SOUMAYBRATA DASTHAKUR
S/O – MADAN MOHAN DASTHAKUR
VILL- BAKSHITALA,P.O.- KHANYADIHI
P.S.- KOLAGHAT, DIST – PURBA MEDINIPUR
PIN- 721641, WB – INDIA PH NO -961-***-****/
E-mail : adc1fm@r.postjobfree.com
OBJECTIVE
To be part of a company which encourages creativity,innovation and excellence where I can apply my technical and leadership skills to challenging projects in a team environment.
EDUCATION QUALIFICATION
EXAM PASSED
YEAR OF PASSING
BOARD
% OF MARK
MADHYAMIK
2007
W.B.B.S.E.
60.30%
10+2(H.S)
2011
W.B.S.C.V.E.T.
80.83%
DIPLOMA IN CIVIL ENGINEERING
2013
W.B.S.C.T.E.
74.30%
DESIGNATION
PRESENTLY I WORK AS A SITE ENGINEER (CIVIL).
WORKING EXPERIENCE
Duration of work: From 06/05/2013 to till date
Company name : KALIKA ENGINEERING in Kolkata
1st Project,13 vents sluice (R.C.C) Including 5KM bituminous Road ( 3.00M wide) and with canal Side slope Lining over on Dabu Canal, Dabu, Canning, 24 PGS(S). Under I&W.D.
Project Duration : From 2013 – 2015 September
PROJECT DESCRIPTION :-
To complete the project over this canal we were followed some working steps these are—
First of all we had to construct a branch canal for beneficiary of continuing Agricultural process and also the canal have High tide and Low tide flow. In monsoon time the canal plays a big role for flooding over the area, that’s way we had to excavated earth work for for flowing of water besides the project. Next earth work excavation at below G.L (-1.550mt R.L), where constructed P.C.C work and R.C.C bed over the Mass bed of concrete . Next we constructed 12 nos of pier and both sides abutment wall (R.L +3.735). After that finally we layed deck reinforcement for deck slab casting including two sides footpath.
REINFOCEMENT USED – 20,16,12,10 DIA OF BARS.
GRADE OF CONCRETE USED – M10,M15,M25.
CLIENT: - IRRIGATION AND WATERWAYS DEPARTMENT
2nd Project A Arch Girder Bridge (R.C.C) at Kalighat,Over Tolly’s Nullah ( I& WD)
Project Duration : From 2016 – 2017 March.
PROJECT DESCRIPTION:-
To completed the work over the canal we were followed some working steps these are –
First of all the 9.00 m length of M.S sheet piles were driven around the foundation area of both sides bank (u/s and d/s). Then the damp area were filled up by gunny bags for making of platform. Next we constructed the 900 mm dia of R.C.C bored piles. Then earth work excavation for bot. lvl. Of pile cap (-4.100 m R.L), also we completed the construction if pile cap and then settled out the taught alignment of Arch Girder. After completing of both bank abutment we prepared for deck slab casting with finished the work of staging over the flowing canal by ISMB 200,300. Next completed the deck slab curing period we layout of Arch Girder by helping AutoCAD 2D drawing and given ordinates input. Finally we constructed the typical Arch Girder and after completing the 28 days of curing we released the shuttering with staging from Mid span of bridge to both banks ends symonteneously.
REINFORCEMENT USED --- 25,20,16,12,8 MM DIA OF BARS.
GRADE OF CONCRETE USED—ALL WORKS WAS DONE BY M35.
CLIENT ;_ IRRIGATION AND WATERWAYS DEPARTMENT.
ON GOING PROJECT : G +V FLOOR BUILDING AT HINDUSHAN PARK,KOLKATA- 29
ROLE / ABILITY ON FIELD
Act as the main technical advisor on a construction site for subcontractors, crafts people and operatives.
Set out level and survey the site also testing grade of concrete which is used at site.
Check plans, drawings quantities for accuracy of calculation.
Ensuring that all materials used and work performed are in accordance with the specifications.
Managing, monitoring and interpret the contract design documents supplied by the client or Architect.
Liaise with any consultants, subcontractors, supervising, planning, quantity surveying and the general work force involved in the project.
Ability to achieve the targets as per specification and with in the budget time.
KEY SKILL
Be self motivated, diligent and able to carry out site responsibility.
Manage all constructional works.
Handling the site work in tough situations.
EXPACTED SALARY
As per current CTC for my profile or to be judge at site work progress.
AREAS OF INTEREST
SITE ENGINEERING
PLANNING AND DESIGNING
QULITY CONTROL
COMPUTER SKILLS
APPLICATION SOFTWARE : AUTOCAD(2D),PHOTOSHOP,MS- OFFICE,EXCEL
EXREA CURRICULAM ACTIVITY
COMPLETED THE TRAINING ON BUILDING PROJECT FROM MACKINTOSH BURN LTD. IN 2013, JANUARY
PERSONAL DETAILS
NAME : SOUMYABRATA DASTHAKUR
DOB : 25/01/1991
SEX : MALE
MARITAL STATUS : UN MARRIED
NATIONALITY : INDIAN
LANGUAGES KNOWN : ENGLISH,BENGALI, HINDI
PASSPORT NO : S0029761
PAN NO . : EEBPD5260L
ADHAR NO. : 407*********
HOBBIES
PLAYING INDOOR & OUTDOOR GAMES.
PARTICIPATE IN SOCIAL ACTIVIES.
DECLARATION
I HEREBY DECLARE THAT THE ABOVE FURNISHED DETAILS ARE TRUE TO THE BEST OF MY KNOWLEDGE AND I BEAR THE RESPONSIBILITY FOR THE CORRECTNESS OF THE ABOVE – MENTIONED PRATICULARS.
YOURS TRULY,
DATE : (SOUMYABRATA DASTHAKUR)
PLACE: