JOY BOSE
SENIOR PROJECT MANAGEMENT PROFESSIONAL
~ Contact: +965-********/ 69970346 ~ E-Mail: joybose4@ rediffmail.com
~ Linked in Id: www.linkedin.com/in/joy-bose-8b8235140 Dear Sir/ Madam,
Please find the resume attached for the position of Site Architect/Interior designer I'm particularly interested in this opening / position, which relates strongly to my nearly 2 decades of experience in Strategic Planning, Project Management, Architecture, Material & Drawing Approval, Client & Contractor Management, Interior Designing, Team Building & Leadership and Liaison & Coordination besides others. Currently associated with SDPM, Kuwait as Senior Interior designer; I believe I meet all the essential criteria for the position.
The selected highlights mentioned below are indicative of the work that I have managed; my resume would showcase these in further detail.
• Previously dealt with the following projects-
o Hospitals.
o Clinics
o Sport training Centres
o Township-Types of Villas, High Rise Building,
o School,
• Excellence in monitoring project baselines and controlling them with respect to cost, resource deployment, time over- runs and quality compliance to ensure satisfactory execution of projects
• Gained hands-on experience in checking the raw materials used and confirming whether they meet the zonal raw material quality standards
• Proven skills in collaborating with clients while keeping them informed of progress and issues in order to manage expectations on all project requirements and deliverables
• Achievement-oriented professional with excellent people management skills and an ability to manage change with ease Considering my track record in overcoming complex challenges and making high stakes decisions using experience-backed judgment, strong work ethic and integrity, I see significant opportunities in aligning myself with your organization. I am willing to take up roles as Architectural reviewer & Quality Inspections. I am also interested in Environmental conservation and Renovation projects.
I appreciate your efforts in taking the time to review my credentials and experience. Looking forward to a positive response. Thanking you,
Sincerely,
Joy Bose
Enclosure: Resume
Page 2 of 5
JOY BOSE
Architect /Interior Designer
SENIOR PROJECT MANAGEMENT PROFESSIONAL
~ Contact: +965-********/ 69970346
~ E-Mail: joybose4@ rediffmail.com
~ Linked in Id: www.linkedin.com/in/joy-bose-8b8235140 Present address
Block-12, Bld.Basear-7, Salmiya, Kuwait-
22065
adbvre@r.postjobfree.com
linkedin.com/in/joy-bose-8b8235140
joy.bose8
Education:
• Bachelor of Architecture-PDA College of Engineering, Gulbarga University, Karnataka India in 2000
•Diploma in Interior Design-Shramik Vidyapeeth,
Lucknow,India 1994
• Post Graduate Diploma - Master Program Business
Administration (Architecture Management) from Kazian Global School of Business Management,Mumbai, India-2016
• Associate Degree in Construction Management Brooksville University,USA 2014
• SEO-300-Search Engine & Optimization of Marketing-2019-Aston University USA
PROFESSIONAL MEMBERSHIP:
• Council of Architecture – Reg. No. CA/2003/31230
• Indian Institute of Architect – Reg. No. 17753
• Saudi Council of Engineers-Reg.No. 145230
Personal detail
Languages Known: English, Hindi & Bengali
Passport Details: Valid till 15th Nov 2020
Visa Status: Working Visa
Driving License : India & Kuwait
Nationality: Indian
Reference: Available on request
Objective: “I believe long terms goals are achieved when we break them into smaller achievable goals.” To be a part of professionally managed organization to my experience and potential, contributing to their development and my career growth.
Professional summary
Having nearly 2 decades of experience in Strategic Planning, Project Management, Architecture, Material & Drawing Approval, Client & Contractor Management, Interior Designing, Team Building & Leadership and Liaison & Coordination.
Professional skills:
• Project co-ordinator / Design Reviewer/ Space Planning/ Review building material/Site execution/ Quality standards/ Architectural Design/ Interior Finishing /Cost control
• Co-ordinating with the MEP professionals, structures and contractors.
Area of expertise
• Project Planning & Execution
• Architecture and Interior Designing
• Site Inspector
• Cost Control
• Construction & Renovation
• Quality Inspections
Software:
• Proficient in AutoCAD/ PowerPoint/ MS Word/ Excel/Aconex/ Conversant in Revit
Communication skills:
Confident & poised in interaction with individual of all levels with good communication skills.
Engineering:
Extensive knowledge and experience in different aspect of the profession of Architecture and Interior.
Certificates:
• Value Engineering Workshop – Villa in Waterfront development- Yanbu -August 2014 / Construction & redesign of Haii Al-Nawa Camp-3- Yanbu (KSA)-May 2015
• NCR University -Achieving customer detail-Field delivery Course- August 2004 / WSC Strategic Direction-March 2005 / Code of Conduct- April 2005
WORK EXPERIENCE
Duration Employee/
Position
Projects Handled Responsibilities Roles/Achievement July ‘19 –
Till date
System
Development
Project
Management/
Senior Interior
Designer-
Kuwait
New Al Sabah hospital
(B+G+12 ) 617 bedded
Hospital- Project cost-
KWD 180 Million
− Reviewing the Architectural and Interior
drawings, also co-ordinating with Material
Procurement, Civil, and MEP Departments for
final drawing and material approval from
Ministry Of Health (MOH Kuwait) as per
specification and MOH requirements.
− Reviewing initial and shop drawings of
architectural and interior drawing before giving
approval for construction.
− Review all Interior layouts of all the hospital
rooms with furniture layout, ceiling layout in
coordination with the MEP.
− Review, validate and approve Architectural
drawings.
• Reviewing design, site
supervision and coordination
with other departments.
− Reviewing initial and shop
drawings of architectural and
interior drawings
• Review all Interior layouts of
all the hospital rooms with
furniture layout, ceiling layout
in coordination with the MEP.
Page 3 of 5
Duration Employee/
Position
Projects Handled Responsibilities Roles/Achievement March‘18
-Feb ‘19
SEG Qatar-
(Kuwait) /
Senior Architect
Student Activities and
Athletic Facilities
(SAAF) of Kuwait
University’s New Sabah
Al-Salem University City
Campus- Project cost-
KWD 162 Million
− Male campus
− Female campus
− Information Booth
− Transportation station
− Reviewing and checking initial architectural
shop drawings, before sending for final
approval from the consultant for construction –
To ensure compliance with the scope of work
and contract drawings as per specification and
approved contract drawings.
− Co-ordinating with Civil, MEP Departments
and reviewing the shop drawings not affecting
the approved architectural contractual
drawings.
• Reviewing design, site
supervision and coordination.
− Approval and submission of
200 toilets as per International
standards.
− Checking of MEP & Structural
drawing along with
architectural drawings
Sept ‘15 –
Feb ’18
System
Development
Project
Management/
Senior Interior
Designer-
Kuwait
New Al Sabah hospital
(B+G+12 ) 617 bedded
Hospital- Project cost-
KWD 180 Million
− Reviewing the Architectural and Interior
drawings, also co-ordinating with Material
Procurement, Civil, and MEP Departments for
final drawing and material approval from
Ministry Of Health (MOH Kuwait) as per
specification and MOH requirements.
− Reviewing initial and shop drawings of
architectural and interior drawing before giving
approval for construction.
− Review all Interior layouts of all the hospital
rooms with furniture layout, ceiling layout in
coordination with the MEP.
− Review and approve the Door hardware’s sets.
Review, validate and approve Architectural
documents, Technical Specifications, Material
Technical Approval, Design Analysis Report
and Contractor’s query in compliance with
current International codes and standards.
− Also dealing and working in a team of
construction inspectors.
− Review the onsite works. Also, coordinating
with the architects for any queries or in-built
areas.
− Checking the raw materials used and
confirming whether they meet the zonal raw
material quality standards
− Guiding the architects with minor adjustments
and safety changes needed to be made to the
structure.
− Maintaining and organizing important documents
and reports made from the observations.
• Reviewing design, site
supervision and coordination
with other departments.
− Reviewing initial and shop
drawings of architectural and
interior drawings
− Review all Interior layouts of
all the hospital rooms with
furniture layout, ceiling layout
in coordination with the MEP.
− Reviewing and approval of the
12,000 Doors hardware’s sets
along with door openings
−
Jul’ 14 –
July’15
Al Jazirah
Engineering
Consultant /
Design
Architect-
Yanbu (Saudi
Arabia)
− Royal Commission High
End-132 Water front
Villas
− Extension of Royal
Commission Hospital
Centre
− M/s. Al-Baik fast-food
center.
− Dental Clinic for Royal
Commission,
− Industrial building
planning of MARAFIQ
− Designing of Royal Commission 132 Villas in
Waterfront Phase-Yanbu
− Redesigning the Royal Commission Hospital
Expansion Centre project and also co-ordinating
with Civil, MEP Departments for final drawing
approvals from Royal Commission.
− Also dealing with the Furniture, Fitting &
Equipment (FFE).
− Detail designing of architectural project work
and coordinating with the Civil, MEP &
Landscape to ensure compliance of drawing as
per requirements and specifications of Royal
Commission.
− Attending Value Engineering workshop for the
upcoming Royal Commissions of Yanbu
projects.
− Detailed the designs for
construction / shop drawings
− Submission of modified
drawings of Extension of Royal
Commission Hospital Centre.
− Approval of High End Royal
Commission 132 Villas.
− Final submission of Industrial
Office Building planning &
designing of MARAFIQ-Yanbu
Page 4 of 5
Duration Employee/
Position
Projects Handled Responsibilities Roles/Achievement Jul’ 12 –
Jul’ 14
Saudi Arabia
Parsons. Ltd.-
Residential
Construction
Engineer-
Yanbu (Saudi
Arabia)
− Expansion of Royal
Commission Hospital
Centre - Project cost-
SAR 80.0 Million
− Mortuary/Service
Building (Electric
Supply Building)- -
Project cost-SAR 2.0
Million
− Health Care Centre-
Project cost-SAR 10
Million
− Explosive Defusing &
Removal Equipment
Force Building
− Labour Housing
− Intermediate Girls &
Boys High School
Public Housing: 388
Villas Project cost-SAR
388 Million
− Responsible for monitoring and inspection of on- site architectural activities, including; interior finishes, tiling, painting, door, window, and false ceiling installations, and furniture. In accordance with applicable codes, standards, approved
drawings and specifications, budget and schedule.
− Monitors Contractors’ architectural field activities of interior finishing works, material and furniture selection, color coordination regarding contract
scope of work, site conditions, installation,
progress,costs, schedule, and other contractual
requirements.
− Reports directly to the Senior Resident
Construction Manager (SRCM) to receive
administrative and technical direction in terms of project objectives.
− Reviews contractor-submitted architectural shop
and as-built drawings, design inquiries, material
submittals, interiors, and exterior finishes, mock- ups, landscaping, and coordinates with the
concerned departments for obtaining their
approval and/or comments.
− Arranges meetings between the contractor and
concerned departments to resolve interfacing
problems during construction.
− Attends a bi-weekly meeting between the Client
Construction team and the Contractor.
• Review design, site
supervision & coordination
with other departments, with
weekly reports.
− Approvals of Interior Material
for Hospital Centre
− Execution of Exterior &
Interior finishes of Health Care
Centre
− Approval of Interior materials
& site execution of Explosive
Defusing & Removal
Equipment Force Building
− Complete Supervision of
Intermediate Girls & Boys High
School
− Complete Supervision of
Interior and Exterior of Public
Housings
− Reviewing and approve the
Door hardware’s sets for
hospital.
April’12 -
Jul’12
Century Real
Estate Holding
Pvt. Ltd., /
Sr. Architect
Bangalore
Handled the projects for
the upcoming high rise
building and commercial
building
− Handled the projects for the upcoming high rise
building and commercial building
− Involved in planning of the academic block with
hostel building
− Maintained a close coordination with the
Architectural Consultants
• Reviewing design and
coordination with other
departments.
Dec’11 -
April’12
FIRE Luxur
Developer Pvt.
Ltd. /
Dy.Manager
Bangalore
Dealing with the
upcoming Township
Development,
Commercial Projects and
Villas.
− Successfully dealing with the upcoming
Township Development, Commercial Projects
and Villas.
• Reviewing design and
coordination with other
departments.
Apr’ 05 –
Sep’ 11
Sahara Prime
City Limited
(SPCL) /
Asst. Manager,
Lucknow
− Chain of Hospitals-
Sahara City Homes
− SCH Township-Bellary,
Gwalior,Kharagpur,
Porbandar-
Project cost-INR 7.0
Billion each
− Sahara Apollo Hospital-
Lucknow- Project cost-
INR 4.0 Billion
− Sahara Grace- Kochi
− Sahara Corporate
Office- Noida- Project
cost-INR 3.5 Million
− Sahara Head Office –
Sahara Shaher Lucknow -
Project cost-INR 1.0
Billion
− Renovation and
Interior designing of
Residence in Lucknow
- Project cost-INR 3.5
million
−
− Checking and reviewing the Architectural and
Interior initial and shop drawings.
− Coordination with site including site visits and solving site issues.
− Updating and correcting drawings with respect
to site conditions.
− Checking the design and sending the comments
to the design consultants.
− Shortlisting the materials.
− Ensure the quality and constructions are
according to the drawing.
− Prepared built drawings with respect to site
conditions.
− Co-ordination with land and legal department
for final approval from Municipality.
• Reviewing design and
coordination with other
departments, along with weekly
reports.
− Govt. Approval –SCH –
Hospital and site layout plans.
− Complete design & Execution
of interior layout of Sahara
Corporate Office-Noida
− Designing & interior renovation
of a residence.-Lucknow
− Approval of Command office-
Lucknow
Page 5 of 5
Duration Employee/
Position
Projects Handled Responsibilities Roles/Achievement Jan’04 -
Apr’05-
National Cash
Register
Corporation
India Pvt. Ltd./
Architect
(TIS-
Coordinator),
Lucknow
ATM sites for State Bank
India and other
nationalized banks
− Site visit for approving the site for installation of ATM.
− Making architectural and interior plan/ shop
drawings
− Budgeting as per the site.
− Site execution and site visit.
• Detailed the designs for
construction / shop drawings &
sites supervision and execution.
− Site execution & handing over
site to client.
May’02-
Jan’04
MDP
Consultants
Pvt. Ltd.,
Dehradun,
India- (A
member of
DHV Group of
Companies,
The
Netherlands) --
Research
Associate
Planning, monitoring
Survey, Field Validations
& Solid Waste
Management for
Dehradun Nagar Nigam
−
− The first project is having two modules first is to develop Land Inventory of properties owned
by Dehradun Nagar Nigam and second is to
develop Geographic Information Systems
(GIS) of all the properties in Nagar Nigam
boundaries
− The second project deals with the present
situation of solid waste generated in the town
in 63 Urban Centre. In this the present status of
the town is taken and then giving report and
solution to the problem.
−
• Submitted the complete detail
land Inventor.
• Detail report of Solid waste
management submitted.
Oct’ 00 –
Apr’ 02
Arch-en-
Design Center,
/Junior
Architect,
Lucknow,India
− Residential Buildings
interior detailing.
− District Collectorate
Office-Kanpur
− Town Planning of
Moradabad Development
Authority
− Detailed the designs for construction / shop
drawings.
− Visited sites for supervision and execution of
interiors.
• Detailed the designs for
construction / shop drawings.
− Complete elevation & sectional
detailing of building with
working drawing
− Submission of Town Planning
of Moradabad Development
Authority