Post Job Free

Resume

Sign in

Project Engineering

Location:
Bhagalpur, Bihar, India
Posted:
March 19, 2020

Contact this candidate

Resume:

MOHAMMAD AURANGJEB ALAM

Mobile: +91-773*******+91-993*******+919*********

Email: adcdip@r.postjobfree.com • adcdip@r.postjobfree.com

Total Experience : 18 Years

Senior level assignments in Instrumentation/ Project Management with reputed organizations

EXECUTIVE PROFILE

•Diploma in Associate Engineering Instrument Technology with over 3 decades of wide cross cultural experience in Instrumentation, Quality Assurance, Engineering & Fabrication and Project Management.

•Previously worked with JGC Instrument QA/QC Inspector.

•Expertise in developing mechanical design drawings and documents with proven abilities in drawing systems.

•Proficient in swiftly ramping up projects like offshore platforms & process modules with competent cross-functional skills. Sound knowledge of codes, standards and regulatory guidelines that apply to design disciplines.

•In-depth knowledge of Piping, equipment and frameworks.

Core Competencies:

Strategic Planning ● Project Management ● Quality Assurance ● Instrumentation & Automation ● P & ID Redlining ● Clash Checking ● Techno-Commercial Operations ● Budgeting & Pricing

KEY DELIVERABLES

•Ensuring proper implementation of ISO 9001 and conducting pre loop inspection.

•Conducting QC inspection for instrument / system as per as per inspection and test plan project specification and preparation of QR forms (instrument installation inspection).

•Handling all activities during the construction a commissioning, test, meggering, of power and control cable and measuring earth resistance test.

•Installing and testing as per project quality procedure and project specification & preparation of Jo13 forms for instrument installation inspection.

•Coordinating with BGP in pressure testing of impulse line and preparation of JO10 forms pressure test.

•Ensuring that that all inspection and testing records properly documented and made available for handover to the client, on completion in accordance with construction requirement.

•Reviewing the design and construction related document, conducting material inspection.

•Preparing quality control check sheets for each equipments unit installed including tray work, conduit wiring, termination, impulse tubing, and panel board and ensure that that confirm to required specification.

•Generating piping material, piping components, mechanical valves, piping special items specifications.

•Reviewing the drawings and preparing isometrics by designers and drawers.

•Understanding and implementing the lessons learnt from past projects and on-going projects.

•Selecting the pressure rating and class based on system pressure and temperature ratings.

•Preparing paper specifications and data sheets for valves along with making technical evaluation of offers from vendors and suppliers for piping class components.

•Generating piping material, piping components, mechanical valves, piping special items specifications.

•Providing input of material classes into procurement databases.

•Witnessing, reviewing and approving the PQR / Welding Procedure Specification.

•Witnessing the Welder’s Qualification as per approved WPS and conducting visual Inspection of welds, NDT Inspections, Monitor Overall Quality of the work carried out, Maintaining Material traceability, Dimensional Checks, Fit up/ Tolerance Checks and all other activities concerning the Quality Control.

•Reviewing the vendor documents like ITPs, Inspection/ Test procedures, Valve test certificates and MTCs.

•Conducting material inspection as per codes, standards and project specification.

CAREER CONTOUR

Feb’18 – Feb’19 with MCSC as Instrument QA/QC Inspector

Project: CGP Phashe-3 & SITRA Project

Main Contractor: JGC

Client: BANAGAS

•Unpacking inspection of instrument at warehouse and preparing material receiving inspection reports. Issuance of NCR for discrepancies as per samss.

•Preparing bench-testing record of primary elements, transmitters, control valves, on-off valves and local indicators prior to installation.

•Conducting cable termination and testing records for hi–potential testing, megger testing and continuity testing.

•Reviewing and studying the approved Purchas order and requisition order of vendor's supplier intended for establishing level of inspection and coordinating with vendors for the scope of inspection and proper notification.

•Performing pre-inspection meeting for vendor supplier which requirement for level 1 and 2 inspection.

•Installing cable trays and conduit in classified and non- classified areas as per SAES, ANSI, NEMA and NEC.

•Witnessing the leak testing of instrument tubing and installation of filed instruments.

•Preparing calibration records of all types of skid mounted instruments. (Pressure, level, flow, temperature & vibration)

•Preparing instrument loop packages and record the various.

CAREER CONTOUR

June’16 – Oct’17 with Samsumg Engineering as E &I QA/QC Inspector

Project: West Qurna Phashe-2 Project

Contractor: Samsumg Engineering

Client: LUKOIL

Project Details: Hydro Carbon, Central Process Facility (400 000 BOPD)

Accountabilities

Unpacking inspection of instrument at warehouse and preparing material receiving inspection reports. Issuance of NCR for discrepancies as per samss.

Preparing bench-testing record of primary elements, transmitters, control valves, on-off valves and local indicators prior to installation.

Conducting cable termination and testing records for hi–potential testing, megger testing and continuity testing.

Reviewing and studying the approved Purchas order and requisition order of vendor's supplier intended for establishing level of inspection and coordinating with vendors for the scope of inspection and proper notification.

Performing pre-inspection meeting for vendor supplier which requirement for level 1 and 2 inspection.

Installing cable trays and conduit in classified and non- classified areas as per SAES, ANSI, NEMA and NEC.

Witnessing the leak testing of instrument tubing and installation of filed instruments.

Preparing calibration records of all types of skid mounted instruments. (Pressure, level, flow, temperature & vibration)

Preparing instrument loop packages and record the various.

Sep’13 – Apr’16 with Lukoil Middle East as E &I QA/QC Inspector

Project: West Qurna Phashe-2 Project

TPI Contractor: Bureau Veritas

Client: LUKOIL

Project Details: Hydro Carbon, Central Process Facility (400 000 BOPD)

Accountabilities

•Verifying AFI submitted by the contractor, work to be inspected is complete and in compliance with the Engineering Standard & Material and conforming to all applicable requirements standard.

•Reviewing all project documents such as approved construction drawings, specification, applicable codes and standard including those of sub-contractors works in accordance with approved QCP/ITPs procedures, method statements and other contract documents for site implementation.

•Verifying and reviewing the approved construction drawings covering ISS, P&ID, ILD, SLD, Location Drawing, Hook-Up Drawing, Typical installation Drawing and Wiring Details before submitted to client QC unit for final inspection.

•Conducting bench and field calibration inspection Foundation Field Bus and Hart Instruments like Transmitters (Pressure, Flow, Level, and Temperature), switches, indicators, gauges, Control Valves, ON/OFF Valves, SOV, MOV, I/P converter including dimensional check of orifice plate.

•Maintaining records of calibration, inspection and testing equipment.

•Reviewing and updating Quality Control Procedures (QCP) and Inspection & Test Plan (ITP) for Instrumentation, F&G & Communication related activities submitted by the Sub-Contractor, according to the Project standard specification.

•Performing Loop checking for Witness, Preparation & Review of loop folder, for close the loop folder.

Jan’12 – Aug’13 with Manifa Core Haydrocarban Project as Instrument Supervisor

Main Contractor: Snamprogetti

Client: Aramco

Accountabilities

•Unpacking inspection of instrument at warehouse and preparing material receiving inspection reports. Issuance of NCR for discrepancies as per samss.

•Preparing bench-testing record of primary elements, transmitters, control valves, on-off valves and local indicators prior to installation.

•Conducting cable termination and testing records for hi–potential testing, megger testing and continuity testing.

•Reviewing and studying the approved Purchas order and requisition order of vendor's supplier intended for establishing level of inspection and coordinating with vendors for the scope of inspection and proper notification.

•Performing pre-inspection meeting for vendor supplier which requirement for level 1 and 2 inspection.

•Installing cable trays and conduit in classified and non- classified areas as per SAES, ANSI, NEMA and NEC.

•Witnessing the leak testing of instrument tubing and installation of filed instruments.

•Preparing calibration records of all types of skid mounted instruments. (Pressure, level, flow, temperature & vibration)

•Preparing instrument loop packages and record the various.

May’09 – Dec’11 with Steel Authority of India Limited as Instrument QA/QC Inspector

Main Contractor: Petron Ltd.

Client: Bokaro Steel Plant Bokaro

Accountabilities

•Conducting inspection for all activities during the construction and commissioning and final document to hand over of company.

•Performing instrumentation all type of transmitters Calibration and loop checking.

•Conducting Fire alarm and Gas detector Calibration and loop checking and MOV, PSV, Control Valve and ON-OFF valve Calibration and loop checking.

•Liaising with ABB vendor for switchgear testing and controller setting.

•Making scheme checks for 132KV, 33KV Outdoor Switchyards & 11KV, 6.6KV, 0.4KV Indoor Switchboards with Interlocks.

•Making the RFI or AFI submission & inspection of calibration and calibration arrangements.

•Executing material receiving inspection as per project MSDS requirements, specification and standards.

Feb’08 – Dec’08 with Consolidated Contractor International Company Ltd. as Instrument QA/QC Inspector

Project: Rabigh Olifin Plant Project

Main Contractor: JGC Arabia Ltd.

Client: Petro Rabigh

Accountabilities

•Conducting daily inspection and surveillance for ongoing construction activities.

•Coordinating with construction and raising RFI for inspection with client.

•Carrying out inspection of main and branch cable tray, conduit, instrument installation glanding and terminating primary & secondary cable marring & continuity, impulse line, air line installation & pressure test, junction box panel.

•Ensuring all instruments were installed and tested as per project quality.

•Coordinating with construction personal about ongoing inspection issues and ensuring implementation of ISO 9001.

Aug’05 – Oct’07 with Qatar Kentz as Instrument QA/QC Inspector

Project: Ras Gas LNG Project

Main Contractor: Technip

Client: Rasgas

Accountabilities

•Conducting inspection and test plan, preparation ITP&QCP receiving of RFI for daily.

•Performing the inspection for all area, entering RFI in log book and system.

•Preparing check sheet in time forward to signature for company. Monitoring and Coordinating with win DCS for closing ITP.

•Formulating the status report for management meeting, RFI/ITP closing out status report preparation.

•Updating and submitting main and branch cable trays, conduit, Instrument installation, glanding and termination of primary &secondary cable continuity, meggering test of secondary primary cable, impulse line, air line Installation and pressure test junction box, panel installation and all type of instrument calibration loop folder inspection.

•Ensuring all instruments were installed& tested as per project quality procedure, and project specification, preparation of ITP forms and punch list clearing.

•Co0nductig the inspection for all activities during the construction and commissioning and final document to hand over of company.

Feb’04 – May’05 with Qatar Kentz as Instrument QA/QC Inspector

Project: Qatar Petrochemical Projet

Main Contractor: Technip

Client: QAPCO

Accountabilities

•Monitoring daily discipline activities and verifies compliance to project procedures, specifications and standards.

•Identifying quality problems, reject non-conforming items and initiate, recommending/ providing solutions to the problems with customer sanction/ approvals through designated channels.

•Controlling further processing of non-conforming items, deficiencies or unsatisfactory conditions until rectification and any remedial action is approved.

•Conducting random surveillance on operator's qualifications, tools and equipment, working practices as well as storage and preservations.

•Preparing daily inspection documents and final acceptance documents prior to project completion.

•Maintaining close working relationship with the construction personnel.

•Preparing Instrument Calibration Method of Statement & As Per Approved Project Drawings as per International & BS, Qatar Gas Project Standards, Specifications,

•Inspecting and witnessing Instrument Cable Duct Bank, Cable Pulling from RIB to J.B &Control Room and RGS conduit, Stanchion of instrument devices, Marshaling Panel, Junction Boxes installation, Mounting of instrument devices such as pressure, level, temperature transmitter, RTD and thermocouple, pressure, Level, Flow and temperature switch & Control valves.

Jul’02 - Nov’03 with Qatar Kentz as Instrument QA/QC Inspector

Project: Qatar Ferfilizer Project

Main Contractor: Krupp Uhde

Accountabilities

•Performing the calibration of all type process instrumentation, installation, tubing (pneumatic and process hookup), cable tray, Instrument Installation Cable testing, laying, glanding and termination, function test, loop checking, Instrument and system, fault finding and trouble shooting of process Instrumentation during commissioning period.

•Making final preparation of various drawings such as P&ID, Logic Drawing, Wiring diagram & Instrument loop diagram.

Feb’01 – Apr’02 with Mecon as Instrument QA/QC Inspector

Project: Qatar Chemical Project

Client: Brown Root

Accountabilities

•Conducting the inspection and test plan, preparation ITP&QCP receiving of RFI for daily.

•Updating and submitting main and branch cable trays, conduit, Instrument installation, glanding and termination of primary &secondary cable continuity, meggering test of secondary primary cable, impulse line, air line Installation and pressure test junction box.

•Preparing status report for management meeting, RFI/ITP closing out status report preparation.

•Inspecting all activities during the construction and commissioning and final document to hand over of company.

Aug’99 – Dec’00 with NPCC as Instrument QA/QC Inspector

Project: Habshan Refinery Project, Abu Dhabi

Main Contractor: Technip

Accountabilities

•Performing calibration of all type process instrumentation, installation, tubing (pneumatic and process hookup), cable tray, Instrument Installation Cable testing, laying, glanding and termination, function test, loop checking, Instrument and system, fault finding and trouble shooting of process Instrumentation during commissioning period.

•Making final preparation of various drawings such as P&ID, Logic Drawing, Wiring diagram & Instrument loop diagram.

Commenced career at Esjey Engineering as Instrument QA/QC Inspector (On Haldia Refinery Project for BECHTEL) during Feb’97 – Mar’99

ACADEMIC CREDENTIALS

Diploma in Associate Engineering Instrument Technology from AL-KABIR POLYTECHNIC JAMSHEDPUR 1995

TECHNICAL SKILLS

MS Office (Word, Excel & PowerPoint), MS DOS and Internet

PERSONAL DOSSIER

Date of Birth: 15th April 1976

Permanent Address: S/o Mohammad Alam, At + Post Adsar, District + Via – Jamui, PIN -811307, Bihar

Linguistic Abilities: English, Hindi, Urdu and Arabic

Passport Details: T- 1004083 (Valid till: 30.07.2029)



Contact this candidate