method Statement of Road Works/Asphalting works. Day to day site inspection and prepare the site inspection report. Issuing the NCR/CAR/SOR for unspecified works. Review the traffic survey and axle load survey for design the roads and the cost-effective pavement thickness. Review the Construction and Maintenance Manual. Review the Contractor’s schedule and report. Supervise the regular quality control test at site and laboratory. Review the mix design of sub-base, base course, asphalt. Check the borrow materials for construction of road works. Review the sufficiency and approve the Contractor Quality Assurance Manual and Maintenance Manual, Traffic Management Plan, Health, Safety and Environmental Plan by ensuring that it covers the minimum Technical Specifications and Guidelines as required while assisting the Senior Resident Engineer, Safety Engineer, Senior Material Engineer & QA/QC Manager. Provide inputs in the preparation of QA/QC reports. Monitor progress against the work program submitted by the Contractor. Carryout test as per ASTM, AASHTO, BS, & International Standards. Evaluate the pavement design process. Develop the Pavement Management System. Liaising and coordination with the clients (ASHGHAL), ANAS (design consultant), KBR (project management consultant), sub- consultants and (QBC) construction Contactor. Checking the riding quality, evenness test & other tests as per the Specifications.

Name of assignment or project: National Road Fund Agency-, Upgrading to Bituminous Standards of approximately 235km of Mpika to Nabwalya to Mfuwe Road (RD49) in Muchinga Province in Zambia under

“THE LINK ZAMBIA 8000KM PROJECT”.

Year: Dec 2014 to July 2015

Company: Bari Zambia Limited

Location: Republic of Zambia

Client: Road Development Agency, Republic of Zambia Main Project features: Construction for Rehabilitation and Reconstruction of Mpika-Nabwalya- Mfuwe Road, Project length is 235km (Lot1-118km & Lot2-117km), Total Cost: USD 140 Million (Lot1-USD 63 million & Lot2-USD 77 million)

Position held: Team Leader/Resident Engineer Cum Senior Highway Engineer Activities performed: Responsible for pavement condition survey and review of investigation data, review of pavement design, road alignment and construction materials, review of design of geometric alignment all along the project, interacting with the contractor, to ensure life cycle cost effectiveness and viable design of pavement including rehabilitation and strengthening of existing pavement, preparing the maintenance manual of roads, ensure the usage of material and mix as per specification., ensuring the contractor to adhere to maintenance standards during construction and defect liabilities period, ensuring usage of international ‘best practices’ in the field of design, construction and maintenance of flexible/rigid pavement including latest codal stipulations and specification and quality control of construction materials. Responsible for design the construction supervision of Flexible Pavement and Rigid Pavement (Concrete Pavement). Plans, creates and manages traffic and transportation mobility engineering design that is safe, functional, technically accurate. Assessing the traffic and transportation mobility matters for resolving the mobility matters. Capable to develop the scope of work (SOW), specifications, and design criteria for traffic and transportation mobility and infrastructure projects. Responsible for ensuring that the Contractor fulfill his contractual obligations. Review and Comment on the Contractor Work Program submission by analyzing the sufficiency of plant, manpower, financial S-curve, accuracy of quantities, rate of output and material source proposed by the contractor and construction methodology. Day to day site inspection and prepare the site inspection report. Issuing the NCR for unspecified works. Construction supervision of Roads, Bridges and Culverts, etc. Assist the client for technical matters. Conduct the monthly site meeting with the client, and contractor and prepare the minutes of meeting. Review the traffic survey and axle load survey for design the roads and the cost-effective pavement thickness. Review the Construction and Maintenance Manual. Review the Contractor’s schedule and report. Supervise the regular quality control test at site and laboratory. Review the mix design of sub-base, base course, DBST, asphalt and concretes. Check the borrow materials for construction of road works. Check the Good for construction drawings and As-built drawings. Prepare and submit the Monthly and quarterly progress report to the client. Review the sufficiency and approve the Contractor Quality Assurance Plan (QAP) and Maintenance Manual, Traffic Management Plan, Health, Safety and Environmental Plan by ensuring that it covers the minimum Technical Specifications and Guidelines as required. Monitor progress against the work program submitted by the Contractor. Assist to finalize the Change of scope

(COS)/Variation Order (VO) with financial implications and quantities. Review the rate analysis of unquoted items. Responsible for pavement design including appropriate rehabilitation/strengthening of the existing two lanes pavement which is significantly distressed. Evaluate the pavement design process. Develop the Pavement CV OF GAZI MD BADRUDDOZA

Management System. Liaising and coordination with the clients and sub-contractors and evaluation their contracts. Thorough knowledge with SATCC Specifications and standards (Southern African Specifications and Standards). Name of assignment or project: ADB Grant No.0301-TAJ(SF) CAREC CORRIDOR-6, Construction for Rehabilitation and Reconstruction of Ayni-Panjakent-Uzbekistan boarder Road. Year: Oct 2014 - Nov 2014

Company: Kocks Consult GmbH and BCL Associates Ltd J/V. Location: Tajikistan

Client: Ministry of Transport of the Republic of Tajikistan Main Project features: Construction for Rehabilitation and Reconstruction of Ayni - Panjakent- Uzbekistan Boarder Road, Project length is 113km, Cost: USD 142 Million Position held: Road Maintenance Specialist

Activities performed: Responsible to review of technical studies of the past road projects. Responsible to provide recommendation for the (i) local roads maintenance and rehabilitation (ii) Development of road asset management systems, and (iii) Road maintenance strategy and medium-term planning. Responsible to assist Ministry of Transport (MOT) with the implementation of the community development component as relevant. Responsible to advice and support the development of road asset management systems which is ongoing under another ADB financial road projects. Responsible to advice Ministry of Transport (MOT) on maintenance strategies and technical solutions, placing relationship target levels of service with available resources. Plans, creates and manages traffic and transportation mobility engineering design that is safe, functional, technically accurate. Assessing the traffic and transportation mobility matters for resolving the mobility matters. Capable to develop the scope of work (SOW), specifications, and design criteria for traffic and transportation mobility and infrastructure projects. Responsible to advice Ministry of Transport (MOT) in the development of its road maintenance strategies and medium-term planning; assist in the optimizing of the medium and long-term maintenance programs. Responsible to conduct training session to Ministry of Transport’s (MOT) staff and other related people on maintenance management and asset management systems. Responsible to oversee the condition surveys of candidate feeder roads that will be included in the feeder roads rehabilitation/improvement contracts. I have thorough knowledge of SNIP Specifications and GOST Standards (Russian Specifications and Standards). Name of assignment or project: TA-8411 GEO: Secondary Road Improvement Project – Feasibility Study and Preliminary Design (46375-001) for “Dzirula-Kharagauli-Moliti-Pona-Chumateleti” Km 00+000 to Km 50+000 Road Section

Year: Aug 2014 – Sep 2014

Company: KOCKS Consult GmbH and BCL Associated Ltd J/V. Location: Tbilisi, Georgia

Client: Roads Department, Republic of Georgia

Main Project features: Project Length: 50Km. Project Cost: US$ 100 Million, Position held: Road Maintenance Specialist

Activities performed: Responsible for determining the current secondary road maintenance practices and cost of the project road, with particular attention to the frequency, types, materials, labor, contractors, equipments, procurement method, time completion and compare with the acceptable norms. Analyses the resources on the basis of finance, equipments and the human resources for the maintenance of roads. Examine the Georgian experience with procuring the maintenance works including Performance-based method and recommend the most efficient method for the project road. Analysis and present the options for generating the direct revenue and indirect revenue cost for maintenance the road and estimated the amounts. Examine the potentiality of the post construction maintenance of the project road as part of the contract (construct and maintain) and finalize the matter with Roads Department and the ADB. Determine the road design options and pavement thickness. Thorough knowledge with SNiP specifications and GOST standards (Russian Specifications and Standards). CV OF GAZI MD BADRUDDOZA

Name of assignment or project: Independent Engineer Services for 4-laning of Talegaon – Amravati Section of NH-6 from km 100.000 to km 166.725 (Length – km 66.73) in the state of Maharashtra under NHDP Phase III on DBFOT Basis (PPP Project)

Year: Apr 2012 – July 2014

Company: CDM Smith Inc. (formerly Wilbur Smith Associates Inc.) Location: Maharashtra, India

Client: National Highways Authority of India (NHAI) Main Project features: Project Length: 66Km. Project Cost: INR 5670 Million, Position held: Deputy Team Leader cum Senior Pavement Specialist Activities performed: Responsible for pavement condition survey and review of investigation data, review of pavement design, road alignment and construction materials, review of design of geometric alignment all along the project, interacting with the concessionaire, to ensure life cycle cost effectiveness and viable design of pavement including rehabilitation and strengthening of existing pavement, preparing the maintenance manual of roads and Toll Plaza, ensure the usage of material and mix as per specification., ensuring the concessionaire to adhere to maintenance standards during construction and operation period, ensuring usage of international ‘best practices’ in the field of design, construction and maintenance of flexible/rigid pavement including latest codal stipulations and specification and quality control of construction materials. While assisting Team Leader and his absence, ensure that the Concessionaire fulfill his contractual obligations. Review and Comment on the Concessionaire Program submission by analyzing the sufficiency of plant, manpower, financial S-curve, accuracy of quantities, rate of output and material source proposed by him. Construction supervision of Bridges, Culverts, Drainage Structures, VUP, CUP, PUP, RUB ROB and Fly-Over etc. Review the drawings and construction supervision of RE Walls. Review the sufficiency and approve the Concessionaire Quality Assurance Manual, Traffic Management Plan, Health, Safety and Environmental Plan by ensuring that it covers the minimum Technical Specifications and Guidelines as required. Plans, creates and manages traffic and transportation mobility engineering design that is safe, functional, technically accurate. Assessing the traffic and transportation mobility matters for resolving the mobility matters. Capable to develop the scope of work (SOW), specifications, and design criteria for traffic and transportation mobility and infrastructure projects. Review the road design guidelines and specifications, Check the traffic survey and axle load survey to design the road and cost-effective pavement. Review the traffic survey and axle load survey. Review and approve the Concessionaire Methodologies and ensure that the safety of work has been included as one of the criteria besides ensuring his compliance with the Technical Specifications. Act fairly without prejudice or favor in administering the Contract, Ensure the Concessionaire follows all Technical Specifications and FIDIC clauses in the execution of the Project. Check, comment and approved all drawings submitted by the Concessionaire or Good for Construction Drawings (Working Drawings) are complying with the minimum requirements of the Client. Monitor the quality of work executed by the Concessionaire are in compliance with the methodology proposed by him and the source of materials are



Contact this candidate