Post Job Free

Resume

Sign in

Engineer Project

Location:
Portsmouth, NH
Posted:
February 19, 2020

Contact this candidate

Resume:

Justin Hadley

adbveq@r.postjobfree.com * Lincoln Street

Mobile Phone 802-***-**** Waterbury, VT 05676

1

Summery

10+ years of initiating and delivering sustained results and effective improvement in the construction industry. Major experience lies in planning, scheduling, constructability, and profitability.

Project Experience

Engineered Construction Services, Inc (lg. Mechanical Contractor), Brentwood, NH Project Manager, Sept 2015 – Current

Navfac/USACE contracts (PNSY, Hanscom)

Oversaw sub-contactors

Responsible for schedules, submittals, and material buy out

Optimized work and lift plans for speed and safety

Managed As-Built records

Developed budgets and pricing for new work and change orders Vermont Agency of Transportation, (VTrans), Montpelier, VT Hydraulics Project Engineer, Dec 2012 – Sept 2015

Reviewed for quality and constructability bridge and culvert plans

Developed Preliminary Hydraulic Assessments of stream crossing sites across the state

Compiled data for research studies

Abington Group Inc. (Lg. Mechanical Contractor) Portsmouth, NH Construction Engineer Nov 2011 – Apr 2012

Directed sub-contractors Feb 2008 – Oct 2009

Responsible for schedules, submittals, and material buy out

Optimized work and lift plans for speed and safety

Created As-Builts

Worked up pricing for new work and Change Orders EIV Technical Services (Consulting Engineers) Waterbury, VT Consulting Engineer for Hurricane Irene recovery Sept – Oct 2011

Created GIS data and mapping system to record and track damage sites and expenditures for emergency road repairs

Utility Services Inc. (Consultant: Power Industry) Waterbury, VT Associate Feb – Nov 2010

Specialized in clients compliance paperwork for NPCC audits and spot checks

Responsible for clients monthly self-certification paperwork with NPCC and NERC Raito Inc. (Geo-technical Contractor) San Leandro, CA Quality Control Engineer Aug 2005 – Sept 2006

USACE contract

Managed schedules, submittals, and material buy out

Maintained daily work logs, created drill boring logs, and completed as-built drawings

Processed and cataloged drilled rock cores to be sent to the U.S. Army Corps of Engineers Justin Hadley

adbveq@r.postjobfree.com 8 Lincoln Street

Mobile Phone 802-***-**** Waterbury, VT 05676

2

Education

University of Vermont Burlington, VT

B.S. in Engineering Management (Mechanical) 2002 - 2005

Advanced course work in: statics, dynamics, mechanical design, heat transfer, mathematics, management, finance, economics, and process improvement

Senior Project: “Process flow and improvement study in the spark test and package area of a local wire and cable company”

Kimball Union Academy Meriden, NH

College Preparatory Curriculum 1989 – 1993

Continuing Education

OSHA, 30 Hour Construction Safety and Health Kittery, ME October 2019

Fall Protection Training, 24 hour Brentwood, NH

September 2019

OSHA, 40 Hour Hazardous Materials Site Worker Training S. Berwick, ME May 2019

USDA, Design for Aquatic Organism Passage at Road Stream Crossing Hadley, MA 7 - 11 April 2014

NHI Practical Highway Hydrology Mesquite, TX

17 – 19 September 2013

VTrans, Roads and Rivers Training levels I & II Montpelier, VT 16 – 18 July 2013

OSHA, 10 Hour Construction Safety and Health Bloomfield. CT May 2012

Professional Qualifications

National Registry EMT 2007 – 2018

Emergency Medical Technician (EMT) # B1836885

United States Coast Guard 1997 - 2008

Limited Masters License, Launchtender

Professional Association of Dive Instructors

Divemaster #151***-****

Justin Hadley

adbveq@r.postjobfree.com 8 Lincoln Street

Mobile Phone 802-***-**** Waterbury, VT 05676

3

Project’s List:

Portsmouth Naval Shipyard - Kittery, ME: Project Engineer for multiple jobs at the Shipyard.

Dry Dock Pump Well 1; Repair/Replace steel catwalks, Replace drainage valves, Install actuators for dewatering valves.

Drydock 1 & 3 Replace Back-up Generators

B165 Replace High Pressure Air Compressors

B300 High Pressure Test stand

Dry Dock 1 &2 Provide Emergent De-watering Pumps Williams College Heat Plant - Williamstown, MA: Project Engineer for the installation of a new de-aerator, condensate tank and associated equipment to support the plant during the low flow summertime loads.

Hanscom Air Force Base – Bedford, MA: Project Engineer for the Cogen; Including the Installation of a new building, generator, boiler, duct burner, urea injection, gas skid and underground gas line, and new switchgear.

Williams College Heat Plant - Williamstown, MA: Project Engineer for the installation of Muria Boilers and two 2MW Caterpillar Generators. Project included associated pipe and switch gear work and the installation of fire alarm and sprinkler systems. Portsmouth Naval Shipyard - Kittery, ME: Project Engineer for the design phase of a project removing 8 buildings from the central heat system and installing new boilers, heaters, piping and associated code upgrades.

Erving Paper – Erving, MA: Project Engineer for Cogen; including the installation of Solar Taurus 60, Eclipse Duct Burner, & Rentech HRSG. Project included propane mix

(syngas) backup and equipment for duct burner alternate fuel, and new switchgear. EHV Weidmann – St. Johnsbury, VT: Project Engineer for Siempelkamp Press Project, Installation of Siempelkamp Press, hood and associated steel and platforms. Burlington Electric, McNeil Station – Burlington, Vermont: Project Engineer for Babcock Power RSCR Project, Installation of Babcock Power Regenerative Selective Catalytic Reduction (RSCR) System, with duct burners, ID fan with VFD, and associated duct work.

Mt Tom Station – Northampton, MA: Project Engineer for Babcock Power Turbo-Sorp, Installation. Turbo-Sorp (Circulation Dry Fluid Bed Scrubber), bag house, ID fan with VFD, ash handling system, associated switch gear and carbon injection system. Waterbury Dam – Waterbury, VT: Quality Control Engineer for the USACE Waterbury Dam Seepage Control Project, Install a Secant Cut off wall across the old gorge section inside the earthen dam. The project included, De-watering wells, water monitoring wells, and MSE wall.



Contact this candidate