Post Job Free

Resume

Sign in

Manager Plant

Location:
Vijayawada, Andhra Pradesh, India
Posted:
May 02, 2020

Contact this candidate

Resume:

RESUME

NAME OF THE APPLICANT : K. VENKATA SUBBAIAH

PASSPORT NUMBER : M6345457

DATE OF BIRTH : 26TH AUGUST 1959.

PERMANENT ADDRESS : 18/519 AMMAVARISALA STREET, PRODDATUR POST – 516360KADAPA DIST. (A.P), INDIA.

CONTACT No: & Email : +918*********; adc1u7@r.postjobfree.com

EDUCATIONAL QUALIFICATIONS : EDUCATION YEAR OF PASS

1. S.S.C. 1975

2. L.M.E. 1978

3. B.TECH(MECH) 1988

4. P.G.D.I.T. 2001

EXPERIENCE : TOTAL 40 YEARS. (Daily products-7 yrs, Breweries-2 yrs, and Cement Plants – 31 yrs)

BRIEF INTRODUCTION: Resently Retired person. Lastly I worked as Manager Mechanical at NCC, Yemen to looked after the Mechanical maintenance activities of Total Cement Plant, budget preparations for spares planning, inventory maintain, shutdown planning, preventive and predictive maintenance schedules implementation, upgradation of plant.

Earlier worked as General Manager – Engineering to look after the Mechanical and Electrical department of Bagalkot cement Inds. Ltd since 21st April 2015.

Previously worked as Group Lead Manager Mechanical reporting to Unit Head, responsibilities are to look after the Mechanical maintenance activities of Total Cement Plant, budget preparations for spares planning, capex planning, inventory maintain, shutdown planning, preventive and predictive maintenance schedules implementation, Upgardation of plant and machinery etc.

Project handled recently atNov 2014, in RCC,OMAN, Line#3 Kiln ESP conversion into Bag filter, Project is taken up completed in 21 days of time.

Similarly taken up the project modification in JAYPEE REWA CEMENT, Line #1 is upgraded from 1 mtpa to 1.5 mtpawhere asmajor changes of new Preheater - 5stage, VRM Raw mill and Coal mill separators changing, cooler conversion to IKN, etc are completed in 45 days stoppage of the plant.

Key functions:

Bottle Neck Identification and take remedial action.

Analysis of Chronic problems related to plant equipments to suggest solutions to over come the problems and to implement.

Contribution to develop Reusable Engineering Knowledge.

Analyze spare parts that failing frequently and to take required counter measures while ordering next time like revise technical specification, modify design, insist for better quality.

Monitoring of equipment failures and take preventive action to avoid re occurrence.

Looking into Energy conservation potentials and propose measures to reduce the energy consumption.

Manage Minor or Medium size projects including layout design, equipment selection and sizing required for New project.

Budget preparation for capital expenditure with justification.

Pay due attention for the Standardization of consumable spares during up grade or New Equp. Installation stage.

Preparation of work orders and contract documents for contractors.

Providing reqd data, details and drawings to the suppliers for making precise proposals.

Technical Analysis for various proposals and making comparative statement.

S.N.

NAME & ADDRESS OF

FROM

TO

DESIGNATION

NATURE OF WORK

ORGANISATION

*

NCC, YEMEN

26-11-2016

30-11-2019

MANAGER MECH

HEAD OF MECHNICAL DEPT.

1

BAGALKOT CEMENT & INDUSTRIES LTD.

21.04.2015

10-11-2016

G.M. – ENGG.

HEAD OF ENGG DEPT. (MECH,ELEC,CIVIL,)

2

RCC, OMAN

08.07.2014

18-01-2015

GROUP LEAD MANGER MECH.

HEAD OF MECHANICAL DEPT. FOR THE ENTIRE PLANT

3

NCC, REPUBLIC OF

22.06.2011

22.06.2014

HOD (MECH)

HEAD OF MECHANICAL DEPT. FOR THE ENTIRE PLANT OF 1.5 MTPA CAPACITY.

YEMEN

(Manager-Mech)

4

RHINO CEMENT, KENYA

23-11-2010

15-06-2011

HOD (MECH)

INCHARGE FOR ENGG. DEPT

FOR THE ENTIRE CEMENT

PLANT AND LIME MFG.

PLANT.

5

INDIA CEMENTS LTD

10.05.2010

16-11-2010

G.M.(ENGG)

INCHARGE FOR ENGG. DEPT.

CHILAMKUR,

FOR THE ENTIRE PLANT OF

A.P.

1.5 MTPA CAPACITY.

6

JAYPEE REWA CEMENT,

01-04-07

07-05-2010

G.M.(MECH)

INCHARGE FOR CEMENT

JAYPEE NAGAR-486450

01-04-05

31-03-07

DY.Gen.Mgr (M)

PLANT UI CENTRE LINE TO

(M.P.) INDIA

Sr. Manager

LOOK AFTER OPERATION &

MAINT. Upgradation of Plant.

(Mech)

MAINTENANCE INCHARGE

07-11-99

31-03-05

CHIEF

FOR U-I CENTRE LINE,

VERTICAL MILLS AND COAL

ENGINEER

HANDLING SYSTEM

INCLUDING CRUSHER,

STACKER AND RECLAIMER,

WORKED AS SECTION

24-12-90

11-02-94

SR.ENGR.

INCHARE OF ROLLER MILL,

(MECH)

COAL CRUSHER, COAL

STACKER AND RECLAIMER

TO LOOK AFTER THE

OPERATION AND

MAINTENANCE.

7

VASAVADATTA

07-11-97

01-11-99

MANAGER

WORKED AS OPERATION

AND MAINT. INCHARGE

CEMENT, SEDAM-585222

(KARNATAKA) INDIA

(MECH)

FOR BALL MILLS, ROLLER

PRES AND MAINT.

INCHARGE FOR TOTAL

PACKING PLANT.

17-05-89

30-11-90

MECH.ENGR.

INCHARGE OF ROLLER

MILL, L.S.CRUSHER

STACKING AND

RECALIMING SYSTEM.

8

D.L.F.CEMENT LIMITED,

15-02-96

01-11-97

DY.MANAGER.

WORKED AS TEAM LEADER

FOR COMMISSIONING OF

THE ENTIRE PLANT

EQUIPTS. AND MACHINERY

(FROM L.S.CRUSHER TO

PACKING PLANT) AFTER

COMMISSIONING I

WORKED AS INCHARGE TO

LOOK AFTER THE

CEMENT MILL, P/P

RABRIYAWAS-306101

(MECH)

(RAJASTHAN) INDIA

9

RAJASTHAN BREWERIES

14.02-94

14-01-96

DY. MANAGER

WORKED AS INCHARGE

LTD., SHAJAHANPUR,

(MECH)

FOR MECHANICAL DEPT.

ALWAR DIST.

TO LOOK AFTER THE

OPRATION AND MAINT. OF

(RAJASTHAN) INDIA

UTILITIES DEPT. AND

MAINTENACE OF BEER Mfg

PROCESSING AND PACKING

SECTIONS.

10.a

COROMANDEL CEMENT,

19-04-86

15-05-89

ASST.ENGR.(M

WORKED AS A ASSITANT

CHILAMKUR-516316

ECH)

TO AREA INCHARGE OF

(A.P.) INDIA

PLANT FOR A PERIOD OF 1

YEAR & THEN PUT ME IN

SHIFTS TO LOOK AFTER

THE ENIRE PLANT FOR

MECH. MAINTENANCE.

WORKED IN THE

PLANNING DEPT. ALSO.

b.

INDIA CEMENTS LTD

10.05.2010

16-11-2010

G.M. (ENGG)

INCHANGE FOR ENGG.

(COROMANDEL CEMENT)

DEPT. FOR THE ENTIRE

CHILAMKUR,

PLANT OF 1.5 MTPA

A.P.

CAPACITY.

11

C.D.C.M.P.U.LTD,

17-09-79

29-06-84

MECHANIC

WORKED AS SHIFT

PRODDATUR MILK

(MECH)

MECHANIC TO LOOKAFTER

FOODS LTD,

THE MAINTENANCE OF ALL

SECTIONS (RMRD, MILK

PRODDATUR-516360

PROCESSING, MILK

CUDDAPAH DIST.(A.P.)

PACKING, BUTTER

MAKING, GHEE MAKING &

PACKING,POWDER MAKING

PLANT, UTILITIES DEPT. OF

WATER,BOILER,

REFRIGERATION SECTIONS

ETC.)

30-06-84

17-04-86

CHARGEMAN

INCHARGE FOR ALL

(MECH)

MECHANICAL ACTIVITIES

OF MECHANICAL DEPT.

INCLUDING SPARES

PLANNING.

12

MYLAVARAM DAM,

07-03-79

19-09-79

APPRENTICE

WORKED As APPRENTICE

WORKSHOP AND REPAIR

TRAINEE

TO LEARN THE REPAIR

SECATION, SUB DIVISION

(MECH)

AND MAINTENANCE OF

ALL EQUIPMENTS AND

NO-II, MYLAVARM,

MACHINERY USED IN DAM

JAMMALAMDUGU TQ,

CONSTRUCTION.

CUDDAPAH DIST. (A.P.)

K.VENKATA SUBBAIAH

APPLICANT



Contact this candidate