Post Job Free

Resume

Sign in

Engineer Machine

Location:
Coimbatore, Tamil Nadu, India
Posted:
March 16, 2020

Contact this candidate

Resume:

CAREEROBJECTIVES:

Mycareerobjectiveistoworkinaleadingcompany,overcomeany

challengesthatmyjobprovideme;matureasanindividualintheprocess andinturnhelpthecompanygrow.

Seekingachallengingenvironmentthatencouragescontinuouslearning, creativityandthatprovidesexposuretonewideaswhichpaveswayfor personalandprofessionalgrowth.

Topursuemycareerinafield,wheremytechnicalandinterpersonalskills wouldbewellutilizedandIwouldaugmenttotheprofitofthecompany. EDUCATION:

BEinElectricalandElectronicsEngineering–63%

AcademicYear–2009to2012,AnnaUniversity,Chennai

(Karpagavinayaga college of Engineering and Technology, chinna kolambakkam,madurantakam,kanchipuram-603308)

DiplomainElectronicsandCommunicationEngineering–84% Yearofpassing–2008

(VivekanandaPolytechniccollege,Sepalnatham)

HigherSecondary-69%

YearofPassing-2006

N.L.C.HigherSecSchool,Mandarakuppam–607802

HighSchool-85%

YearofPassing-2004

N.L.C.HigherSecSchool,Mandarakuppam–607802

CURRICULUMVITAE

KARUPPAIYAAYYANAL

No23,SBlock,RiceMillStreet,

Thandavankuppam,

Mandarakuppam (Post),

Virudachalam(TK),

Cuddalour(DT),PinCode-607802

TamilNadu,lNDIA.

Mobile(INDIA):+919*********,+919*********

Emailid :adcbgv@r.postjobfree.com

PassportNo:P1359724

DateofBirth:03-Jun-1989

COMPUTERSKILLS:

MSOffice,Excel,c++,ect…

HardwareandNetworking

LANGUAGESKNOWN:

English-Read,write,speak

Tamil -Read,write,speak

Telugu-speak

Hindi -25%speak,50%understand(NowItrytolearnHindi)

EXPERIENCEKEYSKILLS:

4 YEARS OF EXPERIENCE IN ELECTRICAL OPERATION &

MAINTENANCE(MEPindustry)-powerplant,industrial,substation-110 switchyard,11kv/6.6kvtransformer,circuitbreakers,relays,lighting, ups,battery,inverter,ECP,MCB,DB,alltypesofmotor,STPplant,ETP plant,RO plant,changeoverpanel,alltypesofAC,HVAC system, capacitorpanelboard,spinnermachine,oven,Radiofrequencydryer, sewing machine, conveyors & bagging machine, rotating equipments...etc&maintenanceofplumbingrepairpipeworkandall plumbinginstallwork.

BUILDINGCONSTRUCTION-(MEPProjects)ReadandwriteElectrical drawing&Mechanicaldrawing,testing,commissioningandinstalledDB, subDB,circuitbreakers,changeoverpanelboard,wiring-joint,glands, earthingsystem,lightingsystem,installRCCB,ECB,MCB,MCCD,install ofalltypeAC,HVACsystem etc&ExperienceinBatchingPlantandall plumbingwork.

PETROCHEMICALPLANT:- ExperienceinElectricalMaintenanceof panelboard,transformer,substation,buildingwiring,alltypesofAC, HVACsystem,motors etc.

2YEARSOFEXPERIENCEINPOWERPLANTAND SUBSTATION-

Testingandcommissioning11kv,132kvsystem,inspectionofcontrol andrelaypanel,ErectionofHT&LTtransmissionlineandsubstation, troubleshootingofalltypeselectricalequipments,machine...etc

1YEARSOFEXPERIENCEINMETROPROJECTINDUBAI-(Iamworking withQualitycontrolQC&QualityassurenceQAdepartment)3RDRAIL studied&followdesigndrawingandinstalled,followinspectionwithQC, rectifiedwork,dailyarrangematerials,workpermit,tools&safety precautions...etc

1YEARSOFEXPERIENCEIN WIPROLIMITEDPONDICHERRY-Trainee Engineer-IntegrationAssembly&TestingPC'sandsystems. EXPERIENCEOF8YEARS:

1.OOMMAAGROUPOFCOMPANIESINUAE:

(MANPOWERSUPPLIESCOMPANY)

ISelected"GeneralElectricalEngineer"postinExcellentManpower TechnicalServicesLLC.ButIlookedfollowingsite"Expolink2020 DubaiMetroProject(MEPworks&SHOWDOWNproject).

Workedasa"3rdRailForeman"inALSTOMatDubaifrom25thSEP 2018to23thJULY2019.(IworkedunderMr.AlvinTaninALSTOMTrack superintendent)

JOBRESPONSIBILITIES:

Studiedandfollowed3rdraildesigndrawingsandco-ordinationwithoursite InchargebeforeconcretemarkedinsiteEJpoint,bracketpoint,3rdRailtoRail jointpoint,CTpoint,MPApoint,HSRpoint...etc.

IfollowedinspectionandinstalledforTemplateboxswithdowel.

Ifollowedandinstalled3rdrailjoint,EJrail,MPA,Bracket,CTplate,HSR rail..etc

Ifollowedandinstalled3rdrailsafetycover,EJcover,CTcover,pasteddanger sticker..etc

Ifollowedandco-ordinationwithQC&Engineerinspectionfor3rdrailgauge, 3rarailjointElectricalcontinuitytest,CTplatecontinuitytest,EJrailgaptest, MPAgaptest,3rdrailallsafetycovergauge,3rdrailtobracket&cover insulationtest,HSRrailtippoint,brackets...etc

Sometimesproblemsiteifollowedandrectifiedinour3rdrail.

IamworkingwithQC&QAdepartment.

DailyworkstartbeforeIinformoursiteinchargeworkdetails&Iprepareand arrangedforworkpermit,materials,Tools&safetyprecautions.

WorkfinishedafterIarrangedQC&Engineerfor3rdrailinspectionandinform oursiteincharge.

Dailyifollowedandcheckedourworkerssafetyshoes,handgloves, goggles..etc

Managedprojectsfromstarttofinish,whilesupervising20-25workers.

Maintainthedailyactivitiesrecordandsenttooursiteincharge. 1.GUPTAGROUPOFCOMPANY(P)LTD,CHENNAI:

Workedasa‘ElectricalMaintenanceEngineer’in‘GUPTAHAIR PRODUCTS(P)LTD’(GUPTAGROUPOFCOMPANYBuildingconstruction& MEPindustry)atChennaifrom15thNOV2016to10thAUG2018. JOBRESPONSIBILITIES:

Operation&maintenanceof‘changeoverpanelboard&capacitorpanel board’(capacity-56kw/70kva/4ploe/250A/3phase/CTconnection).

Operation&maintenanceof‘DieselGenerator’(capacity- 28kw/35kva/440v/3phase/Brand-powerica).

Preventivemaintenanceandrepairof‘MCBswitchboard,circuitbreaker, relayswitch,controlpanelboard,fusecare,etc..

Preventivebuildingelectricalmaintenance&repairof‘tubelights&fans, constructionwiring,constructionswitchboard,(1hp,2hp,3hp)motors, waterpump,ups,intercomsystem,weighingm/c,spinnermachine,oven, etc…

Operation&maintenanceof‘Reverseosmosisplant’(drinkingwater treatmentplant(ROPLANT)(capacity-3kw/3phase/440v).

Operation&maintenanceof‘Effluenttreatmentplant’(drainagewater treatmentplant(ETPPLANT))(capacity-15kw/3phase/440v).

Operation&maintenanceof‘Sewagetreatmentplant’(STPPLANT).

Operation&maintenanceof‘Radiofrequencydryer’(capacity- 5kw/6kva/3phase/440v).

Operation&maintenanceof‘Hotwatergenerator’(capacity- 2kw/1phase/240v/Brand-Termax).

Preventivemaintenance&repairof‘sewingmachine’(capacity-(1/2hp) motor/250watts/1phase).

Repair&rewindingofceilingfan.

MaintenanceofAlltypesofACandHVACsystem.

Maintenanceofallplumbingrepairworkandnewinstallwork.

Maintainthedailypowerconsumptionrecords.

Maintainthedailyactivitiesrecords.

2.MANALIPETROCHEMICALLTD,CHENNAI:

Workedasa‘JuniorElectricalEngineer’in‘MANALIPETROCHEMICALLTD’at Chennaifrom29thAUG2014to30thSEP2016.

JOBRESPONSIBILITIES:

Operation&maintenanceofsubstations(HT,LT,switchgear,110KV switchyard).

Operation&maintenanceof(11KV/6.6KV)5.6/7.0MVATransformer– MakeAlstom.

Operationandmaintenance&SAP-PMofHV/LVpanelsof

33kv/11kv/6.6kv/440v,48MWpowerplant,circuitbreakerssuchasVCB, SF6,OCB,ACBandTransformer,Isolators,lighting,Earthswitches&Earth pits,MCC,PCC.,Allkindsofmotors&motorsstarters,capacitorbanks.

Maintenanceofmotor,powertransformer,relays,relaypanel,UPS,Battery charger,batteries,ECP(electricalcontrolpanel).

Troubleshootingofpowerwiringandcontrolwiring,lightingetc..

MaintainthealltypesofAC,HVACsystem.

Maintainthedailypowerconsumptionrecords.

Maintainthedailyactivitiesrecords.

3.GKPOWEREXPERTISEPRIVATELIMITED,CHENNAI:

Workedasa‘TraineeTestingEngineer’in‘GKPOWEREXPERTISEPVT LTD’.atCHENNAIfrom 18th JUN2012to31thJULY2014.ButIlooked followingtheysite“POWERPLANTANDSUBSTATION”inalloverindia. JOBRESPONSIBILITIES:

TestingandCommissioningofallelectricalequipmentfrom415voltsto 132KVsystem.

Inspectionofcontrolandrelaypanel,preparationoftestreportandcable scheduleforsub-station,powerplant..

Testingandcommissioningofcontrol&relaypanelfortransformer,bus coupler,bus-transfer,andlinefeeder.

Testingandcommissioningofpowercontrolcentreandmotorcontrol centre.

Testingofprotectiverelaysforvariousneeds.Experiencewithrelays.

Overcurrentandearthfaultrelays.

Knowledgeoftransformerprotection,transformerdifferentialprotection& REFprotection,busbarprotection,motorprotection,andsynchronizing scheme.

TestingofCT,PT,CVT,circuitbreaker,switchgearandpowertransformer

Operationmaintenanceofpowerplantandsubstatioin.

ErectionHT&LTtransmissionlineandsubstation(33kv).

Troubleshootingofallelectricalcircuit,controlandprotectioncircuits.

Preventivemaintenanceofallelectricalequipments.

Troubleshootingandupkeepingtheelectricalequipments,systemand protection.

Studiedandfollowedelectricaldrawings,technicalspecificationsand panellayouts.

Abilitytostudy,understandandfollowelectricalschematicsandblue prints.

Managedprojectsfromstarttofinish,whilesupervising2-3crews.

Co-ordinationwithclientinasbuiltschemedrawingsubmission,test reportsubmission.

Asbuildcableschedulesubmissionandallsiteactivitytosatisfythe customer.

Expectingspecificassignments.

Maintainthedailyactivitiesrecord.

Experiencewithrelays

*ABB-REF542,532protectionrelay

*ABB-REF615protectionrelay

*ABB-SPAJprotectionrelay

*ABBREUU/V,O/Vprotection-relay

*CDGseries–O/C&E/Frelay

*7SJ6021siemensO/CANDEARTHFAULTRELAY.

4.WIPROLIMITED,PONDICHERRY:

Workedasa‘TraineeEngineer’inuninorthrough‘WIPROLIMITED’at PONDICHERRY from03thJUN2008to31thJUN2009.

JOBRESPONSIBILITIES:

Integration-Assembly&TestingofPC'sandsystems.

.

DECLARATION:

Iherebydeclarethattheabovedetailsfurnishedbymearetruetothe bestofmyknowledge.

Place:. Yourssincerely,

Date: (KARUPPAIYAAYYANAL)



Contact this candidate