CHARLES DOUGLAS
INSTALL W/COMMISSION & INTEGRITY W/ Integrate INTO EXISTING SYSTEMS W/O SERVCS INTERRUPTION DURING HIGH,LOW TRAFFIC
LOUISVILLE, KY 40202 adc8xb@r.postjobfree.com 502-***-****
INVOLVED IN THE TELECOM INDUSTRY FOR MANY YEARS, SINCE 1996. WIRELESS, TRANSMISSION, SWITCHES 5ESS,OMNI5665
LUCENT, DMS100,250,500, SEIMENS 240, CISCO ROUTERS, FUJITSU TRIBS, TITIAN 5500, DACS, EÇHOCANS, DS1'S
3'S IN VARIOUS CLIENT PREMISE, LAN'S & COE, COLO'S, HUTS, CLOSET DROPS, UMTS, LTE, CDMA, ILEC, CLEC,
SONET, ADSL COMMISSION INTEGRATION, PIM SWEEPS. PROJECT MANAGEMENT, SITE TEAM LEAD.
AUTHORIZED US
TO WORK IN THE FOR ANY EMPLOYER
WORK EXPERIENCE
SITE TEAM LEADER
ALCATEL - SAN JOSE, CA
JANUARY 2015 TO 2019
BUDGET, THROUGH DEFINITIVE SCHEDULING,
OVERALL COSTS SAVINGS BY KEEPING THE SAME TEAM OF INDIVIDUALS WHO WITH
PLANNING, EXECUTION OF PRIORITY VARIABLES IN THE PROJECTS EQUATION SAVES TIME, WHICH ULTIMATELY IS DEFINED IN FINANCIAL
GAINS FOR THE COMPANIES, AND OR CLIENT. THEREFORE EVERYONE IS CONTENT WITH THE OVERALL COSTS PROJECTIONS FOR EVERYONE
INVOLVED.
TECHNICIAN/PROJECT MANAGER ALCATEL -
SAN JOSE, CA APRIL 2009 JANUARY
TO
2014
SAN JOSE, CALIFORNIA, CA PACBELL LINK TO EUGENE, OREGON. COMMISSION & INTEGRATION OF ADSL TECHNOLOGIES INTO
EXISTING TELECOM SYSTEMS WITHOUT INTERRUPTION OF EXISTING TRAFFIC WITH NO DISRUPTIVE INTERFERENCE
SITE TEAM LEADER CTS CORPORATION
- HOMESTEAD, FL JANUARY 2005 TO
2008
OBJECTIVE'S OF SCHEDULING PROCURED ASSIGNMENT'S MAIN FOCUS WAS TO SAVE ON PROJECT COORDINATION'S OVERALL PROJECTED
COSTS FOR THE CLIENT.
WIRELESS RAMTECH -
TRANSMISSION TECHNICIAN
BLUE SPRINGS, MO 1999 2004
TO
WIRELESS COMMISSION/INTEGRATION PROJECT OF RBS INSTALLATION OF NEW EQUIPMENT AND TESTING AND ACCLIMATE NEW
TELECOM
TECHNOLOGIES INTO EXISTING SYSTEMS THEREFORE ALLOWING THE CLIENT TO ADD TRAFFIC TO THE STANDARDIZATION
GUIDELINES OF TELCORDIA.
• adc8xb@r.postjobfree.com
• LOUISVILLE, KY
40202
•WIRELESS COMMISSION TECHNICIAN ERICSSON, I.X.C.
COMMUNICATIONS - COLUMBUS, OH FEBRUARY 1996 TO
JANUARY 1998
COMMISSION INTEGRATION OF ADSL, & LDF'S COE, LTE, CDMA, UMTS,
IN ALONGSIDE WIRELESS TRANSMISSION WORK OF
ALARMS, POWER, BATTERIES
500MCM FLEX-BUSS, PIM & F.C.C.
SWEEPS TO DECORTICATE STANDARDIZATION GUIDELINES DELEGATED BY
EDUCATION
HIGH TELECOM SWITCH & LTE,RBS,UMTS,CDMA
SCHOOL OR EQUIVALENT IN MULTIPLE FORMATS
CERTIFICATIONS TESTING MULTI-SYSTEMS - DALLAS, TX 1997 2003
FOR OF TO
HIGH SCHOOL OR EQUIVALENT
SKILL
S
• TRAINING
• INVENTORY
• MICROSOFT OFFICE
• PROJECT MANAGEMENT (5 YEARS)
• CLIENT RELATIONS
• SPREADSHEET
• SEIMENS SWITCH
• NORTHERN TELECOM DMS SWITCH
• LUCENT 5ESS, OMNI 5665 SWITCH
• TITIAN 5500, DACS, SONET, POTS, DS1-
DS3
• OC192,48,12,3'S DS1'S-
DS3'S
• FUJITSU TRIB SHELVES, PRE-FLASHWAVE
• CISCO ROUTERS
• ENGINEERING MANAGEMENT
• PROBLEM SOLVING
• EXCEL
• MICROSOFT WORD
• MICROSOFT POWERPOINT
• MICROSOFT EXCEL
• PROJECT COST MINIMALIST PLANNING
• ELECTRICAL
• TIME MANAGEMENT
• WORD
• ASSEMBLY EXPERIENCE
• SUCCESSION PLANNING
• SUPERVISING EXPERIENCE
• CONSTRUCTION
• MAINTENANCE
• NETWORKING
• ELECTRICAL ENGINEER EXPERIENCE
CERTIFICATIONS LICENSES
AND
PROJECT MANAGEMENT PROFESSIONAL (PMP)