CAREEROBJECTIVES:
Mycareerobjectiveistoworkinaleadingcompany,overcomeany
challengesthatmyjobprovideme;matureasanindividualintheprocess andinturnhelpthecompanygrow.
Seekingachallengingenvironmentthatencouragescontinuouslearning, creativityandthatprovidesexposuretonewideaswhichpaveswayfor personalandprofessionalgrowth.
Topursuemycareerinafield,wheremytechnicalandinterpersonalskills wouldbewellutilizedandIwouldaugmenttotheprofitofthecompany. EDUCATION:
BEinElectricalandElectronicsEngineering–63%
AcademicYear–2009to2012,AnnaUniversity,Chennai
(Karpagavinayaga college of Engineering and Technology, chinna kolambakkam,madurantakam,kanchipuram-603308)
DiplomainElectronicsandCommunicationEngineering–84% Yearofpassing–2008
(VivekanandaPolytechniccollege,Sepalnatham)
HigherSecondary-69%
YearofPassing-2006
N.L.C.HigherSecSchool,Mandarakuppam–607802
HighSchool-85%
YearofPassing-2004
N.L.C.HigherSecSchool,Mandarakuppam–607802
CURRICULUMVITAE
KARUPPAIYAAYYANAL
No23,SBlock,RiceMillStreet,
Thandavankuppam,
Mandarakuppam (Post),
Virudachalam(TK),
Cuddalour(DT),PinCode-607802
TamilNadu,lNDIA.
Mobile(INDIA):+919*********,+919*********
Emailid :adcbgv@r.postjobfree.com
PassportNo:P1359724
DateofBirth:03-Jun-1989
COMPUTERSKILLS:
MSOffice,Excel,c++,ect…
HardwareandNetworking
LANGUAGESKNOWN:
English-Read,write,speak
Tamil -Read,write,speak
Telugu-speak
Hindi -25%speak,50%understand(NowItrytolearnHindi)
EXPERIENCEKEYSKILLS:
4 YEARS OF EXPERIENCE IN ELECTRICAL OPERATION &
MAINTENANCE(MEPindustry)-powerplant,industrial,substation-110 switchyard,11kv/6.6kvtransformer,circuitbreakers,relays,lighting, ups,battery,inverter,ECP,MCB,DB,alltypesofmotor,STPplant,ETP plant,RO plant,changeoverpanel,alltypesofAC,HVAC system, capacitorpanelboard,spinnermachine,oven,Radiofrequencydryer, sewing machine, conveyors & bagging machine, rotating equipments...etc&maintenanceofplumbingrepairpipeworkandall plumbinginstallwork.
BUILDINGCONSTRUCTION-(MEPProjects)ReadandwriteElectrical drawing&Mechanicaldrawing,testing,commissioningandinstalledDB, subDB,circuitbreakers,changeoverpanelboard,wiring-joint,glands, earthingsystem,lightingsystem,installRCCB,ECB,MCB,MCCD,install ofalltypeAC,HVACsystem etc&ExperienceinBatchingPlantandall plumbingwork.
PETROCHEMICALPLANT:- ExperienceinElectricalMaintenanceof panelboard,transformer,substation,buildingwiring,alltypesofAC, HVACsystem,motors etc.
2YEARSOFEXPERIENCEINPOWERPLANTAND SUBSTATION-
Testingandcommissioning11kv,132kvsystem,inspectionofcontrol andrelaypanel,ErectionofHT<transmissionlineandsubstation, troubleshootingofalltypeselectricalequipments,machine...etc
1YEARSOFEXPERIENCEINMETROPROJECTINDUBAI-(Iamworking withQualitycontrolQC&QualityassurenceQAdepartment)3RDRAIL studied&followdesigndrawingandinstalled,followinspectionwithQC, rectifiedwork,dailyarrangematerials,workpermit,tools&safety precautions...etc
1YEARSOFEXPERIENCEIN WIPROLIMITEDPONDICHERRY-Trainee Engineer-IntegrationAssembly&TestingPC'sandsystems. EXPERIENCEOF8YEARS:
1.OOMMAAGROUPOFCOMPANIESINUAE:
(MANPOWERSUPPLIESCOMPANY)
ISelected"GeneralElectricalEngineer"postinExcellentManpower TechnicalServicesLLC.ButIlookedfollowingsite"Expolink2020 DubaiMetroProject(MEPworks&SHOWDOWNproject).
Workedasa"3rdRailForeman"inALSTOMatDubaifrom25thSEP 2018to23thJULY2019.(IworkedunderMr.AlvinTaninALSTOMTrack superintendent)
JOBRESPONSIBILITIES:
Studiedandfollowed3rdraildesigndrawingsandco-ordinationwithoursite InchargebeforeconcretemarkedinsiteEJpoint,bracketpoint,3rdRailtoRail jointpoint,CTpoint,MPApoint,HSRpoint...etc.
IfollowedinspectionandinstalledforTemplateboxswithdowel.
Ifollowedandinstalled3rdrailjoint,EJrail,MPA,Bracket,CTplate,HSR rail..etc
Ifollowedandinstalled3rdrailsafetycover,EJcover,CTcover,pasteddanger sticker..etc
Ifollowedandco-ordinationwithQC&Engineerinspectionfor3rdrailgauge, 3rarailjointElectricalcontinuitytest,CTplatecontinuitytest,EJrailgaptest, MPAgaptest,3rdrailallsafetycovergauge,3rdrailtobracket&cover insulationtest,HSRrailtippoint,brackets...etc
Sometimesproblemsiteifollowedandrectifiedinour3rdrail.
IamworkingwithQC&QAdepartment.
DailyworkstartbeforeIinformoursiteinchargeworkdetails&Iprepareand arrangedforworkpermit,materials,Tools&safetyprecautions.
WorkfinishedafterIarrangedQC&Engineerfor3rdrailinspectionandinform oursiteincharge.
Dailyifollowedandcheckedourworkerssafetyshoes,handgloves, goggles..etc
Managedprojectsfromstarttofinish,whilesupervising20-25workers.
Maintainthedailyactivitiesrecordandsenttooursiteincharge. 1.GUPTAGROUPOFCOMPANY(P)LTD,CHENNAI:
Workedasa‘ElectricalMaintenanceEngineer’in‘GUPTAHAIR PRODUCTS(P)LTD’(GUPTAGROUPOFCOMPANYBuildingconstruction& MEPindustry)atChennaifrom15thNOV2016to10thAUG2018. JOBRESPONSIBILITIES:
Operation&maintenanceof‘changeoverpanelboard&capacitorpanel board’(capacity-56kw/70kva/4ploe/250A/3phase/CTconnection).
Operation&maintenanceof‘DieselGenerator’(capacity- 28kw/35kva/440v/3phase/Brand-powerica).
Preventivemaintenanceandrepairof‘MCBswitchboard,circuitbreaker, relayswitch,controlpanelboard,fusecare,etc..
Preventivebuildingelectricalmaintenance&repairof‘tubelights&fans, constructionwiring,constructionswitchboard,(1hp,2hp,3hp)motors, waterpump,ups,intercomsystem,weighingm/c,spinnermachine,oven, etc…
Operation&maintenanceof‘Reverseosmosisplant’(drinkingwater treatmentplant(ROPLANT)(capacity-3kw/3phase/440v).
Operation&maintenanceof‘Effluenttreatmentplant’(drainagewater treatmentplant(ETPPLANT))(capacity-15kw/3phase/440v).
Operation&maintenanceof‘Sewagetreatmentplant’(STPPLANT).
Operation&maintenanceof‘Radiofrequencydryer’(capacity- 5kw/6kva/3phase/440v).
Operation&maintenanceof‘Hotwatergenerator’(capacity- 2kw/1phase/240v/Brand-Termax).
Preventivemaintenance&repairof‘sewingmachine’(capacity-(1/2hp) motor/250watts/1phase).
Repair&rewindingofceilingfan.
MaintenanceofAlltypesofACandHVACsystem.
Maintenanceofallplumbingrepairworkandnewinstallwork.
Maintainthedailypowerconsumptionrecords.
Maintainthedailyactivitiesrecords.
2.MANALIPETROCHEMICALLTD,CHENNAI:
Workedasa‘JuniorElectricalEngineer’in‘MANALIPETROCHEMICALLTD’at Chennaifrom29thAUG2014to30thSEP2016.
JOBRESPONSIBILITIES:
Operation&maintenanceofsubstations(HT,LT,switchgear,110KV switchyard).
Operation&maintenanceof(11KV/6.6KV)5.6/7.0MVATransformer– MakeAlstom.
Operationandmaintenance&SAP-PMofHV/LVpanelsof
33kv/11kv/6.6kv/440v,48MWpowerplant,circuitbreakerssuchasVCB, SF6,OCB,ACBandTransformer,Isolators,lighting,Earthswitches&Earth pits,MCC,PCC.,Allkindsofmotors&motorsstarters,capacitorbanks.
Maintenanceofmotor,powertransformer,relays,relaypanel,UPS,Battery charger,batteries,ECP(electricalcontrolpanel).
Troubleshootingofpowerwiringandcontrolwiring,lightingetc..
MaintainthealltypesofAC,HVACsystem.
Maintainthedailypowerconsumptionrecords.
Maintainthedailyactivitiesrecords.
3.GKPOWEREXPERTISEPRIVATELIMITED,CHENNAI:
Workedasa‘TraineeTestingEngineer’in‘GKPOWEREXPERTISEPVT LTD’.atCHENNAIfrom 18th JUN2012to31thJULY2014.ButIlooked followingtheysite“POWERPLANTANDSUBSTATION”inalloverindia. JOBRESPONSIBILITIES:
TestingandCommissioningofallelectricalequipmentfrom415voltsto 132KVsystem.
Inspectionofcontrolandrelaypanel,preparationoftestreportandcable scheduleforsub-station,powerplant..
Testingandcommissioningofcontrol&relaypanelfortransformer,bus coupler,bus-transfer,andlinefeeder.
Testingandcommissioningofpowercontrolcentreandmotorcontrol centre.
Testingofprotectiverelaysforvariousneeds.Experiencewithrelays.
Overcurrentandearthfaultrelays.
Knowledgeoftransformerprotection,transformerdifferentialprotection& REFprotection,busbarprotection,motorprotection,andsynchronizing scheme.
TestingofCT,PT,CVT,circuitbreaker,switchgearandpowertransformer
Operationmaintenanceofpowerplantandsubstatioin.
ErectionHT<transmissionlineandsubstation(33kv).
Troubleshootingofallelectricalcircuit,controlandprotectioncircuits.
Preventivemaintenanceofallelectricalequipments.
Troubleshootingandupkeepingtheelectricalequipments,systemand protection.
Studiedandfollowedelectricaldrawings,technicalspecificationsand panellayouts.
Abilitytostudy,understandandfollowelectricalschematicsandblue prints.
Managedprojectsfromstarttofinish,whilesupervising2-3crews.
Co-ordinationwithclientinasbuiltschemedrawingsubmission,test reportsubmission.
Asbuildcableschedulesubmissionandallsiteactivitytosatisfythe customer.
Expectingspecificassignments.
Maintainthedailyactivitiesrecord.
Experiencewithrelays
*ABB-REF542,532protectionrelay
*ABB-REF615protectionrelay
*ABB-SPAJprotectionrelay
*ABBREUU/V,O/Vprotection-relay
*CDGseries–O/C&E/Frelay
*7SJ6021siemensO/CANDEARTHFAULTRELAY.
4.WIPROLIMITED,PONDICHERRY:
Workedasa‘TraineeEngineer’inuninorthrough‘WIPROLIMITED’at PONDICHERRY from03thJUN2008to31thJUN2009.
JOBRESPONSIBILITIES:
Integration-Assembly&TestingofPC'sandsystems.
.
DECLARATION:
Iherebydeclarethattheabovedetailsfurnishedbymearetruetothe bestofmyknowledge.
Place:. Yourssincerely,
Date: (KARUPPAIYAAYYANAL)