Post Job Free

Resume

Sign in

Engineer Civil

Location:
Dubai, Emirate of Dubai, United Arab Emirates
Posted:
March 23, 2020

Contact this candidate

Resume:

Curriculum Vitae

REMON HANNA ZAREF ATALLH

: 009**-**-******* / 009**-**-*******

: adce0e@r.postjobfree.com

: https://www.linkedin.com/in/remon-atallh-12913964

Sr. CIVIL ENGINEER / Sr. QA/QC ENGINEER [QMS ISO9001-2015 Lead Auditor]

Profile Snapshot

Certified Lead Auditor ISO 9001:2015 & Manager of Quality in progress with 18 years of experience in:

~Project Coordination & Control

~Quality Management

~Site Execution

~Team Management

~Stakeholder Management

~Process Optimization

Over 18 years of professional experience in construction (14 years in U.A.E + 4 years in Egypt).

Project quality, construction, Management, Contracting, consultancy and Technical management.

Cost control, Qs and value engineering.

Coordination and monitoring project activities.

Very good knowledge of high-quality concrete structures well versed with high performance concrete, latest concrete technology, special requirements for mass concrete, concrete and reinforcement.

Ability to deal with people diplomatically with effective communication skills.

Honest, hardworking, result-oriented and resourceful.

Willingness to learn with emphasis on details and can easily adapt to any given situation.

Well versed with all types of building construction activities, analyzing site logistics, sequences of construction activities.

EDUCATIONAL QUALIFICATION

Bachelor of Civil Engineering, June 2001.

South Valley University, Egypt.

PMP Course

FEDIC 1999 Course.

Organizational Experience

( Since May, 2016 to Present

SEIDCO GENERAL CONTRACTING. LLC

Position: Sr. QA\QC Engineer.

1-Mismak Residential, Commercial Complex Tower (4 FL. Podium + 25 FL Typ.+ Roof) & Mosque – Najmat, Abu Dhabi

2-

Client : Mismak Properties

Consultant : Ghazi Awad Architects & Engineers.

Cost : 378 Million Dirham.

3-United Square Development, Khalidiyah Abu Dhabi.

(2 FL. Basement + 2 FL. Podium + 3 Towers (18 FL Typ., 16 FL Typ. And 14 FL Typ.)

Client : International Capital Trading (ICT).

Consultant : EHAF Consulting Engineering.

Cost : 460 Million Dirham.

( From November, 2015 till May, 2016

FIBREX CONSTRUCTION LLC.

Position: Sr. QA\QC Engineer.

Project : Midfield Terminal Building project, Abu Dhabi

international airport.

Client : Abu Dhabi Airports Company (ADAC).

Construction Management: AECOM.

Consultant : Kohn Pedersen Fox Associates (KPF)

Main Contractor : The joint venture (JV) of TAV, CCC, and Arabtec

\

Job Responsibilities: -

1-Maintain the Project Quality Management System documentation in according Quality Management System requirements.

2-Understand the requirements of the drawings / specifications and ensure there are no ambiguities in the standards to be achieved, i.e. workmanship, benchmarks, material sample etc.

3-Provide guidance and supervision to Quality Engineers, Quality Assistants and Quality Clerks.

4-Prepare and ensure all Method Statements and Inspection Test Plans are being progressed as Planned.

5-Provide Inspection and Testing Services to ensure that workmanship and material are as specified.

6- Assist in carrying out audits in accordance with the audit schedule.

7-Assess potential / actual non-compliances and as applicable issue of observation / Non-Conformance Reports for management evaluation.

8- Monitor close-out of corrective actions.

9-Assist in the management of site field tests listed in the specification.

10- Ensure Quality Control and Inspection records are maintained.

11-Maintain and issue Quality Control reports as specified.

12- Check the works for compliance with the specifications.

13- Maintain good working relations.

14-Regular report progress and performance to line manager and others as instructed.

\

From July, 2007 till November, 2015

ARCHITECTURAL CONSULTING GROUP

Position:

Civil engineer.

1-Najmat Residential Tower in Reem island, Abu Dhabi, 3B+G+2P+23 TYP +Roof

Client : Al Wifaq Finance Company.

Contractor : FIBREX Construction Group

Project cost : 225 Million Dirham.

2-Finance House Headquarters Building at Capital Centre Abu Dhabi,4B+G+2M+18 FL.+ R.

Client : Finance House.

Contractor : Benyan Development Co. (L.L.C).

Project cost : 135 Million Dirham.

135

3-Mixed Use Development (Three Office Towers) at Abu Dhabi,

3B+G+M+24 FL.+ S.

136

1-

Client : Link Investments Co. First Gulf Bank.

Abu Dhabi Commercial Bank.

Contractor : Seidco General Contracting Co. (L.L.C).

137

Project cost : 225 Million Dirham.

Job Responsibilities: -.

1-Inspect and supervise all permanent works in accordance with spec/drawings and statutory Regulations.

2-Issue site instruction, Non conformance report and safety observation.

3-Review and monitor Contractor’s procedures/ practices for health and safety.

4-Review and monitor contractor’s shop drawings, materials and method statements. Record changes on site and Review as-built drawings/ submissions.

5-Monitor contractor’s progress on site.

6-Evaluation of contractor’s claims and issue evaluation of variation letter.

7-Prepare weekly and monthly report for the progress on site.

From June, 2005 till June 2007

EMIRATES ENGINEERING CONSULTANT GROUP (EECG)

Position:

Civil Engineer

1-

Project : Dates Receiving Center at Wadi Al Khair –Liwa,

Client : Al Foah Palm Sector Development,

Contractor : Al Qantara General Contracting Company (L.L.C).

Project cost :

14 Million Dirham.

2-

Another projects: Many Villas in Abu dhabi city, Khalifa A, Khalifa B,

El Shama, El Samha,El Shamkh, Bani Yas, Madina Zayed and Liwa .

From January 2004 till May 2005

DARAWO MUNICIPALITY – ASWAN GOVERNORATE –Egypt

Position: Civil engineer for the following Responsibilities: -

A- Preparing the Tenders for Municipality projects.

B- Supervision of Municipality projects.

From September, 2001 till December, 2003

SAAD HANA SONS COMPANY Egypt – Cairo

Project : Establishing sewage system serving the cities of Aswan Governorate – Egypt. (sub-contractor)

Client : USAID/Egypt, Environment and Infrastructure Office, Water & Wastewater Division.

Contractor : Joint venture between Washington International Inc. of Boise, Idaho (formerly Morris Knudsen) and Contrack International Inc. of Arlington, Virginia (part-owned by Orascom Construction Industries of Cairo)

Project cost : $107 million.

Languages known

Arabic: Mother Tongue, excellent in writing, reading and conversation.

English: Good in Writing, Reading and Conversation.

Personal Details: -

Date of Birth :25th of September, 1979.

Nationality : Egyptian.

Marital status : Married.

Visa : Employee Visa.

Driving Licenses : U.A.E Driving License.

Communications and Computer Skills: -

Ms Office programs (Word, Excel and Power point).

AutoCAD, Sap2000, SAFE 12, ETABS 2013.

Primavera P6.

DARAWO MUNICIPALITY –Egypt

Jan’04-May05

Since May 16

Jul’07-Nov’15

SAAD HANA SONS, Egypt

Sep’01-Dec03

Nov’15-May’16

EECG

Jun’05-Jul’07

Work

Experience

Site

Engineer

Sr.QA/QC

Engineer

Sr.QA/QC

Engineer

Civil

Engineer

Civil

Engineer

Civil

Engineer



Contact this candidate