Civil Engineer
Ahmed Moh. Gadalla
adcd72@r.postjobfree.com
Tel : +201*********
Cairo, Egypt
Personal Profile :
NINETEEN years of solid experience in different Construction and Civil ● More than
Engineering Works with records of success in managing site works, projects studies and supervising, technical office and computer works .
High communication skills with core knowledge of dealing with different cultures as a result of working in ● two different countries with more than ten nationalities . Strong management & leadership skills coming from handling miscellaneous responsibilities in different ● projects .
Ambitious, dynamic & hard worker . ●
Professional Experience :
Square Engineering Firm ( Egypt ) (July
Present ) 2019ـ
PositionMO held : Project Manager @ (Construction of 89 villas @ CELIA Compound TALLAT STAFA GROUP @ The New Capital) 200 Millions .
Duties :
•goals Manage the daily activities and my staff to mentain the company . Check the productivity rate, time schedual and manage if any deviation occurred . ● Check the montary issues and cost in order to maximize the profits and decrease the costs . ● Manage the material, staff, equipements delivering schedual and the site's daily needs . ● Manage the non confirmty cases to rectify the cases . ● Manage the documentation of the project . ●
Attend the required meetings with all parties in order to facilitate the progress and to solve all issues . ● Arrange, Manage the qualified subcontractors to execute the activities as per the owner requirements . ● Freelancer (Egypt) (January
June 2019 ) 2019ـ
2Multi Stories Buildings in New Cairo .
Al - Fahd Company Trading Industried & Contracting (K.S.A) (July Nov. 2018 ) 2018ـ
Position held : Project Manager @ (Construction of New Switching Station 380kv # 9041 - Riyadh) . Duties :
•goals Manage the daily activities and my staff to mentain the company . Check the productivity rate, time schedual and manage if any deviation occurred . ● Check the montary issues and cost in order to maximize the profits and decrease the costs . ● Ma nage the material delivering schedual and the site's daily needs ● Manage the non confirmty cases in the site to meet the owner requirements . ● Manage the documentation of the project . ●
Attendissues the required meetings with all parties in order to facilitate the pr ogress and to solve all . ● Mobco Civil Construction Group ( K . S . A ) (May
July 2018 ) 2017ـ
Position held : QA/QC Area Manager @ (27 projects) Duties :
•plan Advise, guide and support managers in the implementation of the Quality
• Ensure that the Contractors, Sub - contractors, and other members of the project team observer Quality Assurance guidelines, and report violations of procedures
• E stablish a document coding structure for all documents as required
• Audit documentation to ensure adherence to guidelines and procedures
•improved Review documentation and provide feedback on how documentation could be
• Provideimproved recommendation how the pr ocesses, procedures and flow charts could be
•implemented follow up of NCRs and monitor the corrective actions are proposed/approved and .
•logs Prepare and maintain relevant QA / QC
•reports Prepare applicable QA / QC
• Carry out analysis on le ssons learned
•necessary Manage and monitor QA / QC Auditors as
Projects of :
Bus' Stations Depot – 2 Stations . ●
Hilton hotel – Al -Cityriyadh . ●
Prince Mohammed Palace - Al -Cityriyadh . ●
18 Schooles MOE (TBC) – Alriyadh City . ●
Taif Municipality Tower – TaiCity f . ●
Bank Albelad Main Office (finishing works) – Alryadih City . ● 1 Strip Mall – Damam Area . ●
1 Tower – Makkah Almokarama . ●
1 Tower – Jeddah City . ●
Engineering Consultants Group ECG (K.S.A) (May
May 2017 ) 2016 ــ
*Green Oasis Project ( 860 Villas, 50 Multi - Stories Buildings and 4 Strip Malls ) @ AL - Ryadih Position held : Resident Engineer for Strip Malls
Duties :
Provide the transition from design through to construction phase . ● Manage a team of different disciplines . ●
Regularly reporting pre - and post - construction works progress and status to the Manager, raising of issues and ● concerns .
CoordinatesContractors the actions performed on site between the . ● Adhere to the applicable legislation and statutory requirements, as well as any customer specific requirements . ● Ensure the appropriate standards, processes, procedures, specifications and work instructions are a pplied throughout the ● project life cycle and that appropriate, accurate and complete records are safely maintained . Checking that all plants, tools, materials and equipments are safe for use and are appropriately used is currently ● certifiedkept and that site records are .
Identifying and reporting any potential or actual project scope change . ● Coordinates, along with the site managers, under the consolidation of the HSE Manager, the application of the required ● protection and safety measures .
Providecontractors advi ce and expertise on construction matters to the Client and the . ● Cooperate with the Project Manager for effective resolution and process improvement of non -processconformance . ● Take necessary steps for preventing / issuing and following up the close out works of the Non Conformance Reports . ● Performs other responsibilities associated with this position as may be appropriate . ● Position held :multi Senior Structural Engineer (860 Villas and 50 - stories buildings ) Duties :
Reviewproject and approve the s tructural shope drawings for the . ● Review and approve the method statements . ●
Follow up all civil engineers and evaluate them performance . ● Performs site inspections . ●
Follow up the materials, supplairs, patch plates prequalifications and approvals . ● Provides the solution for the related problems . ● Makes the necessary coordination with the different disciplines . ● Saudi Oger LTD. Co. (K.S.A) (April
July 2016 ) 2009 ــ
*K.A.P - 1 ( King Abduallah Development Project – 1 ) 18 Sites (0.8 billion SR) @ Makkah and AL - Taiif Area
Position held : QA/QC Senior Engineer
Duties :
Makes all reports weekly and monthly . ●
Follow up All QA/QC engineers work and them performance . ● Check All documents status, issues and the project files . ● Coordinate with the consultant / owner to solve and mange all problems . ● Check implementation according to all PQP requirments . ● Ensure th at the Project Quality Plan, standards and codes are Maintained at all stages of the project . ● Ensure that all Materials/Equipment’s fabricated on - site are inspected for Contract requirements and are ● properly stored .
Document control, material control and sub - contractor control . ● Preparation of QC plan and method statement . ●
Random visits to sites, concrete factories, suppliers and labs . ● Review Sub - Contractors Quality Policy, Manual, Procedures and ITP . ● Provides all technical solution and supports for the si tes staff and subcontractors . ●
* Jabal Omar Development Project (1100000 m2 - High rise bldgs more than 30 floors ) @ Makkah AL - Mukaramah
PositionEngineer held : QA/QC
Duties :
Performs daily inspections for the ongoing Civil & Architectural works . ● Prepares the Requests for Inspections (RFI), reporting for all Civil & Architectural daily checks . ● Control of Nonconforming product and taking action to eliminate the detected Nonconformity . ● Determine the causes of Nonconformity and reviewing Corrective ac tion taken . ● Checks, at the end of each phase, the implementation of Civil and Architectural work performed, compares ● the contractual agreements, and report work progress to supervisor . Prepares the "M Zero" form to notify about QA/QC comments, and raises t hese comments to the assigned ● subcontractors .
Coordinates between Consultant, Site management and Subcontractors for solving all quality assurance ● onsite problems .
Reports major discrepancies and summary of QA/QC Civil & Architectural work performed to sup ervisor ● for further action .
Alqussi International Co. (K.S.A) (Mar
2005 – Oct 2008 )
Contracting Projects Dept . . 1
Position held: Project Manager / Private Projects Manager Duties :
Full responsibilities and supervision for contracting Dep. construction projects : General studies for 4 several governmental tenders . ● General studies and construction works for the following projects : ● Construction of Half moon Resort (70000 m2) @ AL -Khobar. o Construction of Central Kitchen For Dan Kin Donats (4500 m2) @ AL -Ryadih. o Construction of Olaya Tower (10000 m2) @ AL -Ryadih. o Construction of Commercial Store @ AL -Jobail. o
Construction of 23 Commercial Shops @ Safwa . o
ConstructionJeddah of The Company Compound for 1000 Persons @ . o Sites investigation and determination of works needed o Estimating costs and all monetary requirements o
Checking performance and quality of sites ’ works o Monitoring projects schedules and correcting any deviations . o King Abd ulaziz University Housing Project, Jeddah . 2 Position held: Site Engineer / Project Manger
Full responsibilities for supervision of the following : Maintenanceworks and replacement of all damage d \ fittings for 106 buildings, and 50 villas o Masonary, flooring, ceiling, plastering, painting, carpentry, gypsum, Aluminium, sanitary & electrical o works .
Engineering Section – Egyptian Armed Forces
Al - ismaelia, Egypt (June
2003 - Oct 2004 )
Position held: Project manager
Duties :
Construction of Military Concrete Buildings : . 1
- Construction3m of 14 units (work includes: 20000 m excavation works, 4000 3 soil replacement, 3000 m 3 patching works, 1500 m 3 plain concrete works, and 2000 m 3 reinforced concrete), also general preparation works, andworks le veling .
* The work had been done in half period
Reclamation of 400 Feddans (1700000m2) and Construction of it’s Superstructures : . 2
- Construction of all the farm superstructures ( Buildings, fences,and farm's main gates ) work includes genera l reinforced concrete works,and general finishing works .
- Construction of internal roads network ( total roads length about 25 Km ) .
- Soil reclamation works, works includes general land survey works, earth works using heavy equipments ( B ulldozers, Loaders, Graders, Compactors etc ). Egyptic for Contracting Co .
Cairo, Egypt (Sep
2001 - Nov 2004 )
Position held: Site Engineer
Duties :
PROJECT: CONSTRUCTION OF TWO SOLDIERS HOUSING BUILDINGS AND TWO SPORTIVE HALLS : ST
1
- Work includes: excavation works, soil replacement, plain concrete, reinforced concret,and general finishing works .
PROJECT: CONSTRUCTION AND REPAIRING OF 15 RELIGIOUS INSTITUTES"ALAZHAR ND
2
ALSHAREEF " :
Work includes :
Destruction the old buildings and construct the new buildings . o Repairing works for the skleton ( footings, columns, beams, and slabs ) o Finishing works ( painting, plumbing, carpentry, masonry and false ceiling works ) . o Education :
Qualification: Bachelor Of Civil Engineering, Zagazig University ( Year of 2001 ) . ● Graduation Project: DesignGrade of Reinforced Concrete Structures (Project : Excellent ) . ● Graduation Grade : good . ●
Computer Skills :
Autocad and Sap 2000 . ●
Microsoft Word and Excel . ●
Languages :
Arabic: Mother Tongue . ●
English: Very good . ●
Personal Data :
Nationality: Egyptian . ●
Date of Birth: 25 Feb 1979 . ●
MilitaryCompleted service: . ●
Marital Status: Married . ●
Driving Status: Very good + (Egypt, KSA) driving license ● Memberships :
Egyptian Engineers Syndicate . ●
Saudi Council of Engineers . ●