MOHAMED ROSHDI
MOHAMED ELSAYED
Cairo, Egypt
Current Project: Assuit Thermal power plant Super
Critical ( 650 M.W )
Mobile: +201*********
E-mails: *********@*****.***
***************@*****.***
Nationality: Egypt
Marital Status: Married
A trilingual Project Manager who’s never missed up the academic engineering and fundamentals with that long career timeline and dozens of experiences, up to two decades of engineering national and international experience in both power plants and oil & gas projects; troubleshooting any technical obstacles with a complete consideration of safety and quality concepts, managing my team to the great milestones. And it still remains; a new project, a new challenge. EMPLOYMENT TIMELINE
Doosan Heavy Industries & Construction
Job Title: Project Manager
Project: Assuit Super Critical Power Plants 650 M.W Category: Power Plants Project
Overall responsibility For Installation of Steam turbine Generator, Boiler. Responsible for the site constructions.with subcontract Management the team to achieve the accurate milestones designed for the project Responsible for CCC and pre-commissioning procedures first fire RTR Steam Turbine and TOC
Siemens
Job Title: Construction Site Manager
Project: New Capital Combined Cycle CCPP [4800MW]
Category: Power Plants Project
Overall responsibility for the combined cycle
.Installation of GT Turbine, Steam turbine, HRSG,
BOP. Responsible for the site constructions.
Managing the team to achieve the accurate milestones designed for the project Responsible for the
pre-commissioning procedures first fire, RTR Steam Turbine and TOC
References :
Name Job Title Contact. No
Thomas Bundesmann General Site Manager +491**********
Email ID ( ******.**********@*******.*** )
1st February 2019 tell now
Location: Assuit, Egypt
1st Jan 2017 tell Jan 2019
Location: New Capital, Egypt
IREAM SPA
Job Title: Site Manager
Project: AlBurllus Combined cycle CCPP [4800MW]
Category: Power Plants Project
Overall responsibility for the combined cycle
.Installation of GAS, Steam turbine, HRSG,
BOP. Responsible for the site constructions.
Managing the team to achieve the accurate milestones designed for the project Responsible for the
pre-commissioning procedures first fire and
1st September 2016 to Jan2017
Location: AlBurllus, Egypt
Project Planning and Monitoring Schedule tasks, deadlines and milestones for all stakeholders and resources Create Gantt charts in MS Project Create detailed chart of milestones for all parties Identify schedule uncertainties and risksDevelop schedule contingency plans Project Monitoring and Control:Run the project on a day-to-day basis Coordinate designers, coders, other staff, service providers, and clients Disseminate information to project team through task and sub-tasks assignment based on requirements Coordinate communication between staff and third parties acting on behalf of the client Efficiently and competently manage problems - when things go off plan (due to scope-creep, changed requirements, missed deadlines etc.) bring them back on plan or create a new plan with the assistance of key-stakeholders Intimating the operation manager to take proper corrective and preventive actions when there is lagging from the schedule. Identifies deviation from critical path and proposes solutions to revert to original program. Intimately understand the requirements of the project and ensure that work proceeds on-spec Evaluate deliverables prepared by the team to make sure the work meets requirements and maintains a high level of quality Constantly monitor and report on the progress of a project to all stakeholders Work with Site Engineer as needed to revise Scope & architecture as needs of the client/project evolve. Manage and Co-ordinate the updating of reporting plan and progress by: Conducting cost verses budget analysis. Reporting the cost impact of any variance from schedule. Reports any significant changes to the project schedule and its cost significance. Manage project risk Developing project risk management strategy Implementing a project risk management infrastructure Generally managing within the risk management context, for example setting objectives, forecasting, planning, organizing, directing, coordinating, controlling and communication Marginal Functions Supervise the Project Procurement activities. Communicate with customers related to project pitfall clarification and related issues. Coordinate with accounts and finance to follow up The availability of required resource Submit analytical reports to senior management when required with prior approval of operation and contract manager.
GE / Orascom JV
Job Title: Site Manager
Project: Assiut Combined Cycle [8X125] MW.
Category: Power Plants
17th January 2015 to June 2016
Location: Assiut, Egypt
Overall responsibility for the combined cycle
*.Installation of GAS, Steam turbine, HRSG, BOP Responsible for the site constructions.
Managing the team to achieve the accurate milestones designed for the project Responsible for the pre-commissioning procedures first fire and commissioning
Responsible for the site constructions. pre-commissioning procedures first fire and commissioning
Accomplishing the milestones in time.
Outage calibration, functional checks Troubleshooting
Disassembly, Inspection, Reassembly Procedure Writing
Problem Solving Technical Assistance Planning /
Scheduling Turbine Auxiliary Systems Lube Oil System
Hydraulic supple, Cooling and Sealing Air System
Fuel Gas System Fuel Oil System Fuel Forwarding System
NOx Control System Atomizing Air System Inlet Guide Vane System Compressor Cleaning System Inlet System Starting System Protection System
KahroMecha Misr for Mechanical & Electrical Projects Job Title: Project Manager
Project: Ain EL Sokhna super critical power plant
Category: Thermal Boiler (Aalborg vertical boiler.) February 2013 to October 2014
Location: suez Egypt
Boiler Main Steel Structures including: top Deck
Steel, vertical Frame, horizontal Frame, high Strength Bolts, plates for Joints, Elevator Structural Steel and Air Heater Structural Steel. Secondary & Service Structures including: roof Support Steel, gratings structural steel, stairs, railings end accessories, gratings,
Checkered plates and roof sheet. Pressure Parts including: pressurized Furnace Water wall with Hopper Bottom and Upper and Lower Wall Headers; Economizer complete with headers and connecting piping; Primary, Secondary & Tertiary Super heaters complete with headers and Interstate Attemperators; Primary & Secondary Re heaters with headers and emergency Attemperating System; Down Comers &Interconnecting Piping. Vertical Steam Separator and vessels. Steel workforce Pressure Part including Buck stays Roof Hopper and Arch Buck stays; Seismic links, Penthouse Structural Steel; Penthouse sheets; Wind box Structural Steel; Wind box Sheets; Bottom Casing Structural Steel, Bottom Casing Sheets; Furnace Bottom Hopper Seal; Economizer Hopper; Penthouse Penetration Seals; Special Closures; Skin Casing; Doors and Casing, Opening for Furnace TV Control System.
Top Supports (Spring Type), Top Supports (Hanger Rod Type); Supports for Boiler Internal Piping (spring and rigid type). Boiler Circulation Pumps. Air & Gas Ducts including Cold Air Duct up to Regenerative Air Heater; Air Duct From A.H. to Wind box; Gas Duct from Eco to DESP; Gas Duct from DESP to Stack; Recirculating Gas Ducts; Cross-Over Ducts; Supports for Duct (Spring Type); Supports for Ducts (Rigid Type); Expansion Joints (metallic/textile type);Instrument Connections; Dampers including: Air-Gas Duct Shut-Off Dampers; Air/Gas Duct Control Dampers and Sealing Air Shut-Off Dampers Gas/Air Heaters (R.A.H.) including: Housing and Connecting Ducts; Rotors; Seals; Heating Elements and Baskets; Bearing Supports and Truncation; Rotor Drive Unit (Motors and Gear Reducer); Washing and Fire Fighting Device .team Coil Air Pr-Heater. FD Fans & Electrical Motors; GR Fans & Electrical Motors; Silencers for fans; Sealing air fans, Cooling/Sealing air fans etc. Steam/Water External Piping & Supports, attempting Water Piping for SH and RH system; Feed Water, Main Steam, Auxiliary Steam Piping; Drains and Vents Piping; supports of Boiler External Piping (spring and rigid type), and Blow down Tanks (intermittent & continuous). Valves including Burner Front Solar Oil, Mazout Oil and Gas; Atomizing Actuated and Manual Valves; Steam Water Control and Manual Valves; Safety Valves with proper Silencers and Soot blowers system manual/automatic valve
.Fuel Solar Oil, additive Mahout Oil and Gas Supply system including: Piping, Supports, Filters, Drain and Instrumentation system Fuel Solar Oil, Mazout Oil and Gas Front Piping including: Front Piping and Supports; Fuel Oil Drain Tank and Drain tanks; Recovery Pumps .Burners with proper genitors Soot blowers-Dust Cleaning Equipment including : 4 Half Retractable type ann 24 Full Retractable type, Soot blowers for Air Heater, Thermopylae and Soot blowers Support Steel .Hoists with proper Monorail auxiliary system including: Sealing-Cooling Air piping and supports; Instrument& Service Air system; Drains and Vents for Steam &Water system; Drain fuel system, Sample system; Chemical Dosing system; temporary Steam Blowing Piping; Preservation Piping; Acid Cleaning Provisional Supply; Cooling Water Systems; Auxiliary Steam, Air Heater Chemical Washing system Valves and Silencer for boiler blowing Auxiliary boiler with ancillary and proper stack
Installation and commissioning of two steam turbine Mitsubishi oil flashing 2*650 MW
Responsible for erection and commissioning of two boiler super critical
Installation piping critical noncritical SS pipe and all the hydro test Bop Equipment Feed water pump condensate pump cwp pump
Travelling water screen and all Bop piping doing hydro test chemical clean
Steam blow finishing until Responsible for the pre-commissioning Procedures hydro test steam blow and commissioning
Kharafi National Egypt
Job Title: Site Manager
Project: Ismailia Power Plant Gas Turbine GE Frame 9E [8X125] 1000 MW
Category: Power Plants
August 2011 to December 2012
Location: Ismailia, Egypt
Responsible for all site constructions for the simple cycle PP under GE supervisor Commissioning responsibility with received T.O.C
* Outage calibration, functional checks Troubleshooting
•Disassembly, Inspection, Reassembly Procedure Writing
•Problem Solving Technical Assistance Planning / Scheduling Turbine Auxiliary Systems Lube Oil System Hydraulic supple, Cooling and Sealing Air System Fuel Gas System Fuel Oil System Fuel Forwarding System NOx Control System Atomizing Air System Inlet Guide Vane System Compressor Cleaning System Inlet System Starting System Protection System
KahroMecha Misr for Mechanical & Electrical Projects Job Title: Site Manager.
Project: Cairo west power plant [2X375]MW
Category: Coal Fire Power Plants
January 2009 to August 2011
Location: Cairo, Egypt
Installation and commissioning of two steam turbine Mitsubishi oil flashing
Responsible for erection and commissioning of two boiler Hitachi
Installation piping critical noncritical SS pipe and all the hydro test
Bop Equipment Feed water pump condensate pump cwp pump
Travelling water screen and all Bop piping doing hydro test chemical clean
Steam blow finishing until
Consolidated Contractors Company
Job Title: General construction Manager
Project: Liquid Natural Gas
Category: Nuclear Gas power Plants
August 2008 to Jan 2009
Location: Cairo, Egypt
Installation and commissioning procedures GE Turbines frame 6 under supervision CTJV Company Installation and commissioning procedures HRSG 125 MW Installation and commissioning procedures BOP plant and rotating,Static equipment Piping fabrication, installation and hydro test all system KBR company
Job Title: Construction Manager
Project: Elkorimat Solar Power Plant 150 MW
Category: Solar Energy
July 2007 to july 2008
Location: Egypt
The land is equipped and settled to start a civil business & the solar cell panels are installed Solar cells are installed,& Installation and commissioning procedures TECHINT CIMI MONTUBI
Job Title: Construction Manager
Project: Trbiago Power Plant 2*650 MW
Category: Thermal Power Plants
August 2003 to November 2007
Location: Italy
Installation and commissioning of two steam turbine Mitsubishi oil flashing 2*650 MW
Responsible for erection and commissioning of two boiler super critical
Installation piping critical noncritical SS pipe and all the hydro test Bop Equipment Feed water pump condensate pump cwp pump
Travelling water screen and all Bop piping doing hydro test chemical clean
Steam blow finishing until Responsible for the pre-commissioning Procedures hydro test steam blow and commissioning
TECHINT CIMI MONTUBI
Job Title: Lead mechanical engineer.
Project: Franz Thermal Power Plant [2X650] MW
Category: Coal fire Power Plants
July 2002 to July 2003
Location: Italy
Installation of steam turbines.
Responsibility of commissioning procedures
Installation of all auxiliary pumps, feed water pumps, and pump hoses. TECHINT CIMI MONTUBI
Job Title: Lead site engineer.
Project: Petrochemical Ain EL Sokhna.
December 1999 to October 2001
Location: Ain sokhna, Egypt
Category: Oil & Gas
Installation of equipment pumps.
Installation of gas compressors and static equipment.
Commissioning all auxiliary pumps.
ACADEMIC BACKGROUND
B.Sc. in Mechanical Power Engineering 6th of October University, Egypt Graduation year: 1996 Overall Grade: Good
Graduation Project: Central Air Conditioning, Industrial water chiller Project Grade: Excellent LANGUAGE SKILLS
ARABIC ENGLISH ITALY
Native Very Good Very Good
OVERALL MANAGING RESPONSIBILIES
• Managing and leading the project team.
• Recruiting project staff.
• Managing co-ordination of the partners and working groups engaged in project work.
• Detailed project planning and control budgeting.
• Developing and maintaining a detailed project plan.
• Managing project deliverables in line with the project plan.
• Recording and managing project issues and escalating where necessary.
• Resolving cross-functional issues at project level.
• Managing project scope and change control and escalating issues where necessary.
• Monitoring project progress and performance.
• Managing project training within the defined budget. Liaises with, and updates progress to management.
• Final approval of the design specification.
• Working closely with users to ensure the project meets business needs.
• Identifying user training needs and devising and managing user training programs.
• Field assistance and supervision in construction phase for equipment installation, Pre Commissioning, Turn Over, Commissioning and Start Up.
OTHER INFORMATION
Fully conversant with European and American standards Following engineering and supervisor’s instructions and typed procedures EN ASME API
AWS NACE ASNT
ISO 9001:2008 OHSAS 18001
REFERENCES
Available upon request