Resume

Sign in

Piping Safety

Location:
Victoria, TX
Salary:
28.00
Posted:
February 25, 2020

Contact this candidate

Resume:

Richard A Rodriguez

**** ****** ****, ********, ** 77904

361-***-****

adby6m@r.postjobfree.com

Objective

Reliable pipefitter/pipefitter foreman with an extensive track record in demanding, fast paced construction environments.

Certifications

NCCER Certified

Current TWIC Card exp. 07/14/2020

Skills

1. Ability to read and draw Advanced Blueprints such as: pipe plans, P. ID, three dimensional (isometric), piping and support specifications above/underground.

2. Achieved the quality, standards and specifications of materials such as: carbon steel, low temperature grades, high yield grades, arctic high yield grads, sour services (low temperature), chrome molly grades, stainless steel austenitic grades, martensitic grades, ferritic grades and nickel alloys.

3. Ability to test pipe systems and equipment such as: vessel trim, systems turnovers, packages and weld mapping.

4. Excelled in advanced pipe fabrication such as: pipe, butt weld and threaded.

5. Ability to use with expertise, tools such as: hand/power tools, threading machine and all other specific tools that were needed for specific individual jobs on site, (wrench, hammer, screwdriver, grinder, beveling machine, torch, torque wrench, air impact gun, surveying tools).

6. Used with confidence and safety, machinery such as: forklifts, manlifts, 15-ton picker and overhead cranes.

7. Maintained maintenance of installing new tubing/piping.

8. Performed daily maintenance of compressors and pumps.

9. Worked as a pipefitter foreman on some jobs, overseeing about 10-12 employees at a given time.

Office/Computer Skills

1. Microsoft (Word, Access, Outlook)

2. Data Entry

3. Filing

4. Time Sheets

5. Fax, Copier, Scanner, Printers

6. Typewriter

7. 10-key Calculator

8. Multi Line Phone System

9. Intercom System

10. Shipping/Receiving

Experience

PCL

Sulphur, LA

Pipefitter

11/2018 - Current

1. Fabricate Pipe

2. Install new piping

3. Bolt up valves and piping

4. Set up pumps and equipment

5. Pull permits for sites

6. Attend daily safety meetings

7. Operate fork lift, JLG lifts, threading machines

8. Expedite material and tools necessary for jobs

H.B. Zachry Construction

Corpus Christi, TX

Pipefitter Foreman

02/2018 - 08/2018

1. Weld Mapping

2. Fabricate pipe

3. Installed new piping

4. Bolt up valves and piping

5. Hydro tested pipes

6. Ability to read and comprehend Icometric Drawings

7. Operate fork lift, threading machine, grinders

8. Attend daily safety meetings

9. Pulled permits for sites

10. Supervised a crew of 12, which included 4 welders, 5 pipefitters and 3 helpers

11. Installation of underground pipe

Kiewit Corporation

Ingleside, TX

Pipefitter

08/2017 - 12/2017

1. Bolt up valves and piping

2. Disassemble/assemble exchangers

3. Fabricate and install pipe

4. Demo existing pipe

5. Fit pipe for welders

6. Install supports

7. Attend daily safety meetings

8. Hydro tested pipe

9. Expedite material and tools necessary for job

10. Release stress from pumps

11. Run screw pipe

12. Operate fork lift, threading machine, grinders, power tools

Bechtel OG&C Construction

Pipefitter

Corpust Christi, TX

04/2017 - 07/2017

1. Installed new piping in racks

2. Installed Supports

3. Set equipment/pumps, etc

4. Fabricated new Spools for erection

5. Tie ends on ground piping, pumps and equipment

KBR Construction

Pipefitter

Corpus Christi, TX

10/2016 - 01/2017

1. Installed new piping in racks

2. Fit/Welded

3. Bolt up valves and piping

4. Install Supports

5. Hydro Tested pipe

6. Fabricated new Spools for erection

C.C.C. Construction

Port Lavaca, TX

Pipefitter

04/2016 - 6/2016

1. Fabricated Pipe

2. Installation

3. Demoed pipe

4. Hydro Tested Pipe

I.C.S. Construction

Seadrift, TX

Maintenance

07/2013 – 06/2015

1. Bolted up spools and valves

2. Ran and installed tubing

3. Demo piping

4. Disassembled/assembled pumps

5. Did drawings for new fabrication

6. Performed maintenance on compressors, air hoists, forklifts

7. Ability to perform safe welding procedures

8. Went to daily safety meetings

9. Inputted time sheets for myself and crew

10. Performed visual inspections on trolleys and chain hoists

11. Rotating call outs every other week

Everson Construction

Shreveport, LA

Pipefitter Foreman

03/2013 – 07/2013

1. Ran the fabrication shop

2. Ordered new material that was needed for certain jobs

3. Shipping/Receiving when materials arrived

4. Supervised a crew of 10 pipefitters and welders

5. Attended daily safety meetings

6. Filled out daily progress reports

7. Weld mapping

Jacobs Construction

Pasadena, TX

Pipefitter Foreman

02/2011 – 02/2013

1. Supervised a crew of 12 pipefitters

2. Hydro tested pipe

3. Installed new piping

4. Attended daily safety meetings

5. Inputted time sheets for crew and myself

6. Filled out daily progress reports

7. Demoed old piping

J.E. Merit Construction

Pasadena, TX

Pipefitter Foreman

01/2010 – 02/2011

1. Fabricated new pipe

2. Installed new pipe

3. Supervised a crew of 15 pipefitters and welders

4. Inputted time sheets for myself and crew

5. Installed supports

6. Attended safety meetings

7. Weld mapping

Turner Industries Incorporated

Corpus Christi, TX

Pipefitter Foreman

12/2007 – 11/2009

1. Demoed old piping

2. Installation of new pipe

3. Oversaw a group of 8 pipefitters

4. Attended regular safety meetings

5. Ordered new materials when needed

6. Shipping/Receiving of material

7. Inputted daily progress reports and time sheets

8. Performed safety audits on employees at random

H.B. Zachry Construction

Pasadena, TX

Pipefitter Foreman

03/2000 – 10/2007

1. Shipping/Receiving

2. Installation of new pipe and lube oil pipes to units

3. Worked on turbines

4. Installed supports

5. Installation of underground pipe (high density pipe)

6. Hydro tested pipe

7. Supervised a crew of 12 pipefitters

8. Attended daily safety meetings

9. Inputted progress reports and time sheets

Tepsco Construction

Lolita, TX

Pipefitter

01/1999 – 01/2000

1. Fabricated and then installed pipe

2. Bolted up valves and spools

3. Fitted pipe for welders

4. Released stress from pumps

5. Expedited tools that were needed for specific job from tool shop

6. Gathered materials that were needed

7. Able to read and comprehend blueprints for certain jobs

8. Set pumps to pump elevation coordinates

Brown and Root Construction

Houston, TX

Pipefitter

04/1993 - 12/1998

1. Bolted up valves and piping

2. Disassembled/assembled exchangers

3. Fabricated and installed pipe

4. Demoed existing pipe

5. Fitted pipe for welders

6. Installed supports

7. Attended daily safety meetings

8. Hydro tested pipe

9. Expedited material and tools necessary for job

10. Released stress from pumps

11. Ran screw pipe

12. Operated fork lift, threading machine, grinders, power tools

References Available Upon Request



Contact this candidate