Having total 32 years of experience in Civil Engineering, expertise in the domain of Infrastructure Construction, out of it, 10 years in Contract Management and presently working in planning, monitoring, contract management and arbitration.
Previously associated with construction of 6 lane of 24.50 Km out of 135 Km of Eastern Peripheral Expressway & 6 lane of 165 Km Yamuna Expressway and other infrastructure and Building projects. A complete understanding of the latest Road construction technology and Bridge construction. Managing sub contractors and cash flow management with costing expertise.
Earlier had 21 years of experience in Execution of Bridges, Flyovers and road projects. The core expertise being Project management, Contract management, Construction of Bridges, structure and Highways; Sewer and Drains; Procurement of Stores ; Estimating and costing etc.
TECHNICAL QUALIFICATION
# MBA (Strategy & Marketing) from Faculty of Management Studies ( FMS -Delhi University)-2018-20
#B.Tech. (Civil) from DELHI COLLEGE OF ENGINEERING DELHI, (DTU) 69.5% 1997
# Diploma in Civil Enggfrom I E R T Allahabad 82.8% 1985
Certificate courses in
‘Construction Management’ and ‘Construction Cost Estimating and Cost Control’
from Columbia University and
‘Project Management’ from University of California, Irvine Division of Continuing Education
Professional Memberships
Member of The Institution of Engineers (India) : M-1654750
EMPLOYEMENT RECORD
A.Shivalaya Construction Co Pvt Ltd
General Manager (Contract) 12.12.2016- till date
Responsibilities
Responsible for (i) Contract Management, (ii) Arbitration of ongoing cases of co. worth 200 Crores and (iii) Coordination of Construction of infra projects. Also responsible for project preparation and implementation activities, checking and review of all the designs being prepared etc
B.JAY PEE INFRATECH. Ltd. –
Dy General Manager/Project Manager (civil) 01.04.2015 -30.11.2016
Asstt General Manager/ Project Manager (civil) 15.12.2008 -31.03.2015
Responsibilities
Responsible for Contract Management, and Construction Supervision of infra projects. Undertook project site visits. Familiar with various standards/specifications/ FIDIC, contract procedures, design and quality control etc. Examined change of scope, extension of time, variation etc., project planning activities and optimum use of resources, assisted in pre- construction activities, preparing progress reports and quality assurance manuals.
C.U.P.STATE BRIDGE CORPORATION LTD.
Assistant Engineer (civil) July 1999-15.12.2008
Junior Engineer ( Civil) August, 1987 – July,1999
Responsibilities
Execution of bridge, flyovers and road projects by of effective planning and optimum utilization of man power, material and machinery. Responsible for procurement of materials and its accounts- have more than 20 years of experience simultaneously with construction works.To implement and monitor quality assurance as per prevalent I.S/I.R.C. Specifications.To control ISO 9001 implementation activities as per laid down Quality System Procedure. Preparation of DPR for more than 50 bridge projects and ROBs in districts of Bareilly, Badaun, Pilibhit and Shahajanpur (UP) Mainly one 2.00 Km long Bridge over river Sharda near Nepal Border in district Pilibhit, six majour bridge 600 m long over river Ram Ganga and eight ROB apart from other bridges ranging from 60 M to 200 M.To control of field surveys related to flow discharge calculation of rivers and to prepare and submit reports.
D.Allahabad Development Authority Allahabad
Apprentice Engineer April,1986 –March,1987
E.Maharishi Ashram Noida
Junior Engineer(Civil) July,1985 – Feb,1986
Salient features of the on going and executed Projects
Dec,2016 – till date
Arbitration cases under various Arbitration Tribunals as Authorized representative of company.
Sept,2015 – Nov, 2016
Contract management and Construction supervision of Eastern Peripheral Expressway – Package-III, (24.5KM) 6 lane excess controlled expressway having 02 nos Interchanges, 02 nos ROB, 14 nos VUPs, 27 nos PUPs and 21 nos Box Culverts with fully rigid pavement.
Sept, 2014- Aug,15
Costruction of J P University Anoop Shahar Buland Shahar (UP)
Sept,2012 - sept,2014
Project head-Contract Management & construction management of :
Yamuna river bridge in Vrindavan, Semi Circular in shape and 750 m long, connecting same bank of river . Client : PWD Uttar Pradesh
Widening and improvement of Vrindavan Parikrama Marg- 10 Km in dense city portion. Client : PWD Uttar Pradesh
Construction of 15 Km log two lane road connecting Yamuna Expressway and Vrindavan Parikrama Marg in district Mathura
Construction of main Sewer line and storm water drainage along Parikrama Marg
2009-2012
Contract Management & Construction of access controlled 6 lane Expressway between NOIDA and Agra with service roads on both side and associated facilities (extendible to 8 lane)Length : 165 Km, in the state of Uttar Pradesh. BOT Project. Concessioner: Jaiprakash Group. Project Cost : 1000 million (approx)
Expressway includes,
Interchange : 06 nos
Vehicular Underpass: 32 nos
ROB: 01 no
Car track/ Padestrian crossings: 123 nos
Major Bridge : 01 no
Minor Bridge : 51 nos
Culverts: 299 nos
2008
Widening of NH 24 to four lanes, a NHAI project, looking after under passes/ overpasses/ Flyovers with Open foundation/ pile foundation, PSC super structure and RE wall approach falling in Km 55 -101.
2006-2007
Constructed four river bridges(60 M to 200 M long)in Bareilly, Badaun, and Pilibhit districts of UP, with well foundation, and PSC girder and RCC deck super structure.
Construction of Rail Over bridge 1.50 Km long in Bareilly cityUttarPradesh. Cost of project : 15 Cr
2004-2006
Const of 1080 M long Bridge over river Ganga on AnoopShahar- Gawa- Sambhal – Moradabad road disttBulandShaharUttarpradesh Bridge has 36 span of 30 m each with PSC Girder and RCC deck in super structure and 5 m dia well foundation, 32 m deep. Cost of Project 20 Cr
2004
Constructed two river bridge two lane (60 M to 200 M long) along with approaches, in district Badaun, of UP, with well foundation, and PSC girder and RCC deck super structure.
2000-2004
Construction of major river bridge on TAWI river in Jammu ( J&K)Well Foundation 18 m deep, driving in conglomerate rocks, which were found below 6-7 m depth.With cast in situ PSC box girders 64 m span.
1998-2000
Construction of six lane Flyover in Mulund Mumbai, Maharashtra,Constructed with open foundation, and superstructure of pre tensioned pre casted steam cured PSC girder in specially developed factory, Central span - cast in situ PSC Box girders.
1997
Construction of Clover leaf at ITO Flyover New Delhi, with 2X 100 m continuous span of PSC voided slab in sharp curvature.
1989-1997
Construction of six lane Flyovers at Chirag Delhi New Delhi with foundation : 1200 mm dia bored cast in situ RCC piles,Superstructures: Pre tensioned pre casted, steam cured PSC girder, casted in specially developed factory at Bhati mines Delhi.Central three spans were cast in situ PSC Box girders with max span of 64 m.
Construction of six lane Flyovers at Tilak Nagar New Delhi, at Jail Road and Najafgarh road intersection with foundation : 1200 mm dia bored cast in situ RCC piles,Superstructures: Cast in situ PSC girder.Central three spans were cast in situ PSC Box girders with max span of 35 m.
1987-1989
Construction of BhagarNalah Bridge in District Ghazipur Uttar Pradesh, well foundation, RCC pier and RCC Slab type super structure.
1986-1987
One year in Allahabad Development Authority as App. Engineer
1985-1986
Nine months (05/1985 to 02/1986) in Maharishi Ashram NOIDA as CIVIL ENGINEER and executed building work,finishing work etc.