RESUME
NAME OF THE APPLICANT : K. VENKATA SUBBAIAH
PASSPORT NUMBER : M6345457
DATE OF BIRTH : 26TH AUGUST 1959.
PERMANENT ADDRESS : 18/519 AMMAVARISALA STREET, PRODDATUR POST – 516360KADAPA DIST. (A.P), INDIA.
CONTACT No: & Email : +918*********; **********@*****.***
EDUCATIONAL QUALIFICATIONS : EDUCATION YEAR OF PASS
1. S.S.C. 1975
2. L.M.E. 1978
3. B.TECH(MECH) 1988
4. P.G.D.I.T. 2001
EXPERIENCE : TOTAL 40 YEARS. (Daily products-7 yrs, Breweries-2 yrs, and Cement Plants – 31 yrs)
BRIEF INTRODUCTION: Resently Retired person. Lastly I worked as Manager Mechanical at NCC, Yemen to looked after the Mechanical maintenance activities of Total Cement Plant, budget preparations for spares planning, inventory maintain, shutdown planning, preventive and predictive maintenance schedules implementation, upgradation of plant.
Earlier worked as General Manager – Engineering to look after the Mechanical and Electrical department of Bagalkot cement Inds. Ltd since 21st April 2015.
Previously worked as Group Lead Manager Mechanical reporting to Unit Head, responsibilities are to look after the Mechanical maintenance activities of Total Cement Plant, budget preparations for spares planning, capex planning, inventory maintain, shutdown planning, preventive and predictive maintenance schedules implementation, Upgardation of plant and machinery etc.
Project handled recently atNov 2014, in RCC,OMAN, Line#3 Kiln ESP conversion into Bag filter, Project is taken up completed in 21 days of time.
Similarly taken up the project modification in JAYPEE REWA CEMENT, Line #1 is upgraded from 1 mtpa to 1.5 mtpawhere asmajor changes of new Preheater - 5stage, VRM Raw mill and Coal mill separators changing, cooler conversion to IKN, etc are completed in 45 days stoppage of the plant.
Key functions:
Bottle Neck Identification and take remedial action.
Analysis of Chronic problems related to plant equipments to suggest solutions to over come the problems and to implement.
Contribution to develop Reusable Engineering Knowledge.
Analyze spare parts that failing frequently and to take required counter measures while ordering next time like revise technical specification, modify design, insist for better quality.
Monitoring of equipment failures and take preventive action to avoid re occurrence.
Looking into Energy conservation potentials and propose measures to reduce the energy consumption.
Manage Minor or Medium size projects including layout design, equipment selection and sizing required for New project.
Budget preparation for capital expenditure with justification.
Pay due attention for the Standardization of consumable spares during up grade or New Equp. Installation stage.
Preparation of work orders and contract documents for contractors.
Providing reqd data, details and drawings to the suppliers for making precise proposals.
Technical Analysis for various proposals and making comparative statement.
S.N.
NAME & ADDRESS OF
FROM
TO
DESIGNATION
NATURE OF WORK
ORGANISATION
*
NCC, YEMEN
26-11-2016
30-11-2019
MANAGER MECH
HEAD OF MECHNICAL DEPT.
1
BAGALKOT CEMENT & INDUSTRIES LTD.
21.04.2015
10-11-2016
G.M. – ENGG.
HEAD OF ENGG DEPT. (MECH,ELEC,CIVIL,)
2
RCC, OMAN
08.07.2014
18-01-2015
GROUP LEAD MANGER MECH.
HEAD OF MECHANICAL DEPT. FOR THE ENTIRE PLANT
3
NCC, REPUBLIC OF
22.06.2011
22.06.2014
HOD (MECH)
HEAD OF MECHANICAL DEPT. FOR THE ENTIRE PLANT OF 1.5 MTPA CAPACITY.
YEMEN
(Manager-Mech)
4
RHINO CEMENT, KENYA
23-11-2010
15-06-2011
HOD (MECH)
INCHARGE FOR ENGG. DEPT
FOR THE ENTIRE CEMENT
PLANT AND LIME MFG.
PLANT.
5
INDIA CEMENTS LTD
10.05.2010
16-11-2010
G.M.(ENGG)
INCHARGE FOR ENGG. DEPT.
CHILAMKUR,
FOR THE ENTIRE PLANT OF
A.P.
1.5 MTPA CAPACITY.
6
JAYPEE REWA CEMENT,
01-04-07
07-05-2010
G.M.(MECH)
INCHARGE FOR CEMENT
JAYPEE NAGAR-486450
01-04-05
31-03-07
DY.Gen.Mgr (M)
PLANT UI CENTRE LINE TO
(M.P.) INDIA
Sr. Manager
LOOK AFTER OPERATION &
MAINT. Upgradation of Plant.
(Mech)
MAINTENANCE INCHARGE
07-11-99
31-03-05
CHIEF
FOR U-I CENTRE LINE,
VERTICAL MILLS AND COAL
ENGINEER
HANDLING SYSTEM
INCLUDING CRUSHER,
STACKER AND RECLAIMER,
WORKED AS SECTION
24-12-90
11-02-94
SR.ENGR.
INCHARE OF ROLLER MILL,
(MECH)
COAL CRUSHER, COAL
STACKER AND RECLAIMER
TO LOOK AFTER THE
OPERATION AND
MAINTENANCE.
7
VASAVADATTA
07-11-97
01-11-99
MANAGER
WORKED AS OPERATION
AND MAINT. INCHARGE
CEMENT, SEDAM-585222
(KARNATAKA) INDIA
(MECH)
FOR BALL MILLS, ROLLER
PRES AND MAINT.
INCHARGE FOR TOTAL
PACKING PLANT.
17-05-89
30-11-90
MECH.ENGR.
INCHARGE OF ROLLER
MILL, L.S.CRUSHER
STACKING AND
RECALIMING SYSTEM.
8
D.L.F.CEMENT LIMITED,
15-02-96
01-11-97
DY.MANAGER.
WORKED AS TEAM LEADER
FOR COMMISSIONING OF
THE ENTIRE PLANT
EQUIPTS. AND MACHINERY
(FROM L.S.CRUSHER TO
PACKING PLANT) AFTER
COMMISSIONING I
WORKED AS INCHARGE TO
LOOK AFTER THE
CEMENT MILL, P/P
RABRIYAWAS-306101
(MECH)
(RAJASTHAN) INDIA
9
RAJASTHAN BREWERIES
14.02-94
14-01-96
DY. MANAGER
WORKED AS INCHARGE
LTD., SHAJAHANPUR,
(MECH)
FOR MECHANICAL DEPT.
ALWAR DIST.
TO LOOK AFTER THE
OPRATION AND MAINT. OF
(RAJASTHAN) INDIA
UTILITIES DEPT. AND
MAINTENACE OF BEER Mfg
PROCESSING AND PACKING
SECTIONS.
10.a
COROMANDEL CEMENT,
19-04-86
15-05-89
ASST.ENGR.(M
WORKED AS A ASSITANT
CHILAMKUR-516316
ECH)
TO AREA INCHARGE OF
(A.P.) INDIA
PLANT FOR A PERIOD OF 1
YEAR & THEN PUT ME IN
SHIFTS TO LOOK AFTER
THE ENIRE PLANT FOR
MECH. MAINTENANCE.
WORKED IN THE
PLANNING DEPT. ALSO.
b.
INDIA CEMENTS LTD
10.05.2010
16-11-2010
G.M. (ENGG)
INCHANGE FOR ENGG.
(COROMANDEL CEMENT)
DEPT. FOR THE ENTIRE
CHILAMKUR,
PLANT OF 1.5 MTPA
A.P.
CAPACITY.
11
C.D.C.M.P.U.LTD,
17-09-79
29-06-84
MECHANIC
WORKED AS SHIFT
PRODDATUR MILK
(MECH)
MECHANIC TO LOOKAFTER
FOODS LTD,
THE MAINTENANCE OF ALL
SECTIONS (RMRD, MILK
PRODDATUR-516360
PROCESSING, MILK
CUDDAPAH DIST.(A.P.)
PACKING, BUTTER
MAKING, GHEE MAKING &
PACKING,POWDER MAKING
PLANT, UTILITIES DEPT. OF
WATER,BOILER,
REFRIGERATION SECTIONS
ETC.)
30-06-84
17-04-86
CHARGEMAN
INCHARGE FOR ALL
(MECH)
MECHANICAL ACTIVITIES
OF MECHANICAL DEPT.
INCLUDING SPARES
PLANNING.
12
MYLAVARAM DAM,
07-03-79
19-09-79
APPRENTICE
WORKED As APPRENTICE
WORKSHOP AND REPAIR
TRAINEE
TO LEARN THE REPAIR
SECATION, SUB DIVISION
(MECH)
AND MAINTENANCE OF
ALL EQUIPMENTS AND
NO-II, MYLAVARM,
MACHINERY USED IN DAM
JAMMALAMDUGU TQ,
CONSTRUCTION.
CUDDAPAH DIST. (A.P.)
K.VENKATA SUBBAIAH
APPLICANT