Resume

Sign in

General Manager MEP

Location:
Mumbai, Maharashtra, India
Salary:
40000
Posted:
April 30, 2020

Contact this candidate

Resume:

Qualifications:

Education:

Bachelor of Mechanical Engineering from Bangalore University, INDIA, Completed in August 1999 passed with First Class- Distinction (76.3 %).

Contact Details:

E-mail: adc0ue@r.postjobfree.com, adc0ue@r.postjobfree.com

Skype: danishmdr77

Mobile: +91-916*******, 858-***-**** (India), +974-********(WhatsApp)

Date of Birth: 31st August 1977.

Nationality: Indian

Languages: English, Hindi, Urdu, Arabic (Some Bit)

Experience:

Field Experience:

Construction & Project Management: Project Planning & Control, Cost Estimate, Control & Monitoring, Techno-Commercial Bid Evaluation, P & L Responsibilities, Design Package Review & Approval, Inspection, Expediting, Testing & Commissioning and Handing Over.

Well experience in project documentation, meetings, coordination with client, vendor and related authority. Having experience in Project monitoring, scheduling, cost estimate and coordination with various department and clients to complete the work in cost effective manner and within the specified time frame. Having experience in interview, shortlisting, developing MEP Department/ Team with the help of HR department.

Design and Detail Engineering: Review, Checking and Approval of Complex Design Package comprising of arrangement of shop drawings, Selection of equipment’s (Chiller, Pumps, AHU, FCU, Exhaust Fans etc.), Pump head calculation, ESP calculations, Isometric drawings, Pipe, Duct Support, selection Constant & Variable Spring Support, Piping & Ducting Bill of Materials & Pipe Support Bill of Material, Finalization of Scope of Work, Execution Plan to Complete the Project in Cost effective Manner & within the time frame. Having experience in meeting with consultant for design review, ITP, material submittal and its technical approval.

Codes & standards/Specification: Fully aware with the codes (ASHRAE, IPC/NPC, NFPA, QCS etc.) Specification for various mechanical items like Cooling Towers, Air Cooled Chillers Chilled Water Pumps, Package Air conditioner, AHU, FCU, Exhaust & supply Fans, Water Heaters, Sanitary Wares, Booster Pumps, Fire Pumps, Sprinkler system, ACV/ZCV, Breeching inlet, FHC, Fire Hydrants, FM200, Novec1230 system and FLS etc., pipe & fitting for various service system.

Current Position (September/2018 – till date)

General Manager –MEP, Lodha Group@ Mumbai Location

Lodha- The Park Project (T1, T4, T6, Club House)

Registrations / Certifications/Appreciation/Membership

Saudi Council of Engineers : Registered (No.: 155217), since 2011.

Membership of the American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE), since June 2017.

Exam Preparation Course: CFPS & PMP certification from Chicago training Center, Doha, Qatar, completed April 2018.

Auto-cad Rl.14, from CADD Centre Training Services, Bangalore in April-May 1998.Have working knowledge with AutoCAD 2007.

Certificate Course in H.V.A.C. & Allied Fields from TECHADEMY, Bangalore in October 1999, passed with First Class-Distinction.

Professional Project Management Program successfully completed in April 2018.

Achieved Certificate of Appreciation for Al-Othman tower project from main contractor to finish the job on time.

Achieved twice performance bonus with Burt Hill within 1 &1/2 year of working duration.

Ms-Office. Worked with Aconex Project Management Software in Motor city Project with BurtHill.

Linkedin Profile: http://www.linkedin.com/pub/mohammed-danish-rasheed/43/406/934

Lodha Developers, Mumbai, India (Sep 2018- till date)

Working as a General Manager (MEP)

Project Detail : Lodha - The Park Project (Residential Towers Complex)

Located in Parel West, south Mumbai, with a 6 numbers High-rise residential Towers (which includes B1-B4, RCP-7200nos approx., 7nos Podium, and A Club House with all amenities and L01-L80 residential floors buildings). It’s land area is 17 Acres. T01- Allura Tower

T04- Trump Tower

T06-

Club House, which consists 3nos swimming pools, Gym, Kitchen -2nos, Banquet Hall- 2nos, Restaurants, Kids Zone, Badminton Court etc.

Client : Lodha Developers

Designer : MEP-Buro Uphold, UK, Architect: WOHA Architect PTE Ltd. & Kapadia Architects

Structural: Magnusson Klemencic Associates.

Contractor : Godrej & Boyce, Sri Padmavati, Pravin Electricals, Sterling & Wilson.

Project Management/CR : Lodha Developers.

ASTAD Engineering Consultancy & Project Management, A QP & QF joint venture company, Doha,Qatar (Feb 2015- August 2018)

Worked as a Sr. Mechanical Engineer Site Supervision & Cx

Project Detail : National Muesum of Qatar (NMOQ) replaces the existing museum,

located in the historic Fariq Al Salatah Palace, with a world class museum and research facility whose mission will be to tell the story of the past, present and future of Qatar through artifacts, multimedia content and cultural events. The scope, scale and innovative design of the NMOQ will make it an architectural and cultural landmark that will attract visitors from around the world.

Client : Qatar Museums Authority

Designer : ARUP

Contractor : HDEC (Hyundai Engg & Construction) & BK Gulf, Qatar.

Supervision Consultant : Hill International

Project Management/CR : ASTAD Engineering Consultancy & Project Management.

Worked as a Sr. Mechanical Engineer Site Supervision & Cx

Project Detail : PMS (People Mover System)/ Tram Rail is a mixed use project at Education city campus, consisting of Tram Depot, 25nos Tram station above ground and 2nos Tram station viaduct, 8nos. TSS (Tram sub-stations), Tram rail track for 11kms. It includes Infrastructure, Irrigation and Landscaping.

Client : Qatar Foundation

Consultant : Design & Build by STC (Siemens Tram Consortium).

Designers: Worley Parsons and WSP. Contractor: HLG, Qatar.

Supervision Consultant : ASTAD Engineering Consultancy & Project Management.

Project Management/CR : ASTAD Engineering Consultancy & Project Management.

Worked as a Commissioning Mechanical Engineer

Project Detail : QP District is a mixed use campus consisting of 9 high rise buildings, 5* Hotel, Data Center, Central Chilled Water Plant (9 Water cooled Centrifugal Chillers with 2350TR capacities (8duty & 1standby), Induced draft CT5nos (4duty & 1standby), 9nos each Condenser, Primary, Secondary pumps (8duty & 1standby) and ETS room etc., 66kV Substation - total area 700000 m2. It includes Internal Infrastructure, Irrigation and Landscaping. Project cost approx. US$3.5 billion.

Client : Qatar Petroleum

Consultant : Design by KEO.

Project Management : QPM – Qatar Project Management

Client representative : ASTAD Project Management

Job responsibilities:

Ensuring and approving as Client representative for the installation, supervision, testing and commissioning of the complete HVAC, Plumbing, Drainage, Fire-Fighting & special services (Garbage Chute system, Elevators etc.).

Ensuring and approving the supervision of the output of the pre testing & commissioning by third party (SIBS, ComTech)

Involved in the development of the commissioning plan, system scoping documents, testing and commissioning method statements and break out programs.

Responsible for the review of commissioning documentation, systems manuals, As-built drawings, O&M manuals.

Involved in the preparation of PR (Proposal Request) by the client, Variation claim, value engineering.

Leading the follow-up & meetings for QCDD, MOT, MOI, Ooredoo, Woqod inspection and approval request upload documents, handing over meetings with clients etc.

Beijing Construction Engineering Group, A China govt. owned MNC, Saudi Branch (April 2013- Jan 2015)

Worked as a MEP Manager

Project Detail : Royal Commission Head Quarter (Basement + 20th Floor Office) Tower Project, Yanbu Al Sinaiyah (First Tower at Yanbu) LEED Project. It includes Central Chilled Water Plant (3 Water cooled Centrifugal Chillers with 460 TR capacities (2duty & 1standby), Induced draft CT 3nos (2duty & 1standby) & TES Tank, 3CHW Pumps etc.), Internal Infrastructure, Irrigation and Landscaping.

Client : Royal Commission Yanbu & Jubail

Consultant : Design By Al Mutlaq & Bu-Nuhyah & ACT (Associated Consultant Team),

Re-design by Parson USA.

Project Management : SAPL (Saudi Arabia Parson Limited)

Job responsibilities:

Representing & leading the client/consultant meeting of behalf of BCEG

Leading MEP department in the internal meetings i.e. Civil Department meeting and conducting MEP internal meeting.

Involved in awarding the contract with the contract department to the sub-contractor in close co-ordination with the contract department.

Leading the FAT visit at Mitsubishi Chillers at OSAKA, Japan. DG set (Caterpillar) at Yanbu.

Taking part to resolve all the techno – commercial issues related to MEP work.

Leading MEP team to achieve target in a professional way as per project requirement.

Managing all vendors, sub-contractors (Zamil for Chillers, ELV, Honeywell for BMS, Schneider for Busbars, ThyssenKrupp (TK) for Elevators, and Caterpillar for DG etc.)

Responsible for the supplier negotiation, ordering with budget control, the preparation of PR (Proposal Request) for the client, variation claim, value engineering.

Responsible for the manpower forecast required to complete the project on time, within the budget with good quality workmanship.

Completely responsible for the quantity take off, material submittal approval, sample submittals, shop drawing preparation and its technical approval from the consultant.

Completely responsible to manage MEP technical team and MEP procurement team.

Responsible for the interviewing, shortlisting of MEP candidates (Sr. Engineer / Engineer/ MEP Draftsman/ Supervisor/Foreman/Trade artisans etc.) to develop company MEP team.

Job responsibilities includes (As a Consultant & Construction/Project Management):

Responsible and assuring the site inspections, opening/ penetration checking as per shop drawing, installation of system as per shop drawing, material submittals, and project specifications.

Responsible for reviewing and approval for the checking of shop drawings based on design drawings, material submittals based on project specifications prior to its approval.

Responsible for reviewing and approval for the material inspection & site work installation inspection based on project specifications & approved material submittal, prior to its approval.

Reviewing and responsible for the checking of pump head calculation for chilled water pumps, potable water transfer pumps & external static pressure for AHU, FCU & Exhaust Fans.

Responsible for reviewing and acceptance of Hydraulic calculation of Fire Sprinkler system etc.

Responsible for reviewing and approval for the inspection & approval of underground drainage, manhole connection, external water supply (GRE pipes), external Fire hydrants and storm water line besides the internal road, Fire-Pumps installation, sprinkler system installation, ACV/ZCV installation, Breeching inlet installation, Chiller and cooling tower installation, AHU installation, CHW piping installation, ducting installation, etc.

Responsible for the RFI & RFC replies that raised by the main contractor.

Responsible for the preparation of the site progress weekly report and the meeting with QS (Quantity Surveyor) team for the approval of cost variation.

Representing Mechanical Department in the meeting with Client, Project Management & Main Contractor.

Assuring the acceptance of the pre-commissioning & commissioning inspection of the mechanical services.

Mustang Al-Hejailan Dar PI, A Woods group company, Saudi Branch (Oct/2011- March/2013)

Worked as a Sr. Mechanical Engineer (HVAC, PL, DR, FF, Medical Gases, Pneumatic system)

Project Detail : King Abdullah Centre for Cancer & Liver Disease Hospital, Royal Wing Building & its Central Plant Riyadh Saudi Arabia, is an expansion project of King Faisal Specialist Hospital & research Centre. It’s 25 floor + 2basements hospital building including infrastructure development & renovation of existing hospital building.

Client : King Faisal Specialist Hospital & research Centre

Consultant : Design By Dar Al-Riyadh & Cannon design, Supervision by Mustang-HDP Consultant.

Project Management : Client PMD (Project Management Division) Office.

Main Contractor : Al- Bawani

Reason of Leaving : For career enhancement (Project was at completion stage)

DIWI Consult International, Gmbh, Makkah Al- Mukarramah, KSA Branch (May /2009- Feb /2011)

Worked as an Assistant Resident Engineer (Mechanical)

Project Detail : Jabal Omar Development Project Makkah Mukarramah, Saudi Arabia, is facing Grand Mosque, comprising construction of 38 towers with heights ranging between 20 and 48 stories with rating 4 to 6 star hotels (i.e. Hilton, Westin, Hayat Regency, Sheraton, The Oberoi, Sas-Radisson, Le Meridian, Sofitel Trident, Marriot, Crown plaza, Moven & pick, Four Season, Four point etc. and including infrastructure development.

Client : Jabal Omar Development Company

Consultant : Design by Dar Al-Handsa, Supervision By Diwi Consult Int.

Project Management : Abnia Consulting Engineers /Hill International

Main Contractor : Saudi Bin Ladin Group & Saudi Oger Limited

Reason of Leaving : Our company contract finished & further not extended by the Client. If required letter

to be submitted in support.

BurtHill Kosar Rittelman (An USA based consultant) Dubai Branch, UAE (Sept /2007-March /2009)

Worked as a Mechanical Engineer (HVAC, PL, DR, FF)

Project Detail : F1 Theme Park &Marriott Hotel

Client : Union Properties

Consultant : Burt Hill Inc.

Project Management : Confluence

Quantity Surveyor : Faithful & Gould

Main Contractor : Bouygues Batiment International (BBI, France based company)

Worked as Mechanical Inspector (HVAC, PL, DR, FF)

Project Detail : Al-Furjan – Show Village & Sales Center, Jebel Ali, UAE. 14 Nos.-

Luxurious sample villas & its infrastructure (i.e. 3BR, 5 BR, 6 BR with swimming pool) & its sales centre.

Client : Nakheel

Consultant : Burt Hill

Project Management : Turner

Main Contractor : Larsen & Toubro Limited

Reason of Leaving : Economy crisis affected very badly Dubai.If required letter to be submitted in support.

Job responsibilities includes (As a Contractor):

Responsible for the preparation of material submittal as per project specification & QCS (Qatar Construction Specification).

Responsible for the bargaining with suppliers & preparation of price comparison based on budget & project specification.

Responsible for the checking of shop drawings of check print before submitting for approval to the consultant.

Responsible for the material requisitions, quantity take off & seeing all activities at Al-Othman Tower (Basement+ G+21 Floors) residential building at West Bay, Doha.

Responsible for the material requisitions, quantity take off & seeing all activities at 7 Substations for the KAHARMAA (Electricity Board) of Qatar.

Responsible for the material requisitions, quantity take off & seeing all activities at Expansion & Renovation of Hamad Aquatic Center (Basement+G+5 Floors) & four multipurpose Training Halls (G+1 Floor) for various clubs in Qatar.

Responsible for the pump head calculation and static pressure calculation of AHUs for Hamad Medical City District Cooling Air Cooled Chiller Plant (24,000TR Capacity).

Responsible for the duct re-sizing/re-routing, air outlets selection based on consultant comments. Also, selection of chilled water piping.

Responsible for the value engineering for the system based on cross verification of the design, shop drawing preparation, material selection etc.

Responsible for the pump head calculation for chilled water pumps & external static pressure for Package Air Conditioner Units for various projects.

Responsible for the flushing, pre- testing & pre-commissioning of the HVAC system, water supply & drainage.

Responsible for the laying of UG drainage, above ground drainage, sanitary wares & domestic water (hot & cold) system installation.

Responsible for the installation fire hose reel cabinet, sprinkler system & fire extinguishers.

Responsible for the preparation for the variation claim with the QS team for the project.

Responsible for the testing, adjusting, balancing (TAB) & commissioning works of all the system.

THERMO (L.L.C.), Dubai, UAE (Nov /2006 - July/2007)

Worked as a Sr. Project Engineer (HVAC)

Project Detail : Motorcity Area-1, 15 Nos.-Residential Towers (Basement+ Ground

Floor+3Parkings+ 16th Floor) at Dubai Auto- Drome

Client : Union Properties

Project Management : Edara

Consultant : Burt Hill (MEP Consultant –WSP)

Main Contractor : Al-Naboodah Laying O’rourkee

MEP Cost : AED 285 Millions (Approx.)

Reason of Leaving : Got opportunity to work as a consultant.

How United Services (W.L.L.), (UK based an Inter Serve Group Company), Doha, Qatar (Oct/2005 – Sep /2006)

Trags Electrical Engineering and Air conditioning, Doha, Qatar ( August /2004 – July /2005)

Worked as a Mechanical Engineer (H.V.A.C., Plumbing & Fire- Fighting)

Project Detail : Al-Othman Tower (Basement+G+21 Floors), Residential Building

at West Bay, Doha

Client : Private Owner (Mr. Othman)

Consultant : AEB (Arab Engineering Bureau)

MEP Cost : QR 28 Millions (Approx.)

Project Detail : Substations (11KV, 66KV, 132KV, 220KV) – 7nos for Karharmaa

Client : QEWA (Qatar Electricity & Water Authority)

Consultant : P B Power, Design & Built By How United With QEA

MEP Cost : QR 20 Millions (Approx.)

Project Detail : Four Multi-Purpose Training Halls for Various Sports Club

Client : QNOC (Qatar National Olympic Committee)

Consultant : QEA (Qatari Engineers Associates)

MEP Cost : QR 16 Millions (Approx.)

Project Detail : Qatar Sports Club

Client : (Qatar National Olympic Committee)

Consultant : QEA (Qatari Engineers Associates)

MEP Cost : QR 20 Millions (Approx.)

Reason of Leaving : Contract completed with the employer.

Diamond Construction Company, Jharkhand, India, (Nov /1999 – Feb /2003)

Worked as a Site Engineer (HVAC)

Project Detail : Apollo Group Hospital, worked for Blue-Star

HVAC Cost : INR. 2 Millions (Approx.)

Reason of Leaving : For career enhancement.

Personal Details

Excellent health, able to relocate the work, self-motivated.

Directed, Energetic, Enthusiastic & Hardworking.

Personal Details

Date of Birth : 31/ August / 1977

Marital Status : Married with 2-Daughters, 1-Son

Father’ Name : Mr. Mohammed Rasheed Uddin, Retired as Deputy Chief Engineer (Civil) with Coal India Ltd.

Religion : ISLAM

Nationality : Indian

Place of Birth : Hazaribag, Bihar

Passport Number : L4556921, issued@Jeddah On 09/12/2013, Expiry date: 08/12/2023

Driving License Details : Holding Dubai driving license (LMV), validity till 2017.

: Holding Qatar driving license (LMV), validity till 2020.

: Holding Saudi driving license (LMV), validity till 2018.

: Holding Indian driving license (LMV), validity till 2027.

Permanent Address Present Address

Mohammed Danish Rasheed Mohammed Danish Rasheed

#7, Phul Bagan Road, 3rd Floor,

Post: Entally

Kolkata/Calcutta, Pin Code-700014

West Bengal, India

Tel: +91-983******* Mobile: +91-858*******

Father’s mobile: +91-943*******

References : Mr. Bilal Daas (Commissioning Manager)

ASTAD PMT

Mobile: +974-********

Email: adc0ue@r.postjobfree.com

Mr. Nurani Krishnan (Site Construction Manager)

Now in QDC, Before ASTAD

Mobile: +974-********

Email: adc0ue@r.postjobfree.com

Mr. Salah Attia Abdelzaher ( Infra. Dirctor)

Jabal Oman Development Co.

Mobile: +966-*********

Email: adc0ue@r.postjobfree.com

More reference will be provided, if required.

Salary

Last CTC Drawn : QAR32,200 /- per month (Basic: QAR 17,000/- per month + QAR13,200/-as HRA +QAR2,000/- per month as TA)+Site Transport+ Family Status + Health Insurance for self and family, AXA star plus + 3 kids education expense & transport expense (QR250/- per month per kid) + Yearly Paid 30days leave after completion of every 12month + Family Air Ticket up to India+ Bonus + Telephone allowance QR 225/- per month + Furniture Allowance QR 45,000/- paid one time + Car purchase allowance QR 20,000/- + Yearly Healthcare/ Gym allowance QR 8,000/- + Gratuity: one month salary per year. Working Hours: 48hrs maximum per week, 5 days a week. If necessary, supporting documents will be provided.

Current CTC : INR 4.5million per annum. If necessary, supporting documents will be provided.

Expected CTC : Negotiable.

Notice period : 60 days maximum as per job agreement (but it is negotiable to 30-45 days).

Joining : Mutually to be agreed.

Career Achievements:

Total Work Experience: 20+ Years

Gulf Experience (Qatar, Dubai & Saudi Arabia): 15+ years

Indian Experience: 5+ years

A Mechanical Engineer with more than 20+ years of experience. I am involved in inception till hand over the projects i.e. Tram-Rail, Tram -Rail Depot, Museum, High rise buildings, five-star hotels, airport, luxurious villas, hospitals, commercial complexes, institutional and industrial buildings (substations) and infrastructure projects.

I am fully familiar with HVAC, Plumbing, Drainage, Fire-Fighting systems and allied building services. Fully aware of Codes and standards (ASHRAE, IPC/NPC, NFPA etc.).

Areas of expertise include design, estimation, evaluation, erection, installation, planning, pricing, procurement, shop drawings, material submittal, progress reports, manpower management, payment certificates, cash flow, and settlement of claims, variation orders, value engineering, supervision, tendering, testing & commissioning (ITP), Operation & maintenance during Defective liability period (DLP) and Handing over of complete HVAC system (i.e. Central Chiller plants/District cooling plant, AHU, FCU, Precision Units and it’s CHW piping and ducting networks), Smoke extract & Ventilation system, Staircase pressurization system, Battery room extract system, Elevators, potable water network, drainage, storm water lines, sanitary wares, LPG, Pneumatic system, medical gases system and Fire-Fighting system (i.e. Fire Pump, Sprinkler system, FHC,FE, Fire Hydrants, ACV/ZCV, Breeching inlet, FM200, Novec1230 system and FLS).

Fully familiar with the LV/MV system & ELV system. Having full working electrical knowledge required for building services but not an expert, i.e Light & Small Power System, Low Voltage distribution network, RMU, DG, ELV i.e. BMS, FA, PA, AV, ISS etc.

Worked in projects cost value range (US$4.26 million to US$S 3.2billion approx.)



Contact this candidate