Post Job Free

Resume

Sign in

Mechanical Engineer Power Plant

Location:
Qibla, Kuwait City, Kuwait
Posted:
February 18, 2020

Contact this candidate

Resume:

Mohamed Mohamed Nabil Tawfik Hegazy,MBA,PMP,PRMG

ElMahboula Part1 Infront of Alia Hospital building No134,Kuwait

Tel: 022*******

Mobile: +965********

-010******** -

E-mail:adbt88@r.postjobfree.com

Objective

I am a project management professional (PMP) and MBA holder with more than 15 years of experience. I have acquired throughout my educational and work experience a well-established base of knowledge and skills in project/construction management field. My experience across the diversity of power generation and water projects such as combined cycle, thermal and simple cycle gas turbines, sewage, water treatment and desalination units, as well as the acquired management skills has prepared me to function in a senior position. I also expanded my project management skills during career path by attending several off project classes and gaining certification.

Education

August2001

B.Sc. of Mechanical Engineering, Higher Technological Institute (HTI)–10th. Of Ramadan City

Training:

-Master of Business Administration (MBA). (2016-2018)

-Project Management Professional. PMP certificate no 1315427

-Certified Quality Engineer Preparation Course.

-PGESCo Leadership program.

-Diploma of quality assurance principles(quality concept& management, basic statistical process control, sampling principles, Measuring and inspection,quality cost and quality management system audit)(TQM)

-Professional Project Management Diploma .PRMG(AUC)

-Project Planning and Control Techniques.(AUC)

-Management of Project Resources.(AUC)

-Project Budgeting and Financial Control.(AUC)

-Project Management Information Systems. .(AUC)

-Project Bids and Contracts.(AUC)

-Welding, Cutting and Joining Processes. .(AUC)

-BECHTEL Negotiation Workshop

-BECHTEL Contract Administration Workshop

-BECHTEL Contract/Subcontract Formation Workshop

-Jotun Paint School(30 hours grade II training course in corrosion and protective coating in theory and application

-Scib Paint Training (30 hours training course in corrosion and protective coating theory and application

-ASME Section XIII Division I Pressure vessels design. . (AUC)

-ASME Section XI Welding and Brazing. .(AUC)

WORKING EXPERIENCE:

Working as a Lead Mechanical Project Engineer for Alghanim International General Trading & Contracting Co. WLL (Kuwait) in Sabah Al Ahmed Sea City Phase A5 Sewage Treatment Plant..

Providing a professional service on installation and commissioning supervision during the full project cycle from revising scope of work,ITP, quality plans, method of statements inputs into planning, execution of scope till closing out phase

Determines project specifications by studying project design, customer requirements, and performance standards; completing technical studies

Determines project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements.

Maintains project schedule by monitoring project progress; coordinating activities; resolving problems.

Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions..

Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions.

Maintains safe and clean working environment by enforcing procedures, rules, and regulations.

Accurately identify client key requirement and maintain sound relationship with members of the Engineering, Procurement, and other disciplines to ensure that engineering and business objectives are achieved

Tracking activities against the detailed project plan

Perform review of all Contract documents for construction.

Conduct coordination meetings between contractors as required

Ensure compliance with the occupational health and safety and stop unsafe work activities and report to the project/site manager for rectification

Work together with Commercial and contract department to manage and track commercial issues for example change notice,invoices, negotiation with owner and contractors to close out any open

Preparing method of statement, BOQ revising, proposals and quotations

Feb2018 to Sep2018:

Working as a lead Mechanical Engineer for Alghanim International General Trading & Contracting Co. WLL (Kuwait) in Sabyia CCGT 1 adds on power plant 250 MW:

The existing facility consists of two (2) outdoor combustion turbine generators (CTGs) GE Frame 9F (2 x 250 MW) installed and commissioned in 2016.The new project accommodates two (1) combined cycle modules. This modules have a 2x2x1 configuration consisting of four (2) combustion turbines from the existing units. Each one feeds its exhaust gases to its respective heat recovery steam generator (HRSG) /GE HRSG for a total of two (2) HRSGs and one GE 250 MW nominal steam turbine unit. Steam generated from the four (2) HRSGs feeds one 250 MW, condensing steam turbine generator (STG).

-Lead and manage the mechanical team constructing HRSG, steam turbine and BOP with all related auxiliaries.

-Providing a professional service on installation and commissioning supervision during the full project cycle from revising scope of work,ITP, inputs into planning, execution of scope starting from receiving material(MRR), checking imbedded parts and foundation, fixators installation/sole plates, checking clearances, pre-alignment, pump check, run-out for rotor ending by final alignment and checking keys clearance and welding),critical piping

-Ensure that quality plans and check sheets are in line with OEM procedures, specification

-Reviewing and compile processes, procedures and specification

-Accurately identify client key requirement and maintain sound relationship with members of the Engineering, Procurement, and other disciplines to ensure that engineering and business objectives are achieved

-Tracking activities against the detailed project plan

-Perform review of all Contract documents for construction.

-Conduct coordination meetings between contractors as required

-Ensure compliance with the occupational health and safety and stop unsafe work activities and report to the project/site manager for rectification

June 2016 to Jan2018:

Working as a Lead Mechanical Engineer /acting as Mechanical Contract Manager for PGESCO in EL SHABAB adds power plant 500 MW.

- The existing facility consists of eight (8) outdoor combustion turbine generators (CTGs) GE Frame 9E (8 x 125 MW) installed and commissioned in 2011.The new project accommodates two (2) combined cycle modules. Both modules have a 4x4x1 configuration consisting of four (4) combustion turbines from the existing units. Each one feeds its exhaust gases to its respective heat recovery steam generator (HRSG) for a total of four (4) HRSGs and one 250 MW nominal steam turbine unit. Steam generated from the four (4) HRSGs feeds one 250 MW, non- reheat, condensing steam turbine generator (STG).

-Lead and manage the mechanical team constructing HRSG, steam turbine and BOP with all related auxiliaries and any subcontractors.

-Providing a professional service on installation and commissioning supervision during the full project cycle from revising scope of work,ITP, quality plans, inputs into planning, execution of scope,closing out

-Assist in the spares identification and recommendation for owners side before handing over

-Ensure that quality plans and check sheets are in line with OEM procedures, specification

-Reviewing technical work instruction and apply it

-Implement project construction quality control/assurance requirements including inspection and witness testing of contractor's in-process and completed installations

-Work together with Commercial and contract department to manage and track commercial issues for example change notice,invoices, negotiation with owner and contractors to close out any open

-Develop Quality Management System to be a benchmark for any new comer contractor.

-Evaluate and interpret technical reports, specification and deviations and make recommendations in case of open RFI,FCRs and instructions timely.

-Manage mechanical technical advisors being responsible for their behavior and performance.

-Monitor the development the mechanical team in accordance to Training & Evaluation Procedure

-Support procurement department to handle all vendors on site and work with them

-Technical development and improvement of procedures,quality plans and ITP

-Turbine system installation for (Lube oil system, cooling water system, Co2 GT &generator system, fuel gas system, and compressor and washing water system, drainage system……) by performing walk-down, inspections and tests.

-Reviewing and compile processes, procedures and specification

-Accurately identify client key requirement and maintain sound relationship with members of the Engineering, Procurement, and other disciplines to ensure that engineering and business objectives are achieved

-Tracking activities against the detailed project plan

-Perform review of all Contract documents for construction.

-Conduct coordination meetings between contractors as required

-Ensure compliance with the occupational health and safety and stop unsafe work activities and report to the project/site manager for rectification

Feb2015 to June2016:

Working as a Lead Mechanical Engineer for PGESCO in Suez thermal power plant 1X650 MW

-Lead and manage the mechanical team constructing Boiler, steam turbine and BOP, desalination and water treatment units with all related auxiliaries .

-Turbine installation beginning from receiving material, checking imbedded parts and foundation, fixators installation/sole plates, checking clearances, pre-alignment, pump check, run-out for rotor ending by final alignment and checking keys clearance and welding),

-Turbine system installation for (Lube oil system, cooling water system, Co2 GT &generator system, fuel gas system, and compressor and washing water system, drainage system……) by performing walk-down, inspections and tests.

-Piping installation(Critical, non-critical piping, supports installation)

-Perform review of all Contract documents for construction

-Coordinate execution of the project construction

-Verify Contractors issuance of Construction Completion Certificates progress

-Conduct coordination meetings between contractors as required

Oct2014 to Feb2015:

Working as Lead Mechanical Engineer for PGESCO in Banha power plant 750 MW combined cycle project:

-Gas,steam turbine,HRSG and water treatment installation supervision beginning from receiving material, checking imbedded parts and foundation, fixators installation/sole plates, checking clearances, pre-alignment, pump check, run-out for rotor ending by final alignment and checking keys clearance and welding),

-Turbine system installation for (Lube oil system, cooling water system, Co2 GT &generator system, fuel gas system, and compressor and washing water system, drainage system……) by performing walk-down, inspections and tests.

-Piping installation(Critical, non-critical, support installation)

-Closing out phase, conduct close out meetings, finalize punch-list, invoices, issue TOAC for all contractors existing on site.

-HITACHI/TOYOTA BOP system include all balance of plant critical and non-critical piping, feed water, condensate, circulating, service, sump pumps, fuel pumps, skids, air compressors.

-Ansaldo energia steam turbine 250MW with all related auxiliaries

-Two GE gas turbine heavy duty 9351FA+E 250MW with all related auxiliaries.

-Ansaldo caldaie heat recovery steam generator

Oct 2012 to Oct2014:

Working as Senior Mechanical Engineer for PGESCO in Banha power plant 750 MW combined cycle project: 1X250MW Ansaldos Energia steam turbine with all related auxiliaries)

-Supervision and monitoring construction for 2 GE heavy duty 9351 FA+E gas turbine with all related auxiliaries.

-Turbine installation beginning from receiving material, checking imbedded parts and foundation, fixators installation/sole plates, checking clearances, pre-alignment, pump check, run-out for rotor ending by final alignment and checking keys clearance and welding), Turbine system installation for (Lube oil system, cooling water system, Co2 GT &generator system, fuel gas system, and compressor and washing water system, drainage system……) by performing walk-down, inspections and tests.

-Implement project construction quality control/assurance requirements including inspection and witness testing of contractor's in-process and completed installations

-BOP installations including piping works, feed water, condensate circulating, service, sump pumps, critical and non-critical piping

Dec 2011 to Oct 2012:

Working as a Senior Mechanical Engineer for PGESCO in West Damietta 4x125MW Simple Cycle Gas Turbine Units:

-Supervision for 4 heavy duty combustion turbine GE PG9171 (E) gas turbine generator and auxiliaries.

-Turbine installation beginning from receiving material, checking imbedded parts and foundation, templates installation,turbine drop checks, checking clearances, pre-alignment,pump check, run-out for rotor ending by final alignment and checking keys clearance and welding)

-Turbine system installation for (Lube oil system, cooling water system, Co2 GT &generator system, fuel gas system, and compressor and washing water system, drainage system……) by performing walk-down,inspections and tests.

-Preparing for flushing and performing flushing after hydro-test.

-Implement project construction quality control/assurance requirements including inspection and witness testing of contractor's in-process and completed installations

-Develop punch List of incomplete work

-Review contractors invoices(shipment, material receiving,progress, completion certificates, turnover and acceptance certificates)

May 2011 to Dec2011

Working as a Senior Mechanical Engineer for PGESCO in Damietta 4x125MW Simple Cycle Gas Turbine Units:

-Supervision for 4 heavy duty combustion turbine GE PG9171(E) gas turbine generator and auxiliaries

-Implement project construction quality control/assurance requirements including inspection and witness testing of contractor's in-process and completed installations

-Develop punch list of incomplete work

Jan2010 to May2011

Working as a Mechanical Engineer for PGESCO in Cairo west thermal power plant 2x350 MW unit 7&8 project and responsible for:

-Steam turbine,Boiler,BOP and water treatment installation supervision. beginning from receiving material, checking imbedded parts and foundation, fixators

-Turbine system installation for (Lube oil system, cooling water system, Co2 GT &generator system, fuel gas system, and compressor and washing water system, drainage system……) by performing walk-down, inspections and tests.

-Piping including critical and non critical piping,supports,performing hydrotest and precomissioning activities.

-Implement project construction quality control/assurance requirements including inspection and witness testing of contractor's in-process and completed installations

-Monitoring Mechanical works for all contractors according to specifications, codes and under safety precaution

-Construction for (Hitachi/BABKOK boiler, MHI steam turbine, Initec Energia BOP, ARCHIRODON (civil contractor), METITO water treatment plant

-Supervising steam turbine installation.

-As built drawings and modifications executed on field.

-Performing hydro tests, pneumatic tests, flushing, rotating equipment (Pump alignment).

-Making surveillance notices, request for information, field change notices, Material receiving reports etc...

-Tracking piping works progress for contractors

-Develop punch List of incomplete work.

-Reviewing contractor invoices according to progress.

Aug2007 to Jan2010

-Working as a Mechanical Engineer for PGESCO in Kurimat II&III power plant 2X750 MW combined cycle project and responsible for:

-Turbine installation beginning from receiving material, checking imbedded parts and foundation, fixators installation/sole plates, checking clearances, pre-alignment, pump check, run-out for rotor ending by final alignment and checking keys clearance and welding),

-Turbine system installation for (Lube oil system, cooling water system, Co2 GT &generator system, fuel gas system, and compressor and washing water system, drainage system……) by performing walk-down, inspections and tests.

-Implement project construction quality control/assurance requirements including inspection and witness testing of contractor's in-process and completed installations

-BOP installations including critical, noncritical piping, feed water, condensate, circulating, and service pumps.

-Hitachi steam turbine 250MW with all related auxiliaries

-Two GE gas turbine heavy duty 9351FA+E 250MW with all related auxiliaries.

-Alstom steam turbine 250MW with all related auxiliaries

-HVAC system in STG, CTG, Office building, warehouse

-CMI/SKODA heat recovery steam generator

-METITO Water treatment plant

Dec2005 to Aug2007

Working as a Mechanical Engineer for PGESCO in Cairo north II power plant 2X750 MW combined cycle project.

-Turbine installation beginning from receiving material, checking imbedded parts and foundation, fixators installation/sole plates, checking clearances, pre-alignment, pump check, run-out for rotor ending by final alignment and checking keys clearance and welding),

-Turbine system installation for (Lube oil system, cooling water system, Co2 GT &generator system, fuel gas system, and compressor and washing water system, drainage system……) by performing walk-down, inspections and tests.

-Monitoring Mechanical works for all contractors according to specifications, codes and under safety precaution.

-Supervision and monitoring construction for GE heavy duty 9351 FA+E gas turbine, NEM HRSG, Alstom steam turbine).

-Supervising gas & steam turbine installation.

-Hydro tests, pneumatic tests, flushing, rotating equipment (Pump alignment).

-As built drawings and modifications executed on field.

-Develop punch List of incomplete work

Jan. 2002 till June 2005:

Working as Mechanical Engineer for Egyptian armed forces (AIR DEFENCE) as reserved officer

-Operation and maintenance of Air Defense equipment as a reserved officer.

Personal Information

Nationality : Egyptian.

Date of birth : 26-12-1979.

ALL REFERENCES ARE AVAILABLE UPON YOUR REQUEST



Contact this candidate