Resume

Sign in

Engineer Engineering

Location:
Medan, North Sumatra Province, Indonesia
Salary:
90000000
Posted:
March 21, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONAL DETAILS

Name

Sex

Religion

Nationality

Marital Status

Residential Address

Telephone

Email

: Suryantoro, ST

: Laki-Laki

: Islam

: Indonesia

: Married

: Mutihan RT 05/05 Wates Kulonprogo Yogyaka ta

55611

: 081*********

: adcd2u@r.postjobfree.com

Suryo has more than 25 years of experience In various Oil, Gas and Petrochemical projects in Indonesia especially on engineering, construction and commissioning department. JOB EXPERIENCE

• 1 JANUARY 2019- UNTIL Now

ti EMPLOYER: CHEVRON PASIFIC INDONESIA - SECONDEO

Hred by PT. SMBR (EPCM - Singgar Mulia - Kelog Brov.n) ti POSITION HELD & DESCRIPTION OF DlJTIES: FACILITY REPRESENTATIVE Construction Engineer for COMPREH:NSIVE PIPELINE MANTENANCE (CPM-EPCM) Project Provision of all area Cevron Tbk project - Rlau Area.

The project is to develop offtake station of Hydrocarbon (HCT) facilities, particular assembly and instalation of piping, pipeline lJility System (Air Compressor, Diesel Engine Generator, Utility Water/Water Treathment. Air Conditioning and Fire Water System), the gas filter, gas chromatograph, Moisture Analyzer, H2

S Analyzer and HCDP Analyzer and Metering and

regulating System (MR/S) measured by ultrasonic meters (USM). Job responslbllltyiDutles:

• To run the day-to-day operations on the construction site and control the short-therm schedule, important safety, quality control and contractor coordination responsibilities

• Ass 1st in the de-.elopment and maintenance of preconstruclion, construction, and closeout execution plans

• Assist in relAewing project drav.iing and specification to gaina full undesstanding of project scope, client goals and expectations, and resource requuirements fol' each phase of the project

• Identity construction approaches and risk to ensure efficiency and mitigate exposure

• Assist in soliciting and coordinating constractor fol' labor, material and equipment

• Ass it In the dewlopment and maintenance of project schedules, durations, and sequencing logic

• Owrsee the acli\Alies and performance of constractors to ensure compliance with quality requirements

• Manage client interaction and promote positive relationships

• Coordinate with Manager Engineering to do facility representative Chevron jobs

• Monitor project progress to ensure compliance with financial, operational, and/Of scheduling requirements

• Move quickly to ensure the achievement of the essentials of HCT, Field Oil, Utlllty, piping and Pipeline project.

• 2017 AUG - 31 DESEMBER 2018

ti EMPLOYER: PT. Pgn Solution - EPC (Engineering Procurement & Construction) Project. ti POSITION I-ELD & DESCRIPTION OF DUTIES: Construction Engineer ti RESPONSIBUTIES:

Construction Engineer for Provision of Dumai Receiving Facilities Offtake Station (ORF) part of PJDD at Dumai for PGN Tbk project.

The project is to develop offtake station of natural gas facilities, particular assembly and instalation of piping, pipeline utility System (Air Compressor, Diesel Engine Generator, utility Water/Water Treathrnent, Air Conditioning and Fire Water System), the gas filter, gas chromatograph, Moisture Analyzer, H2S Analyzer and HCDP Analyzer and Metering and regulating System

(MR/S) measured by ultrasonic meters (USM).

Job responslbllltytDutles:

Preparing Bid Document

Bid Evaluation.

Detail Engineering Design (OED)

Mechanical Engineering documents (Specifications, Calculation, Data Sheets, Procedures, and Drawings) review for DRF

• Coordinate with Manager Engineering to do its job.

• Move quickly to ensure the achievement of the essentials of Mt'S, Utility, piping and Pipeline project.

Material Analysis

Piping/Pipeline document for Hydro Test

Supervisi at field/site

Mechanical Completion

Pre Commisioning Start Up Commissioning, PSSR

Commissioning

• 2016 0KT - 2017 AUG

ti EMPLOYER: PT. PGN Solution -EPC (Engineering Procurement & Construction) Project. ti POSITION I-ELD & DESCRIPTION OF DUTIES: Construction Engineer-Field ti RESPONSIBUTIES:

Construction Engineer for Provision of Proyek Pelaksanaan Pekerjaan Pengembangan Jaringan Daerah Duri • Dumai (PJDD) for PGN Tbk project.

The project is to develop the transmission and distribution of natural gas facilities Including develop metering station an Integrated pipeline lnsfrastructure in order to increase the utilization of natural gas, gathering 24" pipeline 60 Km from the Grisslk - Duri Pipeline to ORF and sales gas pipeline from the DRF to Natural Gas Distribution Line Facilities in Riau Province and Oumal City,

Job responalbllltytDutles:

Site supervision and Inspection with respect to drawing. Coordinate with site surveyors and contruction departemenl Coordinate for various engineering issues.

■ Assist the work and all the activities related to the field engineer, prepare a Field Change Notice design changes that occur in the field.

Move quickly to ensure the achievement of the essentials of Mt'S, piping and Pipeline project.

Conceptual of Engineering Work.

HAZOP, HAZID Engineering

Precommisioning

Start Up Commissioning

Commissioning

• 2015 0KT -2016 AUG

ti EMPLOYER: PT. PGN Solution-EPC (Engineering Procurement & Construction) Project ti POSITION I-ELD & DESCRIPTION OF DUTIES: Construction Engineer - Field ti RESPONSIBLITIES:

Construction Engineer for Provision of Contract Package No. 9 Paket Penyediaan Penyaluran Gas Muara Karang - Muara Bekasi (PPGMM).

The project is to develop metering station an integrated 200 MMSCFD 24" distribution pipeline 45 Km from the Muara Bekasi - Muara Karang Jakarta utara including tie-in and metering station at Indonesia Power Jakarta.

Job responsibilltytDutles:

Site supervision and inspection with respect to drawing. Coordinate with site surveyors and engineering departement. Coordinate for various engineering issues.

• Assist the work and all the activities related to the field engineer, prepare a Field Change Notice design changes that occur in the field.

• Coordinate with Project Manager to do its job.

Move quickly to ensure the achievement of the essentials of MVS, piping and Pipeline project.

Conceptual of Engineering Work.

Step Process of Engineering Work.

HAZOP, HAZID Engineering

Precommisioning

Start Up Commissioning

Commissioning

• 2013- 2015

ti' EMPLOYER: PT. PGN Solution - Project Management Consultan (PMC) t/ POSrTION I-ELD & DESCRIPTION OF DUTIES: Engineering Coordinator of Tecnical Assistance Services (T AS)

t/ RESPONSIBUTIES:

Consultant of technical assist the ov.ner in preparing the procurement of goods. Prepare Technical Bid Tender Document schedulling by baseline implementation of Investment activities budget year 2014 of PGN TBk. Prepare Anwjzing process, escorting up to technical document review Job responsibllltylDuties:

coordinating the project execution operation involving planning. to ensure the achievement of basic design Piping & Pipeline Bid evaluation Tender. Lead pipeline/ piping engineer of Offtake Station and Metering (~S system) piping, Surveyor

As senior piping and pipeline engineer perform checking on various documents and drawings of offshore pipeline and piping design for ~/S plant Offtake Plant. Tender support on various bidding.

PGN Project - PMC List at 2013 - 2015 :

NO ENGll€ERII(; PROJECT IOCATION CLIENT 'ltAIIS

- I 1-Pipdine ~-- 'iii- tnsullition lnstillition •1-of pipe dii 6 -inches, --2 km n ii.ht _in . MJspion IV .Greslk Jim -· Tirrur -· -· ·· ---PGNSBUII -., ... _ Jul 2 Pipdlne Installation Manyar L;unon,an TUban umo~n · l\Jban PGNSBUII Jul· IJ J Pi pd inc lnibll~lion Milny.r f'T.MR M.lny.r · Tllb,n sur.bm -nb~n PGISBUII SCp-lJ 4 Pipdine lnsb llition Tambakmv:1h Gcdonc;in Sido.rjo dii 6 invhi., km Lmcht sidoario PGI 58\JII s«i,·13

' Pipdinelnsbllition Punl:{in:niwis Mojokerto PGISBVII OkMJ 6 Pipdine lnsullition Timbak siw.ih · Sediti dii 6 inc hi,, km Lencht MojokerlD PGN SB\JII okt·l3 1 Pip.I in• ln<talbtion Sool:o -Trowul>n Mojol .. to,h 6 inchi 61cm Ls,o,t Mojokorto PCIII SRUII Nov-I ] 8 Pipdlne lnsullition GclTl>OI • Krcnfa~ lvlojokertodii 8 inc hi, km~t Mojokerto PGISBUII Hov-13 10 y Pipdine Pipeline lnsullition tnsullition pipcPE pipel2"Komcrsii, 4 km t.erd,l 180rrm. mntik 7 kmLmct,osowilin:t Kertojoyo un Tduk M.Urronr nyir ·- Surab,Gresik yi -· PGNSBUII PGNSBVII Oe5·13 Hov·1J

- 11 i-Pipeline ww,www, lnstilbtion up slrc;im m,Pipe a,m Offtikc Scnurcdil 10", -0,-4 km · Lcncht,_, -Pn - uruin PCNSBUII .-i Jin·l4 12 Pipeline lnsu llition Down Strc;im Pipe ottulc Semlrc di. 16", I km lfflcht PllUIUln PCNSBUII J.n· l4 IJ Pipeline lnmllitlon pipcPcrtic.ii n KIG suci M.nyar dia 12 ', 10 km Lcnd\l Gres ii PGI SBUII lln· l4 14 Und m.turition Project Pressur, Rcculitin: System Tirri>.kiji Semmn: Scm,u,nc PGI SBUII ll n·14 1, Und miturition Project Offbkc smurc P3suruin PCN SBUII J.n· l4

-16 -Pipelin, --lnsb · llition pipel2". ·1-9 Im Lcncht -1 T3ndes Pink " SUrib1ya f l•lll'fl•li- PGI SBUII Mlr·l4 17 Pipeline lnsullirion pipcPE Kornersi.11 180mm Kcrtoioyo Minyir · Alteni tif surib1ya PGI SBUII Mlr·l4 19 lluffor lono und Erpn<ion Survey offt, kr K>li<oc:i 5ur,b,y, PG! SRUII -,n· l4 19 Desi en Pipinc MR/5 NGORO 1ndu1trics lvloj okerto PCN SBUII .k!l·l4 20 Desi en Pipinc MR/5 PIER Industries PlSUIUln PGISBUII Acu· l4 21 Desi en Pipinc offukc Husky CNOOK Miduu limited Pasuruin PGI SBUII Scp-14

• 2004- 2012

t/ EMPLOYER: Pt. Kobar Flare Combustion : (Epc - Ko Drum - Piping - Pipeline - And Flare System

t/ POSITION I-ELD & DESCRIPTION OF DVTIES: Construction Engineer Duties:

_ Prepare Technical Bid Tender

- Prepare Engineering Proposal

Engineering Phase in Oil Gas Project

- Supervise to improved target to design engineering and supply ko drum, Pipeline, Piping flare system and installed for oil & gas end chemical industri~s. _ Step Process of Engineering Work.

- Front End Engineering Design (FEED)

Detail Engineering Design (DED)

- Material Analysis

_ Safety First in Process Engineering

_ HAZOP, HAZID Engineering

_ Process specification & Data Sheet (OS)

- Surface Production Facility (Separator, Scrubber, KO Drum, Flare)

- Onshore and Offshore Production System

- Green Field and Brown field process engineering

- Oil & Gas Process Engineering

_ Heat & Material Balance(HMB), Process Flow Diagram (PFD) dan Piping & lnstrumentasi Diagram (P&ID)

- Oil Treatment process (general process, oil heater, desalter)

- Waste Gas Treatment process (gas dehydration, CO2 Flare, H2S Flare, Mercury flare)

- Erection and Construction.

N

0

1

2

3

4

5

6

7

8

9

10

11

12

13

1

15

16

17

18

19

20

21

22

22

23

2

25

22

26

27

Precommisioning and Start Up Commissioning

Project Experiences List AT 2007 - 2012

Project Location Client

6 un~ ko drum, pipelne, w ellest flare Salaw ati Flekl - lrlan PT. Metallindo Perkasa lgn~er, Ap ng and Plpelne jaya trlmdri

15 MMSCFD MJIIJ point ground flare, PT. Klaras Pusaka Aping and Apeline Tarrbun Area - Bekasi nternational 15 MMSCFD Bevated flare, guy wire Koneng Station - stack, Piping and Apeline. Palerrbang PT. Envico Indonesia 60 MMSCFD Bevated flare, guy wired PT. Media Karya slack, waler seal, Ploino and Ploeline LPG olant - Gres ik Sentosa Flare tip and Ignition system replacem, Pangkalan Branden - Apino and Aoeline ent Medan PT. Atrakana

14" die. X 18 meters over pressure

vent staclt Mlara Tew ar - Bekasi PT. Mlladi

3 un~ vent stack, derrick supported, PT. Media Karya 10" die. X 17 rrtr c/W water seal M.Jara Tew ar - Bekasi Sentosa 3 unit well test mobla ignler - Jarrbl,

Aplno and Apellne Jabuna • Jarrbl PT. l,dorimaaas Lastarl 12" tiara ~p and ignition system

replacement, Plpino and P,pelne Wa""u - Madan PT. Atrakana

" flare tip and lonition system Gelllm - Jarrbl PT. f'rime Petro Serv icaa 15 MMSCFD Bevated flare, guy w Ire Gunung Megang - stack Palorrbang PT. Envico Indonesia

6 unit w elltest flare lgnler, Aping and PT. Metalllndo Perkasa Apellne Madura Mandiri

PT Satya apta

Flare lanltlon System Reolacement Tarrbun Area - Bekasl Kreaslndo S.!aw ati Fleld • lrlan PT. Mellllllndo F'9rkasa

1 unit bum pit Igniter lava Mandiri

1.5 t.MSCFD Biagas enclosed ground

flare Pontianak - Kallmanllln PT. Envltech Perkaaa 2 unit bum olt IQnlter JabunQ • Jarrbl PT. lidorimagas Lestarl 1 unit flare Ignition system Cicau - Jaw a Baral Cl/. M.istb Rivemes 3" elevaled flare, sew supported, PT. Nlcma lamerta water seal Bangko - Ria u Kiamareuda

16" flare tlp and ianltion svslem Jan1li PT. A'ime Plltro Services PT. Pow er Surrber

12· Burn Rt Tlp & ianition system Banyuesln Solusindo PT Centuri Dlnanik

igniter package for drilng Boloneooro M ing

1.6 t.MSCFD Enclosed Ground Flare La g PT Bio energy Indonesia Direct Ignition system KF-O~270 &

Flare Tlp KF•lf'.8, Aping and Apellne Bekasl PTYudistlra Energy s• Air assisted flare 6 m height Merak - Banten Cl/. laspro Flare Ignition system. ~Ing and Cl/. Cahaya Agung

Pipeline Cenara-Clrebon Mandii

Flare lonltlon svstem Sorolanoun - Jarrbl PT Kerss Dave Utame 1.6 MMSCFD Enclosed Ground Flare L81l1>1J119 PT Bio energy Indonesia 8" Flare Tlp & Ignition System l'bndok Tengah -

KF-O~270 Bekasi CV. M.os li<a Riv a mas

4" flare tip and ignition system Gelam- Jambl PT. f\ilroflexx Owner Year

s

JOB Pertanina -

Pvlrochna Salaw au 2004

PT Pertarrina EP, Faciity

Tarrbun Be kas I 2005

PT MedcoE.&PKoneng

Palerrbang 2006

Pertamina PI-E WWO,

Gresik 2007

Pertamina EP, Pangkalan

Branden 2007

PT PJB-FLN

t.\Jarataw ar 2008

PT PJB - PLN 11,\Jara

tawar 2008

PetroOlina International

Jabuna, Ltd 2008

Pertamina EP, Stasi.Jn

Pengukur Gas SP- X

Wa""u 2008

PT. f'rlme F'etro

Services 2008

PT MedcoE.&P Gunung

Magang Palenilang 2009

Pertamina PHE WWO,

Greslk 2009

PT Pertamlna EP, Facllty

Tarrbun Bekasl 2009

JOB F'9rtamna •

Petrochlna Salaw ati 2009

Monsanto ndonaaia

2009

PetroOlina International

Jabung, Ltd 2009

Pertemina Untt IV,

Balongan 2009

Chevron, Benko Fleld

2010

PT, A'lma Altro

Services 2010

2010

EXXONMobll 2010

Indonesia

PT Bio energy Indonesia 2010

PT Pertamlna EP, Faclity

Tarrbun Bekasl 2010

BASF 2010

Pllrtamina Unit W,

Balongan 2011

Chevron 2011

PT Bio enargy lndones la 2010

PT Pertarrina EP, Faciity

T arrbun Be kas i 2011

PetroOlina International

Jabung, Ltd 2011

Flare System Package Supat. PIJyuh, &

-

28 Rebon Jaro Grissik PT. Yusonda 2012

PT P8rtamlna EP, FaclHy

29 Open Ground Flare, Piping and Pipeline Tant>un Area - Bekasi PT. Trinergi M.lgi ~ndiri Taml>un Bekasi 2012 30 Bk>nas Flare6M Paleml>ano Pa~ro - Zebra Monsanto ndonesla 2012 28 Enclosed ground flare greslk- jatlm Kodeco - 2013 14" elevated fll!re, guy wired Kondur Petroleum

29 supported, c/w waler seal Riau Kondur Petroleum 2013 Seml>alwng - PT. Raga Perkasa

31 -

Produce Water Evavorizer Sirrenggaris El<aguna 2013

• 2002- 2004

• CV. General "PLC" Service (www.gps-jogja.com)

as Chief off Mechanical/CONSTRUCTION Engineer

Duties:

• Coordinate/Support with all Maintenance to installed, maintained and repaired of Equipment, Utility & Building or process plant in any industry

• Flow Diagram & Instrumentation

• Codes & Specification

• Mechanical Equipment Drawing

• Making Equipment Layout

• Project Arrangement Drawing, Section & Elevation

• Standard Drawing Details

• Project System

Project List :

- Designed of digital scale. Merck "Duto", specification of 10 ton weight.

- Preparing/making industrial autoimmunization by Microcontroller AT89C and PLC in PG MADUBARU Yogyakarta as sugar mill industries of entire/all middle java and east java.

- Coordinated with PT United Tractor Guide the Engineering in making of prototype Hand Tractor Machine with the specification of Full Gear.

- As Design Engineer and head project I Project Leader contract the job of PT of Gamma Engineering Yogyakarta by PT. GALANG SARANA DWfTAMA Bandung in the form of work agreement of equal levying of goods and service in the form of• Short Lead Machinery And Tools Group" as order of PT KAI of Balaiyasa Lempuyangan, Yogyakarta, Indonesia, consisted of the : 1. Rotating Fixture for Engine Block.

2. Rotating Fixture for Play The Generator

3. Rotating Fixture for Irrigate the Compressor.

- Installed, maintained and repaired this machine.

• 1997-1999

t/1 PT Mulla Keramlk lndah Raya

t/1 As Supervisor Design Workshop Engineering,, Bekasl, Duties:

• Coordinate/Support with all Maintenance Division to installed, maintained and repaired of Equipment, Utility & Building of Ceramic process plant (Press Machine, Glass Application Machine, Packaging Machine, Compressor, Blower, Cooling water, Gas LPG in Kiln Machine, Oxygen, /IJr handling, Structure Building)

• 1996-1997 PT Milla Keramlk lndah Raya, Bekasi

as Drafter Workshop Engineering

Duties:

• Review Flow Diagram & Instrumentation Gas Burning for Kiln Flare Machine.

• PIPING DRAFTNG

• Overview of Pipe Drafting & Design

• Basic Autocad

• Pipe Components

o Steel Pipe

o Pipe Fitting

o Flange

o Valve

• Flow Diagram & Instrumentation

• Codes & Specification

• Mechanical Equipment Drawing

• Making Equipment Layout

• Pipe Arrangement Drawing, Section & Elevation

• Standard Piping Details

• Piping System

• Piping Jsorretri:s Drawing

• Codes & Specification

• Mechanical Equipment Drawing

• Making Equipment Layout

• Pipe Arrangement Drawing, Section & Elevation

• Standard Piping Details

• Piping System

• Piping Isometrics Drawing

• Prepared Drawing of all spare part ceramic machines.

• Make simple machine to support production or maintenance division.

• 1995 -1996

ttl PT M.llia Keramik lndah Raya, Bekasi, as Technician Maintenance Dlvl.alon Duties:

• Keep/prepare equipment and maintenance continuously ceramic machine

(body preparation machine, press machine, gas kiln machine and automatic packaging machine).

• 1993 -1994 GAMA COLLECTION As a Mathematical Tentor. EDUCATIONAL BACKGROUND:

FORMAL:

I 1977 -1983

• 1983 -1986

I 2086 -1989

• 1989 -1992

• 1999 - 2002

NON FORMAL f

SON Negerl 4 IKIP, Wates Kulonprogo Yogyakarta

SMP Negerl 1 Wates, Wates Kulonprogo Yogyakarta

SMANegerl 1 Wates, Wates Kulonprogo Yogyakarta

D Ill Teknik Masin Unlversltas Gadjah Mada, Bulaksumur Yogyakarta

S1 Teknik Masin Unlversltas Gadjah Mada, Bulaksumur Yogyakarta

• 1984 Kursus Patroli Keamanan Sekolah

• 1985 Kursus Mcrosoft Word- Excell Broadway

Computer, Wates Kulonprogo

• 1997 Kursus Bahasa lngris Conversation Borobudur Education Course, Cikarang Bekasi.

• 1997 lso 9002 In Recognition Of Complettion

Of A Training Session In lso 9002 Quality Awareness And Work Of Instruction Of In Engineering Workshop, Pt. M.llia rndustrindo Jakarta. In The Form Of :

- Quality Management System lso 9002.

- Operating Procedure Engineering Standard

- Part Regeneration

- Welding Structure.

• 1999 Supervisory Interpersonal Skill Training In M.llia lndustrindo

(Certificate: 317/Tod-TsisMi/99)

21 Juny-02 July 1999

In The Form Of:

- Way Of Facing Employees Which Have Low Achievement.

- Appreciation To Employees Which Have N:>ove Average Achievement.

• 2000

• 2004

• 2006

Engineering Ugm.

- Studying Habit- Bad Employee's Habit.

- Submitting Change To Employees.

- Orient For New Employees In Your Environment.

- Conversing Possibility Of Discipline Action With Employees.

- Assessment From Result Work.

- Way Of Submitting Sanction To Employees.

- Counseling Of Passing Interview.

Use E-Commerce For The Business Of Global From

M". Ono W. Purbo, Hotel Santika Joint With

Gadjah Mada University.

Hq The Quality ti Machinery Steel. ti Machinery

Steel Properties And Maintenance Cost, Pt. Tira

Andalan Steel.

Sap 2000 For Construction n Ssc Mechanical

(CERTIFICATE: 2006/SSC1/SHORT/SAP/018)

• 2014 Fundamental Project Management Training

Certificate Rina - Reglstro ltallano Navale

Sponsor av PT. PGN, Mercure Hotel Kuta Bali

• 2016

• 2017

• 2018

• 2019

Cathodic Protection System SACP & ICCP Training Certificate Commissioning Englner By PETROS

SCAD A system

- SCADA PCS & SIS Engineering

- SCADA PCS & SIS Operator ESD

- SCADA PCS & SIS SCD2200 Operator

Basic and Standar Chevron Training (HES Pasport)

- Devense Driving

- MSW Fundamental A&B

- SWC/SYLA

- Zero Harm

ABILITY/ICEMAMPUAN

• Microsoft Office Word, Exel, Project, Power Point, Access & Outlook, Corel Draw, Corel Photo Paint.

• Autocad, 30 Piping CAD SolidWorks

• SAP 2000 FOR CONSTRUCTION, CAESAR II

• Exel untuk Akutansi { Neraca, Laporan Rugi Laba, Penganggaran, Journal dan Buku Besar )

• Excel untuk Proposal Studi Kelayakan (Feasibility Study), RKAP, RAB, BQ dan EE

(Engineering Estimate)

• Preparing the S-Curve [Mcrosoft Project] for Project Management Office.



Contact this candidate