Resume

Sign in

Electrical Engineer Assistant

Location:
Riyadh, Saudi Arabia
Salary:
6000
Posted:
February 23, 2020

Contact this candidate

Resume:

Fawad Sajid (Electrical & Instrument Engineer) Address: Jubail, Ksa

Mobile: 057*******

E-Mail: adbx15@r.postjobfree.com

CAREER OBJECTIVE:

A capable, proven and self-motivated Electrical & Instrumentation Engineer with extensive experience of carrying out the installation of electrical & Instrumentation components and systems maintenance, trouble-shooting.

Seeking to get a career oriented job in a professional environment that offers utilization of my skills and provide learning opportunities to keep place with advanced technologies.

EXPERIENCE SUMMARY

Have 05 Years Self-motivated, team oriented experienced in Electrical Construction projects, Maintenance, Pre-commissioning and Commissioning of H.V Equipment’s experience in large scale of Substation, chemical and Petrochemical industries.

Ability to learn quickly, follow the procedure exactly, solve The problems independently and always willing to accept significant responsibility and involvement and working knowledge of international codes and QA/QC standards and their application to the operation.

EDUCATIONAL QUALIFICATION:

B.Sc Electrical Engineer

PROFESSIOANL QUALIFICATION

Electrical Safety (NEBOSH IGC 1)

PLC and SCADA

IOSH

Electrical auto cad

PROFESSIONAL EXPERIENCE:

E&I Qc inspector

Al Jubail Petrochemical company – SABIC JUBAIL

Project: Replacement of Olefin II Cold Box with

Enhanced and improved design

Duration: 6 months

SITE SUPERVISOR- Electrical & Instrument

Saudi Aramco- GOSP khuraise

Project: Waster Heat Boiler Replacement Project

Installation of GIS 380kV for ABB.

Installation of 110kv surge arresters.

500kva auxiliary transformer erection and termination.

Termination of M.V cables of 630mm OF 13.8KV.

Installation of 13.8kv capacitor bank for cooper power Germany.

Installation of cable gland, seal and conduit sealing.

Termination of switchgear 380kv control cables.

Installation and termination of LCC Panels.

Installation and Termination (LCC) of 110kv GIS for Hyundai Korea.

High pressure test for transformer for leakage.

Installation of switch gears for 33kV.

Installation of switch gears for13.8kV.

Installation of Switch gears

Erection of capacitor bank and termination for 33 and 13.8 kV

Power distribution for substation internal.

Power receptacles, HVAC Power Panels

Termination for indoor outdoor lighting panels on photocell.

Installation of cable tray and conduits.

Lighting for GIS HALL (High bay and Low Bay)

Main ACDB Main DCDB SDB installation and termination.

(F.C.U installation lying of LV cables.

Installation of D.B transformers.

Installation of distribution boards.

Earthing for lightning protection.

Installation of cable gland, seal and conduit sealing.

E.M.T piping ridged steel piping.

Installation of Cable tray.

Wiring for fire alarm circuit.

Wiring for normal and emergency lighting.

Security lighting for boundary walls.

Constuction Engineer - E & I

Al-Jubail Petrochemical Company- SABIC JUBAIL

Project: Install Custody Meter in Pygas Export Line

Supervise the installation of new custody meter

Excavation of cable trench of 300m for power and instrumentation cable

Installation of RGS rigid conduit from custody meter to pipe rack elevation of 15meters

Cable laying from substation to filed JB

Insulation Resistance, continuity test for cable before and after installation

Termination of cables in field JB and inside Substation

Installation of new area lighting system

Installation of FT and PG and ensure calibration as per vendor recommendations

Earting for new pygas skid and new installed conduits

Ensure the compliance of all Quality control system as per client requirement and approved PQP

Ensure the compliance of all safety systems as per client requirement and approved EHSS Plan.

Ensure project is executed as per scope of work and approved drawings. In case there is any change from approved design, get approval from management prior to execute the change in field.

Prepare MOS as per project scope of work and get it approved by client

Participate in preparation of JSA and add inputs to ensure compliance of company EHSS system

Ensure that RFIs are raised and inspection is done timely as per approved ITP

Assistant Engineer

[United Cool Services] [Mirpur, AJ&K, Pakistan]

Prepares detailed Diagram.

Installation, design and maintenance of electrical units

Electrical Drawings based on this information is done on a CAD.

The quantities of material and components needed for the job also is worked out.

Conductor sizing and selection of machines and AC according to required specifications.

Finally to insure the security and safety of all devices.

Hydroponics Agricultural Farm HATTAR

Have been working as site assistant engineer

Supervise installation of conduits and cable trays as per marked as per rout identified in construction drawing

Supervise wiring in local control panel and field JB Wiring

Installation of Light Fixtures

Installation of Fire Alarm System

Installation of CCTV System

Nursery Room (Controlled Environment)

SOFTWARES SKILLS:

Auto-CAD

Microsoft Word

Microsoft Excel

Electrical design

LANGUAGES:

Urdu (fluent)

English (fluent)

Punjabi (fluent)

Hindi

PERSONAL DETAILS:

Gender: Male.

Domicile: Azad Kashmir

Date of Birth: 01-12-1992.

Religion: Islam.

Nationality: Pakistani/Kashmiri

Languages: English, Urdu, Punjabi.

Passport#: EM5570371

Marital Status: Single.



Contact this candidate