Selected Highlights
Partnered with vendors and internal operation managers to develop project milestones, KPI metrics and timelines for projects
Effectively maintained projects status with vendors and produced detailed reports for the projects to management team
Synchronized with cross-functional teams to apply lean techniques to reduce waste, cost and streamline the workflow
Developed dashboards and reports using various tools such as Power BI, Tableau
Core Competencies
Lean Manufacturing
Warehouse & Logistics
Facility planning
Lean six Sigma green belt
Bill of materials
MS-SQL/ VBA programming
Continuous Process Improvement
Project Management
Statistical quality control
Statistical data analysis
Supply Chain management
Total Productive Maintainance
Cross functional-Collaboration
ISO 9001
SAP ERP/MRP
SMED
Warehouse slotting
Tableau/ Power BI
Professional Experience
PITNEY BOWES INC AUSTIN-TX JUNE 2019 – DEC 2019
Industrial Engineering Intern
Automated manual kitting processes, manual sorting, and material handling processes by partnering with vendors
Communicated with vendors and operation team to develop automation solutions and build KPI/Metrics and business case
Used time studies data for current manual process to find out bottlenecks in operation
Reviewed vendor’s suggested processes and worked with them and IT integration team to finalize the process
Improved overall equipment efficiency(OEE) of bark box kitting operation by 28%
Reduced workforce by 75%, saved 35% in production cost, and estimated savings of $ 0.8million per year
Got exposure to WMS Modules like client portal, inventory, pick/Ship, receiving and put away, and picking and packing portal
Worked with business intelligence team and operations team for developing capacity planning documentation for peak period
Designed new methodology for workforce optimization team to save operators cost by using demand-based scheduling method
Estimated saving of $ 0.4million for each fulfillment facility for year 2019 by proposed methodology
Worked on facility consolidation projects and developed consolidation requirement documents for vendors
Finalized design in which we were able to consolidate 43K Sq. Feet presort facility into 27K Sq. Feet area of CVG facility
Reviewed purchase orders from multiple vendors and negotiated with them to get best possible pricing
AVR TECHNOLOGIES INDIA JULY 2017 - JUNE 2018
Industrial Engineer
Used DMAIC approach to understand customer need and designed product according to required specifications
Utilized techniques such as FMEA, 5 Why’s, Pareto chart, Fishbone diagram to identify root causes and defined project charter
Conducted ANOVA and DOE to know major problems and calculated sigma level for current operations
Suggested required improvements and analyzed results by using statistical quality control tools
Assisted in continuous improvement changes for warehousing operations and implemented new systems
Worked with facility engineer to do time study analysis, Gemba walk, and applied 5S for various packing operations
Troubleshoot quality and efficiency issues on assembly line or machine operations by developing TPM
Developed operational volume forecasts and presented staffing plans to the operations team and HR team
Ensured that work group performs work according to established internal safety guidelines and procedures
SOLUTION INFOTECH INDIA MAY 2016 -JULY 2016
Project Engineer Internship
Initiated and lead ‘ silver chain making’ project to build new machine assembly for production of silver chains
Made use lean six sigma techniques to identify process bottlenecks and found out root causes behind inefficient operation
Lead continuous improvement activities(Kaizen) throughout the value stream to achieve required results
Reduced manufacturing cost by 36% and labor cost to 50% by installing belts and automatic stapling machine
Education
TEXAS TECH UNIVERSITY, United States: 2020
Master of Science in Industrial Engineering (GPA: 4.0 )
Relevant Coursework: Project Management, Design of experiments, manufacturing processes, human factors engineering, supply chain management, facility planning and design, Lean methods, Linear programming
SHIVAJI UNIVERSITY, Kolhapur, India: 2017
Bachelor of Engineering – Mechanical Engineering (GPA: 3.4)
Relevant Coursework: Total Quality Management, Manufacturing processes, Industrial Engineering, Manufacturing system design, Robotics