Post Job Free

Resume

Sign in

Senior Cost Engineer

Location:
Jakarta, Indonesia
Salary:
SAR 25000
Posted:
March 17, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

Suharnel Muhardian Nusa

Mobile Phone: +62-812-****-****

E-mail: adccgf@r.postjobfree.com

PROFESSIONAL SUMMARY

More than 23 years of experience in Project Control Team at various multinational companies. Successful to carry out the Estimating, Cost Controller and Quantity Surveyor roles for EPCI projects in Oil & Gas and Power Plant industry.

Presently looking for a right opportunity in Estimating, Cost Controller and Quantity Surveyor of EPCI Project.

EMPLOYEMENT HISTORY

1. JGC Gulf International Co. Ltd, Al-Khobar – Saudi Arabia 2018 - 2020

2. PT. Juhdi Sakti Engineering, Jakarta - Indonesia 2016 - 2018

3. Petronas Carigali Sdn Bhd, Kuala Lumpur - Malaysia 2013 - 2016

4. PT JGC-Indonesia, Jakarta - Indonesia 2011 - 2013

5. Master Marine AS, Batam - Indonesia 2010 - 2011

6. Keppel Offshore & Marine - Singapore 2007 - 2010

7. PT. McDermott Indonesia, Batam - Indonesia 2006 - 2007

8. PT. Thiess Contractor Indonesia, Jakarta - Indonesia 2005 - 2006

9. PT. Istech Resources Asia 2004 - 2005

10. PT. Tripatra Engineering and Construction 1996 - 2004

SUMMARY EXPERIENCE

I. JGC Gulf International Co. Ltd

Location : Al-Khobar – Saudi Arabia

Position Title : Senior Cost Engineer

Period : 6 Jan 2018 – 6 Jan 2020

Responsibility:

A.Cost Estimating

-Review and interpreting of Project Specification from ITB which needed to be part of Bid.

-Develop Estimate Plan, methodologies and strategy to produce cost estimate into proper WBS.

-Prepare the PCE estimate to provide a guideline for the estimate process and to inform Top Management of the expected price range of the proposal.

-Coordinate with other Disciplines from Engineering, Procurement and Construction to make sure the BMBQ information meet the highest accuracy for proposal bid calculation by having review and analysis for each cost component.

-Perform Risk Analysis to define cost contingency for cost estimating amount (cost risk assessment)

-Finalization the bid proposal and make presentation to get approval from corporate management.

-Finalization the commercial proposal/Price Schedule as per Client formats/Bid Requirement.

-Maintain and updated costing database, historical cost information & benchmarks.

Historical data of various project executed in terms of unit rates like engineering man-hours and Construction Costs.

Cost for bulks procurement, structural steel and packaged units.

B.Cost Control

-Develop Budget setting & Target setting (Forecasting) cost preparation once the project award.

-Preparing Project control procedure and methodology based on awarded contract type.

-Carries out comparison between the project budget and the project cost forecast and prepares project expenditure cost trend analysis

-Analyze the cost variance by monthly and inform the project status performance Project Manager.

-Control the Project expenditure by doing check estimate for BM/BQ, and updating for Risk Analysis periodically for contingency analyses.

-Submit Monthly Cost report, Man hour report and Project Management report by determined the Earn Value Management as guidelines of Project Performance.

-Taking part to proceed the potential Change Order together with PMT from identifying the change, submit the change notification, preparing Change Order proposal, making negotiation and get approval from Client.

-Maintains master Change Order Register and provides status information as necessary.

Proposal :

I. Sour Water Stripper & Disposal System

Location : Jubail (117 km North of Al Khobar)

Client : Saudi Aramco (Berri BGP)

Description : Engineering, Material Procurement, Installation / Construction and Commissioning Assistance for the Sour Water Stripper and Disposal System at Berri Gas Plant.

II. South Ghawar Gas Separation Plant & Facilities Project

Location : South Ghawar, Kingdom of Saudi Arabia

Client : Saudi Arabian Oil Company (Saudi Aramco)

Description : Complete development of new Gas Separation Plant (GSP) to collect well fluid from trunk lines and separate into three components: Raw Gas; Condensate; and Produced Water.

Project :

I. Replacement Joy Compressor Poject

Location : Bahrain Refinery, Kingdom Of Bahrain Manama Kingdom Of Bahrain

Client : The Bahrain Petroleum Company BSC. (Closed)

Description : Replacing the existing Joy Air Compressors with two (2) electric-motor driven centrifugal compressors (one operating and other standby) with capacity of each corresponding to 2300 SCFM dry air (at the outlet of air dryer). Two (2) air dryers (one operating and other standby) shall be provided in the downstream of compressors together with water cooling set-up, necessary instrumentation and piping.

II. Urea Formaldehyde (UF-85) Project

Location : Sitra Island, Kingdom Of Bahrain

Client : Gulf Petrochemical Industry Company (B.S.C.)

Description : Engineering, Procurement, Construction and Commissioning of a 22 MTPD Urea Formaldehyde (UF-85) Plant including all the auxiliary systems required to constitute a complete working system.

II. PT. Juhdi Sakti Engineering

Location : Jakarta - Indonesia

Position Title : Proposal Manager

Period : Jun 2016 – Jan 2018

Responsibility:

-Manage coordinate to prepare Cost Proposal for EPC Projects as per client requirements from ITB and make sure that tender delivered to the client in time.

-Coordinate with other Disciplines from Engineering, Procurement and Construction to make sure the BMBQ information meet the highest accuracy for proposal bid calculation by having review and analysis for each cost component.

-Finalization the bid proposal and make presentation to get approval from Corporate management.

-Maintain and updated costing database, historical cost information & benchmarks.

Historical data of various project executed in terms of unit rates like engineering man-hours and Construction Costs.

Cost for bulks procurement and structural steel.

Projects :

I. Installation Pipeline Gas Grissik - PUSRI Project

Location : South Sumatera, Indonesia

Client : PT. (Persero) PERTAMINA GAS

Description : Engineering, Procurement and Construction (EPC) Diameter 20 Inch gas pipeline 176,000 meter length from Grissik to PUSRI plant.

II. Fabrication and Erection 7 Unit Tanks BP Berau Ltd Tangguh Expansion – Project Execute LNG EPC

Location : Bintuni Bay Papua, Indonesia

Client : CSTS (Chiyoda, Saipem, Tripatra, SAE)

Description : Engineering, Procurement and Construction (EPC) 7 unit tanks :

-Produced Water Storage Tank, Capacity : 2,462 M3

-New Amine Tank, Capacity : 1,23080 M3

-Desalinated Water Tank, Capacity : 5,663 M3

-Demineralized Water Tank, Capacity : 595 M3

-Recovered Oil Tank, Capacity : 35 M3

-Produced Water Buffer Tank, Capacity : 9.936 M3

III. Steel Structural Installation BP Berau Ltd Tangguh Expansion – Project Execute LNG EPC

Location : Bintuni Bay Papua, Indonesia

Client : CSTS (Chiyoda, Saipem, Tripatra, SAE)

Description : Steel Structure Installation Total 14, 122,931.78 Kg

III. Petronas Carigali Sdn Bhd

Location : Kuala Lumpur - Malaysia

Position Title : Cost Specialist

Period : May 2013 - May 2016

Responsibility:

-Prepare Cost Estimate for Feasibility Study, FEED or Detail Design purposes

-Collaborates with project team members to review project risk, opportunity and contingency register on an on-going basis to ensure if any significant value that potential impact to project.

-Maintain and updated costing database, historical cost information & benchmarks.

Historical data of various project executed in terms of unit rates like engineering man-hours, onshore fabrication costs, various equipment rental and usage cost at yard.

Cost for bulks procurement, structural steel and packaged units.

Rates for Offshore and Pipeline installation using DLB’s and PLB’s.

Unit rates for Hook Up and Commissioning labour Cost etc.

-Contribute to the development of local citizens especially new professionals Cost Engineer.

Projects :

1.Samarang EFAD Project

Project Cost : USD 55 MM

Location : Malaysia

Description : Drilling 4 wells, Topside infill modification (SIPROD and well Tie-In), Install new Wellhead Control Panel (WHCP), Piping and Deck Extension to accommodate new equipment.

2.Bayan Gas Development Phase 2 Project

Project Cost : USD 216.5 MM

Location : Malaysia

Description : Drilling 4 wells, Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) of the unconventional Platform, Bridge and Installation Pipeline.

3.Samarang Phase 2 EOR Project

Project Cost : USD 542 MM

Location : Malaysia

Description : Drilling 12 wells, Topside infill modification (SIPROD and well Tie-In), Installation new equipment (Compressor and Booster Pumps), Piping and Deck Extension to accommodate new equipment and Installation Pipelines.

4.Angsi Water Flooding Optimization Project

Project Cost : USD 67 MM

Location : Malaysia

Description : Installation new equipment (GTG and Pumps), Piping and Deck Extension to accommodate new equipment.

5.CPOC Phase 3 Project

Project Cost : USD 645 MM

Location : Malaysia

Description : Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) of the 4 units WHP, Modification existing Platforms and Installation Pipelines.

6.Dalak Pipeline Project

Project Cost : USD 287 MM

Location : Malaysia

Description : Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) of the 16” x 40 KM Offshore and Onshore Pipelines.

7.SOGT Elevated Road for Railway Crossing Project

Project Cost : USD 11 MM

Location : Malaysia

Description : Engineering, Procurement and Construction (EPC) of the Elevated Road.

IV. PT. JGC Indonesia

Location : Jakarta - Indonesia

Position Title : Sr. Cost Engineer

Period : June 2011 - April 2013

Responsibility:

-Develop Estimate Plan, methodologies and strategy to produce cost estimate into proper WBS.

-Prepare the PCE estimate to provide a guideline for the estimate process and to inform Top Management of the expected price range of the proposal.

-Coordinate with other Disciplines from Engineering, Procurement and Construction to make sure the BMBQ information meet the highest accuracy for proposal bid calculation by having review and analysis for each cost component.

-Perform Risk Analysis to define cost contingency for cost estimating amount (cost risk assessment)

-Finalize the bid proposal and make presentation to get approval from corporate management.

-Finalization the commercial proposal/Price Schedule as per Client formats/Bid Requirement.

-Maintain and updated costing database, historical cost information & benchmarks.

Historical data of various project executed in terms of unit rates like engineering man-hours and Construction Costs.

Cost for bulks procurement, structural steel and packaged units.

Project :

1.FEED Dry Gas Diverter Manifold (DGDM) Project

Location : Bintulu Serawak - Malaysia

Client : MLNG, Petronas

Description : Engineering, Procurement and Construction (EPC) of the Dry Gas Diverter Manifold.

2.Arun LNG Receiving HUB & Re-Gasification Terminal Project

Location : Loksumawe, Aceh Indonesia

Client : PT. Pertamina (Persero)

Project Cost : USD 76 MM

Description : Engineering, Procurement and Construction (EPC) of the Receiving HUB and Re-Gasification Terminal

3.Development Oil Terminal Pulau Sambu Project

Location : Pulau Sambu, Riau Province Indonesia

Client : PT. Pertamina (Persero)

Project Cost : USD 79.6 MM

Description : Engineering, Procurement and Construction (EPC) of the Development Oil Terminal

4.New Condensate and Diesel Tank Project

Location : Bintuni Bay Papua, Indonesia

Client : BP Berau Ltd Indonesia

Project Cost : USD 40 MM

Description : Engineering, Procurement and Construction (EPC) of the New Condensate Capacity 19,000 M3 and Diesel Tank Capacity 2,000 M3

5.Shell LOBP Project

Location : Jakarta

Client : Shell Eastern Petroleum (Pte) Ltd

Project Cost : USD 57 MM

Description : Engineering, Procurement and Construction (EPC) of the Lube Oil Blending Plant (LOBP).

V. Master - Marine AS

Project : Service Jack - Up L206 NORA

Project Cost : Euro 141.8 MM

Location : Batam – Indonesia

Position Title : Sr. Quantity Surveyor

Period : December 2010 - June 2011

Description : Engineering, Procurement, Construction and Commissioning (EPCC) of the Rig Jack-Up.

Responsibility:

-Review contract documents and commercial procedures from Contractor to meet Company’s requirement, evaluate cost and schedule impact of all individual internal and external changes.

-Evaluate and analyse change orders (hours, days & cost) which requested by contractor. Liaise with engineering team for technical justification of change orders.

-Assisting Project Controls & Services manager to review change orders with estimate cost and negotiate with contractor.

-Technical and commercial review for contractor invoices and make sure billing is in accordance with the contractually compensation agreement.

VI. Keppel Offshore & Marine Singapore

Position Title : Sr. Quantity Surveyor

Location : Singapore

Period : November 2007 – April 2008

Project : FPSO Cidade de Sao Mateus

Responsibility:

-Prepare and review measurement quantity report from AFC drawing against actual on site (Piping, Mechanical and Instrumentation trades) for FPSO Conversion Project.

-Prepare budgeting based on agreed quantity with client.

-Negotiate with client for re-measurement and budgeting.

-Technical and commercial review for sub-contractor invoices and make sure billing is in accordance with the contractually compensation agreement.

Position Title : Sr. Commercial Officer

Location : Singapore

Period : April 2008 – December 2010

Project : Repair Marine Vessels ( Tanker, Containerships, Bulker and LNG Carrier)

Responsibility:

-Prepare the cost proposal for repair marine vessels based on specification from client.

-Coordinate with other Disciplines from Engineering, Procurement and Construction to make sure the BMBQ information meet the highest accuracy for proposal bid calculation by having review and analysis for each cost component.

-Perform Risk Analysis to define cost contingency for cost estimating amount (cost risk assessment)

-Finalize the bid proposal and make presentation to get approval from Corporate management.

-Establishing and implementing Project cost estimating database for benchmarking and reference

VII. PT. McDermott Indonesia

Project : Arthit Central Process Platform Project

Project Cost : USD 110 MM

Location : Batam - Indonesia

Position Title : Sr. Cost Engineer

Period : March 2006 - November 2007

Description : Fabrication, Load Out, Sea Fastening, Transportation, Installation of Central Process Platform Facilities.

Responsibility:

-Managed lump sum, unit rates and reimbursable contracts including re-measurement.

-Prepare and submit change order with estimate cost and negotiate with client, maintain change order log and ensure the change order approved and ready for payment

-Technical and commercial review for subcontractor invoices and make sure billing is in accordance with the contractually compensation agreement.

-Support Project Controls Manager in day to day activity, review & analyse cost performance by identifying cost over/under run and prepare variance explanation.

VIII. Thiess Contractor Indonesia

Project : Darajat III Geothermal Power Project

Project Cost : USD 85 MM

Location : Garut - Jawa Barat, Indonesia

Position Title : Quantity Surveyor

Period : May 2005 - March 2006

Description : Engineering, Procurement and Construction (EPC) of the Geothermal Power Plant.

Responsibility:

-Review contract documents and commercial procedures from sub-contractor to meet Company’s requirement, evaluate cost and schedule impact of all individual internal and external changes. Evaluate and analyse change orders (hours, days & cost) which requested by sub-contractor. Liaise with engineering team for technical justification of change orders.

- Assisting Project Control Manager to review change orders with estimate cost and negotiate with owner and sub-contractor.

-Technical and commercial review for sub-contractor invoices and make sure billing is in accordance with the contractually compensation agreement.

-Evaluate cost & schedule impact of all internal and external scope changes. Evaluate and analyse change orders (hours, days & cost) which requested by client and liaise with engineering team for technical justification of change orders.

-Prepare and submit change order with estimate cost and negotiate with client, maintain change order log and ensure the change order approved and ready for payment.

IX. PT. Istech Resources Asia (as Seconded of Chevron Pacific Indonesia) Location : Riau - Indonesia

Position Title : Cost Estimator

Period : June 2004 - May 2005

Description : Engineering, Procurement and Construction (EPC) of the On-shore New Area Development Project.

Responsibility:

-Prepare Cost Estimate for Feasibility Study, FEED or Detail Design purposes

-Collaborates with project team members to review project risk, opportunity and contingency register on an on-going basis to ensure if any significant value that potential impact to project.

-Maintain and updated costing database, historical cost information & benchmarks.

Historical data of various project executed in terms of unit rates like engineering man-hours, onshore fabrication costs, various equipment rental and usage cost at yard.

Cost for bulks procurement, structural steel and packaged units.

-Review cost proposal submitted by Contractors.

-Evaluate and analyze change orders (hours, days & cost) which requested by contractor. Liaise with engineering team for technical justification of change orders.

X. PT. Tripatra Engineering and Construction (as Seconded of Chevron Pacific Indonesia)

Location : Riau - Indonesia

Position Title : Cost Estimator

Period : September 1996 - June 2004

Description : Engineering, Procurement and Construction (EPC) of New Area Development Duri Steam Flood Project.

Responsibility:

-Prepare Cost Estimate for Feasibility Study, FEED or Detail Design purposes

-Collaborates with project team members to review project risk, opportunity and contingency register on an on-going basis to ensure if any significant value that potential impact to project.

-Maintain and updated costing database, historical cost information & benchmarks.

Historical data of various project executed in terms of unit rates like engineering man-hours, onshore fabrication costs, various equipment rental and usage cost at yard.

Cost for bulks procurement, structural steel and packaged units.

-Review cost proposal submitted by Contractors.

-Evaluate and analyze change orders (hours, days & cost) which requested by contractor. Liaise with engineering team for technical justification of change orders.

PERSONAL DATA

Name : Suharnel Muhardian Nusa

Profile : Male, 51, Married

Place of Birth : Bonjol, Indonesia

Date of Birth : March 19, 1969

Nationality : Indonesian

Mobile : +62-812-****-****

Skype ID : suharnel

HIGHEST EDUCATION

Degree : Master of Business and Administration

University : Cardiff Metropolitan University – UK at Kuala Lumpur, Malaysia

Year : 2015

Major : Business and Administration

Degree : Bachelor of Mechanical Engineering

University : Bung Hatta University - Padang, Indonesia

Year : 1996

Major : Mechanical Engineering

TRAINING / COURSE RECORD

•QUE$TOR by HIS, 2015

•Project Cost Risk Analysis by Wright Energy Consulting, 2013

•Primavera P6 by Oil Institute, 2011

•Shipyard Safety Instruction Course by NTUC Work place Safety & health Singapore, 2007

•Risk Management Training by JRay McDermott Singapore, 2007

•Cost Commitment Tracking System (CCTS) by JRay McDermott Singapore, 2006

•Local Content Training by BP Migas Indonesia, 2006

•MS Access 97 advanced by Chevron Pacific Indonesia, 1999

•Procurement Requisition by Chevron Pacific Indonesia, 1998

•Inventory Requisition by Chevron Pacific Indonesia, 1998

•Calfais Code Familiarization & Business Basic by Chevron Pacific Indonesia, 1997

REFERENCES

1.Muhammad Alwi (Cost Specialist - Sub Sea 7 S.A) Mobile +966-**-***-****

2.Candra Nugraha (Cost Engineer - Qatar Petroleum) Mobile +62-812-****-****

3.Hernesto Quarino (Cost Engineer - Baker Hughes) Mobile +62-812-****-***



Contact this candidate