E&I QA/QC ENGINEER

REGU.T

adbzvj@r.postjobfree.com,

Mobile No: +91-801*******(INDIA)

+91-978*******

SUMMARY

Having 9+ years of relevant experience in India and Abroad in Petrochemical Plant, Refinery, Gas plant, construction, commissioning and maintenance works as an ELECTRICAL and INSTRUMENTATION QA/QC ENGINEER. I am fully conversant with the NEC International Code and SABIC standard procedures. And I was successfully completed my Primavera version P8.2.And have complete Knowledge on Roser Syetem Work Pack preparation and QA QC input preparation.

Profile

Full knowledge on Roser system for E&I Work pack preparation and updating progress and QA QC Document hand over.

Regular surveillance/inspection of construction and maintenance activities as per project inspection and test plan.

Assign and monitor respective duties of other QC inspectors

Store and maintain all quality records.

Coordinate with execution personnel about ongoing inspection issues.

Regular reporting to QC Manager, on any major issues which require immediate action.

Ensure proper implementation of ISO 9001.

QC inspection for instrumentation system as per quality control procedure, c.

Familiar with the international standards NEMA, NEC, IEEE.

Responsible for completing all electrical work (Installation of 20 MVA Transformer,

2.5MVA (4.16/0.42kv), Distribution Transformer, 34.5/4.16KV switchgear/MCC Panels, NGR, Capacitor Bank, Variable Speed Drive system, LCS/MS, Heat Tracing System (HTP), Cable Pulling, Termination, Cable Tray Work, Grounding, lighting, lightning arresters etc.).

Inspection of primary and secondary cable tray installation conduit installation instrument installation impulse line, air tube installation and pressure test, glanding,

Termination, meggering & continuity test junction box installation marshaling.

Ensuring all instrument were installed & tested as per project quality procedure

And project specification and prepare ITP forms.

Preparing RFI for Inspection to client for joint inspection of completed.

All activities during the construction commissioning& maintenance of control cable meggering and measuring earth resistance test. Ensuring all instrumentation were installed and tested as per project quality procedure and project specification and preparation of ITP forms for instrument installation and maintenance inspection.

Coordination with pressure testing team of impulse lines and preparation of ITP forms and Test Reports.

To ensure that all inspection and test records are properly documented and made available to the client on completion in accordance with contract requirements.

Review of design, construction and maintenance related document conducting material inspections.

Conduct all instrument inspection as per Approved ITP.

Prepare non-conformance with the customer’s representative to ensure good quality.

Mechanical completion acceptance from execution and responsible for recording and clearing all instrumentation punch list and documentation.

Ensure that inspection are performed in a timely manner and recorded as per specification and standard detail drawing ITP’s and QCP’s

Witness of fire and gas loop checking, process loop check, instrument loop wiring continuity, instrument loop folder release forms.

Issuing material discrepancy reports for any deficiency.

Issuing non-conformance report (NCR) for the discrepancies of works.

Inform client representative by the official application of inspection and arrange the joint inspection according to relevant ITP.

Receive the execution RFI and determine execution works status i.e. check installation conformity to project specification.

Education Qualification

SSLC

Percentage of Mark : 90 % (First Class2003)

HSC

Percentage of Mark : 81 % (First Class 2005)

Technical Qualification

BE-ECE (Electronics and Communication Engineering)

Percentage of Mark : 65 % (First Class)

Year of Passing : 2009

University : Anna University

Familiarized and deep understanding of industry codes and practices-API-RP-550 (Manual for installation of refinery instruments and control system) ISA, NEC/NFPA, NEMA &IEEE.

SOFTWARE EXPOSURE

Operating system : Win 98, Win Xp, Win 7, Win 8, MS Office, Roser System, Primavera.

Award received : Appreciation from Qatar Pearl QTL for successful QC completion of MTA1 and MTA2. Permit receiver at Satorp, Appreciation from Satorp for successful completion Of E&I package preparation.

Technical software : Certified person (Primavera - Computerized project planning and management).Have Roser user ID in the Roser system.

OVERSEAS PROJECT &WORK HISTORY

MAINTANENCE SHUTDOWN EXPERIENCE

COMPANY : Madina group WLL.Qatar.

CLIENT : SHELL GTL LTD.

PROJECT : PEARL GTL TRAIN 1 Ta-18.

ROLE : E&I QC INSPECTOR.

DURATION : FROM 7THDec 2017TO 4TH April 2018.

COMPANY : Arabian pipeline & Services co.Ltd.,KSA

CLIENT : Satorp.

PROJECT : Saudi Aramco total refinery and petroleum Project.,Jubail.

ROLE : E&I QA/QC Engineer.

DURATION : FROM 19THJul 2016 TO Aug 2017.

Understand and study the scope received from Client and have a full Knowledge by provided documents.

Prepare documents required for the site visit from the access provided by client.

In Roser system prepare the QA QC inputs for the turnaround scopes such as ITP and checklist for ZV stroke checking, CV overhauling, transmitters calibration, Operation related instrumentation repairs such as Major and minor and Electrical motor overhauling, Switch gear and transformer preventive maintenance and overhauling.

Update phase progress and claim work progress for E&I QA/QC tasks.

Ensure static and rotatic planner if there any activities involved in instrumentation or electrical scope.

Prepare and attach the ITP and check list for the E&I activities.

Give the Inputs to the material planner to prepare spare parts required.

Make sure while execution all scope was covered.

Make sure after completion of each and every scope loop check and function check was completed.

Give the input to the static and rotating related instrumentation and electrical activities.

Make sure after the execution completion progress was claimed.

Preparing QC inputs and execution for MOC project scopes.

Make sure with QC personnel if there is any hold point to release from roser system.

Make sure with QC personnel mechanical completion and final walk through was completed.

Ensure final handover document was prepared and submitted prior to commissioning.

COMPANY : KENTECH, QATAR TECHNICAL SERVICES, WLL.

CLIENT : SHELL GTL LTD.

PROJECT : PEARL GTL TRAIN 2

ROLE : E&I QC INSPECTOR.

DURATION : FROM 7THJan 2016 TO 30TH April 2016.

COMPANY : KENTECH, QATAR TECHNICAL SERVICES,WLL.

CLIENT : SHELL GTL LTD.

PROJECT : PEARL GTL TRAIN 1

ROLE : INSTRUMENT QC INSPECTOR.

DURATION : FROM 7THJan 2015 TO 4TH April 2015.

Regular reporting to QA/QC ENGINEER & discussion with on any major issues which required immediate action. And handling QVD (quality verification department)

Ensuring all maintenance instruments were repaired, installed and tested as per project quality, such as

Using Roser system, preparing all the documents required for the Instrumentation and Electrical Maintenance activities.

Replacement of Flow serves valve positioner.

Valve Overhauling -needs to remove and re install the SOV and limit switch connections(Tubing and Cabling)

Anti-Surge valve repairing (assisting vendor)

Redas system(assisting vendor)

SIA system checking

IPF testing

GWR level transmitter removing,cleaning and reinstalling

QMI sample Probe replacement.

Hydraulic valve Overhauling

Dp type level transmitter replacement(including tubing)

Governor valve repairing(assisting vendor)

Install partial stroke test facilities

Removing and reinstalling Transmitters after the completion of repair.(PT,TT,FT)

Coriolis transmitter removal, stem checking and cleaning if required after reinstallation.

Assign and monitors respective duties of other QA/QC inspector.

Store and maintain all quality records for client.

Coordinate with execution personal about ongoing inspection issues.

Inspection witness for all the hazardous area instrument maintenance and execution.

Prepare and submit ITP and check list for the completed E&I Activities.

Ensure with Area Planner to claim the Phase progress after each and every activities completed.

Ensure to release the WP/HP if any completed E&I activities at site.

Prepare and submit the final mechanical completion documents prior to commissioning.

LONG TERM / CONSTRUCTION EXPERIENCE:

COMPANY : Mechanical Contracting Services Company

CLIENT : Tatweer Petroleum

PROJECT : 3 Khuff wells NAG PROJECT, Bahrain

ROLE : E&I QC ENGINEER.

DURATION : FROM 24TH April 2018 TO 29TH July 2018.

COMPANY : KENTECH, GULF HOLDINGS

CLIENT : EXON MOBIL CEPU LTD.

PROJECT : BANYU URIP PROJECT, INDONESIA

ROLE : E&I QC ENGINEER.

DURATION : FROM 4TH April 2015 TO 15THOct 2015.

COMPANY : GULF ASIA CONSOLIDATED CONTRACTING LLC.

CONTRACTOR: JGC ARABIA COMPANY

PROJECT : SADARA AROMATICS PROJECT (SADARA)

ROLE : E&IQA/QC ENGINEER.

DURATION : FROM SEP 2013 TO AUG 2014.

COMPANY : NASSER.S.AL.HAJRI.CORPORATION, JUBAIL

CONTRACTOR: FLUOR ARABIA COMPANY

PROJECT : SUPER ABSORBENT POLYMER PROJECT (TASNEE)

ROLE : E&I QA/QCENGINEER.

DURATION : FROM OCT 2012 TO AUGUST 2013.

COMPANY : NASSER.S.AL.HAJRI.CORPORATION, JUBAIL

PROJECT : LDPE PROJECT SABIC (SAUDI KAYAN)

ROLE : INSTRUMENTATION QC INSPECTOR.

DURATION : JAN 2012 TO SEP 2012

Monitoring of all Electrical and Instrument activities and proper QC guide lines to the sub-contractors and coordinate QC people to complete the Inspections.

Preparing punch list items, making surveillance of execution activities.

Witness for all electrical testing activities.

Witness of instrument calibration.

Maintenance of cable tray, conduit, junction boxes, instrument system, instruments.

Coordination with client in pressure testing of impulse lines& Air Lines

Ensuring al maintenance instruments were repaired, installed& tested as per project quality procedure, project specification and preparation of ITP forms (E& I maintenance)

Inspection for all activities during the installation, maintenance and commissioning.

Daily inspection and surveillance for ongoing construction activities .coordinate with execution and raising RFI for inspection with client

Carried out inspection of main and branch cable tray, conduit, instrument

Installation, glanding and termination of primary &secondary cable, IR

and continuity test, impulse line, air tube installation and pressure test, Junction box

Panel maintenance and maintenance of all type instrument etc.

Ensuring all instruments were installed and tested as per project quality

Assign and monitors respective duties of other QA/QC inspector.

Store and maintain all quality records for client.

Coordinate with execution personal about ongoing inspection issues.

Ensure proper implementation of ISO 9001.

Regular reporting to QA/QC Manager discussion with on any major issues which required immediate action.

Final preparation of various drawings such as P&ID, Logic Drawing, Wiring diagram, Instrument loop diagrams.

EXPERIENCES IN INDIA:

Worked as an E&I QA/QC for Tamilnadu Petro products limited at Chennai and HOFFINCONS at UDUPI, India. Having good expertise in maintenance & commissioning of instruments, PLC systems, Review of Loop drawing, Hook-up, QA/QC documents, FAT, SAT and Engineering documents preparations.

SHUTDOWN EXPERIENCE

Plant : UDUPI POWER CORPORATION LTD.

Capacity : 600MW X 2

Client : LANCO

Location : Kuthethoor, Karnataka, India.

Scheme : Boiler, Steam Turbine, Ash Handling System, Flue Gas Desulphurization.

Automation: Invensys DCS, Allen Bradley PLC.

Duration : Sep 2014

TAMILNADU PETROPRODUCTS LIMITED, Chennai

ROLE : E&I QC INSPECTOR.

Duration : May 2009 – Nov2011

Worked in Cut fast Division of the ISO 9002:2000 and ISO 14000 PUBLIC SECTOR organization.

Responsible for the all types of Electrical panel testing and installation and process instrumentation, installation, tubing (Pneumatic and process hookup), cable Tray,Instrument Installation Cable testing, laying, glanding and termination, function test, loop checking, instrumentation and system, fault finding and troubleshooting of process instrumentation during commissioning period.

Final preparation of various drawings such as P&ID, Logic Drawing, Wiring diagram, Instrument loop diagrams.

Responsible for all types of Electrical and instrumentation, maintanence, tubing (Pneumatic and process hookup), cable Tray,Instrument Installation Cable testing, laying, glanding and termination, function test, loop checking and system handover.

Job Knowledge

Familiar with the following international Standards & Codes.

F A T - Factory Acceptance Test.

S A T - Site Acceptance Test.

PERSONAL INFORMATION

Name T.REGU

Fathers Name T.THANGASWAMY

Date of Birth 20/05/1988

Nationality Indian

Language English, Hindi, Tamil, Malayalam

Passport No L8933930

Date of Issue 23-04-2014

Date of Expiry 22-04-2024

Marital status Married.

Religion Hindu.

Contact no +91-801*******

+91-978*******

Skype ID regu4ever

PLACE: Chettikulam SIGNAUATRE

REGU.T



Contact this candidate