MURAT DARMAN Contact: +90-535-***-**-**/ Email: adcbts@r.postjobfree.com

CURRICULUM VITAE

Professional Summary

A competent and result-oriented professional with over 3 decades of experience in Project Management, Installation & Commissioning bothinPower and Oil & Gas Projects.

Qualified Diploma in Electrical & Instrument Engineeringand holds HSE, GE, CHEVROIL Certifications.

Deft in reviewing existing purchase / vendor development & management activities and instituting necessary measures for curtailing unnecessary expenditure and saving costs.

Comprehensive experience inpreparing entire instrumentation files, installation of all of the instruments &laboratory tests, construction & installation works, on-site construction audit in terms of electrically and cable installations.

Adroit in doing continuity test, ending and glanding of cable installations, pneumatic & hydraulic tests of process and air pipes.

Adept in managing finalization, negotiation, development & implementation of key procurement strategies / contingency plans with vendors for materials / products; ensuring that strategies & plans are aligned with project requirements.

An effective communicator with exceptional analytical as well as technical skills with the abilities to relate to the people at any level of business and management.

Business Skills

Project Management Set-up & Start-up Operations Material Specification

People & Team Management Technical Support Installation& Commissioning

Material Management Troubleshooting QA/QC Documentation

E&I Construction Quality Inspection / Management Manpower Management

Professional Experience

Jan 18-Feb 18: Irak-Basra ENI Company Power Plant Constructıon works organısatıon .E&I Constructıon Manager.

Key Projects Handled:

* 2 pcs 135MW GE 6FA Gas Turbine.

* 2 pcs 135MW ALSTOM Steam Turbine.

Construction and installation works, on-site construction audit in terms of electrically and cable installations.

Continuity test, ending and glanding of cable installations,

Nov’15-Jan 18 : Omran Holdıng. Internatıonal as an Electrıc Engıneer Prımer substatıon Design.

Afghanistan

Key Projects Handled:

110 kV Prımer Substatıon Design

0,4kV/11kV Substatıon Design,

Apr’15 – Oct’15: Indassol Company, UK as an E&I Engineering. CHP Power Plant . Mardin/TURKEY.

Key Projects Handled:

2 pcs 80MW GE 6FA Gas Turbine.

1 pcs 80MW ALSTOMSteam Turbine.

BOP System Construction Completed, System put on the Operations.

Feb’14 – Nov’14: Khalij Power Plant- Sirta, Libya as an E&I Process Dept. Commissioning –Start-up Mng. /Bechtel-Cps

Key Projects Handled:

4 pcs 350 MW Hitachi Steam Turbine.

Total Power Plant Output. 1500MW &400Kv.

GSUT and UAT Switch yard.

Power Plant All Utility System.

Nov’12 – May’13: JANUB CCPP Commissioning – Start-up /Şirvan - Azerbaycan as an E&I Process Manager General Electric

Key Projects Handled:

4 pcs of Combined Cycle Power Plant (CCPP) [General Electric (GE) MS9001E (PG9171E)] and 2 pcs of Steam Turbine [Hangzhou] have commissioned and started up.

Each [General Electric (GE) MS9001E (PG9171E)] NG Turbine was 126 MW.

Hangzhou Steam Turbine was 135MW.

Total Power Plant Output: 774 MW.

Apr’12 – Nov’12: Petroleum Platform Construction& Commissioning / Baku – Azerbaijan as an E&I Supervisor British Petrol

Key Role:

Prepared entire instrumentation files, installation of all of the instruments and laboratory tests.

Done construction and installation works, on-site construction audit in terms of electrically and cable installations.Responsible for continuity test, ending and glanding of cable installations,Pneumatic & hydraulic tests of process and air pipes.

Accountable for building up of calibration laboratory.

Mar’09 – Aug’09:ALSTOM as an E&I Supervisor Alstom+Inco J/V

Key Projects Handled:

2000MW CCPPCommissioning – Start Up / U.A.E. Fujairah

5pcs Gas Turbine (Frame-26A/ Alstom), 5pcs HRSG, 3 pcs Steam Turbine, 5pcs Substation HV / LV, 400 kV Transformer Substation Construction.

Mar’06 – Oct’08: Tengiz- Chevron Oil SGI/SGP Refinery Project, Tengiz – Kazakhstan as an E&I Supervisor Bechtel – Enka JV

Key Projects Handled:

Executed work plan and manpower coordination of sour gas injection and sour gas project 2 GT Frame 9, 2 HRSG, 8 Switch yards HV/LV,110 kV Primary Substation and carried out Loop tests.

Apr’05 – Feb’06: Black&Veatch+ Gama as an Instrumentation Supervisor . CCPP Power Plant Project.

Key Projects Handled:

Black &Veatch + Gama Power JV

300 MW CCPP Project, Zarqa /Amman-Jordan

Apr’04 – Apr’05: Gama+Mitsubıshıas an Instrumentation Supervisor Gama Industrial Comp + Mitsubishi Eng.

Key Role:

Overseen Cable ducts trenching, monitored and controlled power cable layouts and carried out Meggercontinuity tests, termination and glandings.

Liaised with instrumentation department.

Key Project Handled:

Petkim – Ethylene Factory Renovation Project /Aliağa - Izmir – Turkey.

Jan’99 – Dec’03: Delta Electro-Mechanic Company / Aşkabat-Türkmenistanas Regional Director

Key Projects Handled:

Administered electrical design works as in the following projects:

oPower systems (diesel generator / UPS), transformers, HV & LV Switchgears, transformer and distribution substations, cable trenching and size control according to voltage dip, electrical motor control systems, remote monitoring telecommunication systems, CCTV systems, HVAC, Optical system termination and loop tests, fire extinguisher system and signalization systems.

oTook care of the electrical infrastructure, nurse calling systems, CCTV, diesel generator and ups systems, elevators, IT system, card readers, announcement system and emergency lighting for 600-bed army hospital.

Apr’96 – Dec’98: General Power.as an E&I Group Manager General Electric

Key Projects Handled:

4 x 135MW / 110kV Power Plant Project, Aşkabat / Türkmenistan.

Supervised connection brackets and steel baseframe production and construction.

Oct’93 – Mar’96: as anGama Endüstri&İnşaat A.Ş. as an E&I Group Manager

Key Project Handled:

Cultural Center Building and Mosque Project / Aşkabat- Türkmenistan and looked after Construction of electrical units,worksite electrical units and project based electrical units needs entire process starting from purchasing till commissioning.

Jan’92 – Oct’93: Gama Industrial + Mitsubishi Eng. JV as an Instrumentation Supervisor

Key Project Handled:

Petrochemical Olefin (Port) Refinery Project /Al Jubail–SuudiArabistan and responsible for progress update, monitored work plan, daily base progress update of on-site works and presented progress reports to General Manager.

Sep’87 – Nov’91: Baytur- Tekser JV as an Electrical Supervisor

Key Projects Handled:

Municipality Water Treatment Facility Project / Misrata– Libya.

Water treatment facility electrical works responsibility where 7 pcs pump stations available.

14 x 1000 kVA 11kV / 0,4 kV transformer, 7 x 1000 kVA diesel generator erection, installation and commissioning responsibility.

Feb’85 – Dec’86: Gama Endüstri A.Ş. as an Electrical Supervisor

Key Role:

Responsible for handling entire electrical equipment of water treatment facility,

Administered construction works, cathodic protection systems, entire HV and LV cabling, MCC panels, electrical motor controls, reactive power compensation systems, lighting systems.

Made electrical QA / QC reports.

Done electrical system installation of 40 km pipe line with employer’s staff and completion of as-built projects & served to employer.

Key Projects Handled:

Municipality Water Treatment Facility Project – 40km 48” Pipe Line Construction /Zarga- Amman/ Jordan.

Apr’83 – Feb’85: Enka-Kutlutas Construction JVas an Electrical Field Engineer

Key Projects Handled:

RaslanufNew City Construction Project /Raslanuf-Libya.

Engineering, procurement and coordination of 35 pcs of secondary transformer substation where each of was 2x1000 kVA 11/0,4 kV and 2x100MVA 66kV Primary substation.

MV switchgears erection, adjustment of protection relays, UPS battery coordination system adjustment, HV / LV cable installations, meggertestsof entire cable system, connection controls and terminations, lighting panels, grounding systems turnkey handling over to employer.

Commissioning of HVAC system’s by performing electrical connections.

Apr’80 – Mar’83: A.E.A TESAN JV as Chief of E&I Group

Key Projects Handled:

Title : Petrochemical Refinery – Ethylene Oxide Facility /Aliağa-Izmir / Turkey

Period : Jun’81 – Mar’83

Role : Looked after entire system electrical, electromechanical & instrumentation installation, construction responsibility and Sub-contractor management.

Title : Chemical Facility Project /Bolvadin - Afyon / Turkey

Period : Apr’80 – May’81

Academic Credentials

2009 Diplomain Electrical & Instrument Engineeringfrom Lorenz University; secured 3.19 GPA

Professional Courses & Trainings Undergone:

SIEMENS PLC & Server Systems Software for 15 days in Jan’09.

Tengizchevr OilHSE Training and Communication for 3 days in Mar’06.

GE Mark VI Control System for 4 days in May’05.

GE Building Authority for 2 days in Feb’97.

GE- Mark V Control System for 3 days in Jan’97.

GE-POWER Authorized People in Power Plants for 6 days in May’96.

Mitsubishi HSE Representative Course for 2 days in Feb’92.

GAMA Employer / Contractor HSE Supervisor Ship for 2 days in Mar’85.

SIEMENS Maintenance & Operations for 5 days in Apr’84.

PET-KIM HSE Training for 3 days in Aug’82.

AG-KNOLL GMBH Installation Discipline for 2 days in Jun’80.

Personal Dossier

Date of Birth : 1st January, 1956, Sirimli–Izmir

Military Service : Exempted

Languages Known : English, Russian &Arabic (Verbal / Fluent)

Nationality : Turkish Republic

Address : ÖğretmenTanerGürer, SOK No. 2, Daire:4Davutlar/Kuşadası/Aydin – Turkey