Kundan Rajesh Rathi (MSIE BSME CLSSGB)
• adc7m0@r.postjobfree.com • 806-***-**** • https://www.linkedin.com/in/kundanrrathi
EDUCATION & CERTIFICATIONS
MS, Industrial Engineering, Texas Tech University, TX GPA: 3.90/4.00 May 2020
BS, Mechanical Engineering, University of Pune, India GPA: 3.33/4.00 May 2017
Certified Lean Six Sigma Green Belt Udemy April 2020
Six Sigma Statistics Using Minitab 17 Udemy April 2020
PROFESSIONAL EXPERIENCE
ProPetro Services, Inc. (Midland, TX) - Research and Development Intern May-August 2019
Enhanced the efficiency of tool removal required for fracturing operations by 14% using fishbone diagram and 5why analysis
Executed process kaizen to reduce 20 mins downtime in lubricant control of the grease box during hydraulic fracturing
Analyzed & predicted the failure points on hydraulic fracturing pumps using Power BI and developed solutions for the failures
Undertook the fluid auditing for the warranty replacement and conducted cost analysis resulting savings of $1.5million
Modelled Caterpillar 3512C engine in the AutoCAD with detailed animations of its functionalities, assembly, and disassembly
Redesigned the facility layout for the fluid ends to be used efficiently for maintenance and auditing purpose in the yard
Organized warehouse applying by ABC analysis saving 3 labor hours/day in inventory picking
Ekdant Moulders & Engg. Pvt. Ltd. (Aurangabad, India) – Process Engineer (GET) June 2017-June 2018
Recorded $17500 savings by scrap reduction in manufacturing plastic bottles using DMAIC
Increased production capacity by 18% by implementing PDCA in the purging process of a plastic injection moulding machine
Managed the logs of the resins, colourants and regrind materials to be used to produce the components
Estimated manufacturing cost, process time frame and built BOM by liaising with vendors & inventory control team
Assisted in determining the supplier’s capabilities and reduced excess inventory by 15% in warehouse implementing JIT
Identified bottleneck in product line using Value Stream Mapping and reduced the cycle time of molding process by 3.6 mins
Initiated Gemba walks on the manufacturing floor and build the mutual trust with workers by solving their problems
ESSAR Steels India Limited (Pune, India) – Manufacturing Engineering Intern June-Aug 2016
Implemented 5S methodology to improve workplace safety & categorized equipment inside machine maintenance department
Proactively identifying breakdown area & taking steps to rectify the equipment through application for troubleshooting tools
Evaluated downtime and developed CAPA’s for the stoppages by organizing the production reports
Improved Overall Equipment Efficiency (OEE) by 13 % using root cause analysis and 5-Why strategies
PROJECTS
Manufacturing Facility Layout Design for Plastic Industries Aug-Dec 2019
Remodeled facility layout with the help of various layout methods and Autodesk Inventor, meeting all the constraints
Improved the design arrangement of machines within plant facilities to ensure most efficient and productive layout.
ZnO nanowires–anchored microfluidic device (Medical Device) Aug 2018 -Dec 2019
Designed and developed diseases detection medical device with a small sample size (urine samples)
Developed the SOPs for the design verification, validation, design output activities per the FDA and ISO 13485:2016 regulations
Data Analysis on Road accident in France (2005-2016) using Power BI and JMP Aug-Dec 2019
Performed ANOVA, scatter plots, residual plots, normality plots (residuals and fitted values) for statistical significance in JMP
Imported SQL server DB, created DAX queries for the generation of the columns in Power BI
Generated the interactive dashboards and reports as requested using power pivot, view, and maps
Strategic life cycle analysis of a new product (Aqua Butler): Project Management Aug-Dec 2018
Concept mapping, voice of the customer, scheduling with a task list, developed CPM, Gantt chart and PERT using MS-Project
Conducted economic analysis by calculating the NPV, IRR and PBP concepts of Project Management.
Identified risks along with their handling strategies using FMEA technique and provided key quality metrics
Core Competencies
5S Cellular manufacturing cGMP Kanban PFMEA Kaizen JIT GD&T Production Planning Bill of Material Machine Assembly Value Stream Mapping Continuous Improvement Project Management Pareto analysis Forecasting Process Control charts Blueprint Reading CNC programming (G, M Codes) Simulation Modeling MOST Data Analysis DOE
COMPUTER PROFICIENCY
Design: Autodesk Inventor CATIA KLayout AutoCAD ANSYS Solidworks HyperMesh Mastercam
Data analysis: Minitab JMP Power BI Tableau SQL Simulation: Arena Visio
Management Tools: Microsoft (Excel, Access, Project, PowerPoint) Microsoft Project Planner SAP ERP