Post Job Free

Resume

Sign in

QA/QC Engineer Piping Inspector

Location:
Riyadh, Saudi Arabia
Posted:
February 15, 2020

Contact this candidate

Resume:

PERSONAL PARTICULARS

Name : Francisco M. Cañezo

Gender : Male Marital Status : Married

Height : 5’2” Weight : 55 kgs

Date of Birth : March 2, 1979 Age : 40

Nationality : Filipino

Languages/Dialects : English, Tagalog and Cebuano

Home Address : 317 Adela Bermudez Village, Apokon,

Tagum City, 8100 Davao del Norte, Philippines

Email Address : adbshu@r.postjobfree.com

Phone No. : +966*********

Passport Details

Passport Number : P5917161A

Passport Issue Date : Feb. 06, 2018

Passport Expiry : Feb. 05, 2028

Place of Issue : DFA Manila

SUMMARY OF PROFESSIONAL EXPERIENCE

11 Years experienced in Piping/Project Engineering. I am also working as Piping Supervisor/Permit Applicant and Static Supervisor.

An experienced Quality Control Engineer Inspector (Piping, Structural, Mechanical, Welding and Painting).

Registered Mechanical Engineer and Saudi Aramco approved Piping Inspector.

Excellent and experienced in engineering drawings prior to fabrication, assembly and erection.

Knowledgeable in computer software such as: AutoCAD 3D and 2D, Excel, Navis-Work, MS Word, Fusion 360, Autodesk Revit, Autocad Plant 3D, and Autodesk Inventor.

Proficient in Inventor Professional and AutoCAD 3D and 2D design drawings such as machine parts, pipe, structure, house model, and CAD works.

Knowledgeable in Basic Drilling Technology, Drilling Fluids, and Well Control Prevention.

Experienced in Oil, Gas, Petrochemical, Pharmaceutical, and Ship Piping and Maintenance Constructions.

AWARDS RECEIVED

Best QC Inspector of the Month (SHELL Bukom Project/Shutdown)

Best Supervisor of the Month (EXXON Mobil Project)

1st Runner-up Safety Observation Report (GlaxoSmithKline Pioneer)

1st Runner-up Zero Incident Practice (GlaxoSmithKline Pioneer)

EMPLOYMENT HISTORY

Company Name : Coreteam Contracting Co. Ltd.

Period : Sept 2018 to Present

Position Held : QC Engineer Piping Inspector

Duties :

Monitor daily piping activities for the construction of on plot piping, steam tracing, and control heat tracing.

Prepare test package and attached all the necessary documents and review if required.

Perform the line checking pre-test punch, punch ‘A’, ‘B’, ‘C’ clearing and field change Isometric drawing verification of the actual orientation of a pipeline construction with regards to the line list of a package prior to hydro test.

Conduct bolt tightening inspection and verification of the flange joint assembly. To ensure correct type, class, rating, grade, material and dimension of the flange, bolt and gasket to be used.

Visually check the flange facing for its cleanliness/good quality serration and witness flange re-facing work activities in case severe damage of serration occur during inspection.

Perform visual inspection and witness pipe internal cleanliness, hydro testing, and lay-up prior to acceptance of the owner’s inspector.

Conduct the Quality Hits talk to the group of workers before commencing the job assignment to instill the project quality minimum requirements.

Project Accomplished

Duration : 11 months

Client/Project Title : Petrofac/Saudi Aramco Fadhili Gas Plant Construction

Location : Jubail Saudi Arabia

Company Name : Qatar Kentz W.L.L (Member of SNC Lavalin Group)

Period : April 2017 – August 2017

Position Held : Piping Supervisor

Duties :

Lead the team of material trackers of piping construction materials such as FRP supports, FRP pipes, neoprene rubber, fittings and metallic pipe spools.

Provide support to the mechanical construction team to expedite the material needed for their daily installation.

Prepare documentation as per Superintendent and Lead Supervisor instructions.

Monitor and prepare documentation of the outgoing and balance materials used by the construction team.

Supervise the painting group team to paint the FRP pipe spools in terms of schedule and prioritization of pipe to be installed.

Organize a material tracker team to facilitate the loading and unloading of construction materials such as pipe spools (FRP/Metallic), pipe shoe, guide bolts, rubber shoe pads, bolts, nuts and pipe fittings.

Prepare Field Material Request (FMR) and Material Requisition (MR) with the Superintendent instruction.

Conduct daily tool box talk to the painting and material trackers group for their safe work, self-risk assessment, Heat Stress, and good working habit.

Trace the lost spool materials and provide a list or drawings to expedite the trackers work to avoid construction delay.

Train the trackers group to become competent of their work assignment such as familiarization of construction drawings.

Apply and received work permit on daily basis as per work activities.

Project Accomplished

Client/Project Title : Qatar Gas Wastewater Recycle and Reduction Project (WRR)

Location : Ras laffan Industrial City (RLIC)

Company Name : PEC LTD.

Period : February 2013 to June 2016

Position Held : Quality Control Engineer Inspector

Duties :

Perform material receiving inspection of construction materials such as valves, pipe fittings, and supports as per Purchase Order, material inspection certificate, material commodity number, shipping release notice and dimensional requirements stated in the order.

Conduct daily inspection for the construction of piping, structural, mechanical, insulation, and welding works.

Prepare test package and attached all the necessary documents and review if required.

Assist the line checking pre-test punch, punch ‘A’ clearing and field change Iso drawing verification of the actual pipeline construction with regards to the line list of a package prior to hydro test.

Do the leveling plate and vertical alignment check for underground flare structure 15230/15240, wind shield, and staging structure prior to installation.

Perform bolt tightening inspection of the combustion panel and pipe rack assembly.

Do the internal insulation inspection of the combustion panels of the underground flare using insulfrax fiber blanket and isophrax fiber module.

Conduct visual inspection for the fabrication works of the pipe spool, structural pipe racks with their welding, dimensions, and orientation.

Prepare method of statement and risk analysis (MSRA) for NDT works.

Conduct Quality Induction Course and Total Flange Assurance training of the newly transferred workers.

Do the daily Quality Hits talk to the group of workers before commencing the job assignment to refresh their mind about good quality standard of the project.

Project Accomplished

Duration : 3 year s

Client/Project Title : ECCDB & FR (SHELL BUKOM Project/Shutdown)

Location : Singapore

Company Name : Astir Engineering Works Inc.

Period : July 2011 to March 2012

Position Held : Project Engineer

Duties :

Conduct quality inspection of the structural project as to welding, painting, pipe fabrication and installation before turn-over to the client.

Witness air-blowing of pipe spool to remove foreign materials to ensure cleanliness before installation.

Conduct line check and witness hydro testing of the installed pipeline in Ship project maintenance.

Generate Isometric drawing of pipe line prior to fabrication and installation using cad software.

Survey and prepare project quotation as per client instruction.

Prepare project estimates and provide drawings using Google sketch-up for having reliable estimates.

Do the project estimates of the following:

•Fabrication, installation, insulation and cladding of pipe lines.

•Installation of catwalk and railings of newly installed condenser.

•Repainting of chiller room (150 and 270 tons) pipelines, and cooling tower metal structure.

•Fabrication, installation and insulation of centralized ducting.

•Complete piping installation of two (2) unit water softener tanks and its concrete foundation.

Supervise and monitor the awarded project in industrial and structural work.

Oversee and prepare materials based on the awarded project namely:

•Fabrication, installation of filling pipe for freshwater and fuel line at portside of the vessel.

•Repainting of chilled water pipeline of cooling tower metal and chiller.

•Fabrication of leaky main suction pipe spool of the main engine of the vessel.

•Modification of base support for main engine compressor of the vessel.

•Repair of dilapidated and corroded office container van.

•Fabrication of hydraulic pipeline of windlass at fore peak and back of the vessel.

Project Accomplished

Duration : 8 months

Client/Project Title : Fairchild, Cebu Ferries, Gaisano, SM, and Ayala Malls

Location : Cebu City, Philippines

Company Name : EEI CORPORATION

Period : March 23, 2007- June 12, 2008

Position Held : QC Engineer Piping/Power Plant Engineer

Duties :

Closely monitor the work of the Pipe fitter, Welder and Foreman in fabricating carbon, stainless, and Super Duplex steel.

Double checked the edge preparation, Fit-up, and Dimensional Requirements as per project specification.

Monitor and checked the type of pipe support as per standard drawings prior to full welding.

Conduct routine check of filler wire and electrodes used by the welder as per WPS.

Monitor the welder’s qualification as per approved WPQR.

Checked the orientation and bill of materials of the pipe spool as per drawing prior to fabrication.

Visually inspect every welded joints of the pipe spool if free from cracks, undercuts, and porosity prior to acceptance.

Closely monitor the inside surface of the pipe if free from foreign materials prior to installation.

Conduct line checking of the pipe line to ensure completeness as to weld, fittings and supports prior to hydro testing.

Regularly check the proper isolation of materials especially carbon steel and stainless steel to avoid contamination.

Closely monitor the proper storage of the fabricated spool as per specification.

Religiously check the dimension, alignment, and squareness of pipe spool. Especially, the bolt holes of flange to attain the allowable tolerance prior to fabrication.

Conduct proper investigation and put tagging to the welded joints subject to Ultrasonic, Penetrant, and Radiographic test.

Monitor the correct handling of electrodes and exact usage of filler wire used by each welder.

Regularly monitor the relative humidity of air as per painting system specification. Before allowing the painter to paint the fabricated spool.

Conduct proper investigation of the blasting machine to ensure the exact surface preparation applied to the fabricated spool as per painting specification.

Closely monitor the painting system specification of every fabricated spool to ensure the exact paint applied by the painter.

Regularly check the proper mixing ratio of paint as per painting system procedure.

Closely monitor the dry film thickness applied by the painter per batch as specified on the painting system prior to acceptance.

Do the monitoring of two (2) megawatts diesel engine as to temperature, pressure, and Lube oil level parameters to ensure the good condition of the engine.

Assist the trouble shooting if problem arise during the continuous operation of the diesel engine.

Monitor the maintenance work and assist the repair of the auxiliary pumps, control valves, and pipe line.

Project Accomplished

Duration : 1 year and 3 months

Client/Project Title : JGC and CBNC / Construction of Nickel Refinery Plant

Location : Riotuba Bataraza, Palawan, Philippines

EDUCATIONAL BACKGROUND

Period : 08/06/1998 – 22/03/2003

Name of Institution : University of San Jose-Recoletos

Course Attended : Bachelor of Science in Mechanical Engineering

Highest Degree Attained : Registered Mechanical Engineer; Year 2003, Cebu City,

Philippines

TRAINING/COURSES ATTENDED

Training/Seminars Title : Permit Reciever (Qatar Kentz/Qatar Gas)

Date attended : May 09, 2017

Training/Seminars Title : Autocad 2016 Intermediate and Advance

Date Attended : May 15, 2016

Training/Seminars Tittle : Autocad 2016 Essential (complete) 2D

Date Attended : April 17, 2016

Training/Seminars Title : Construction Safety Orientation Course for Workers

Date Attended : December 15-16, 2014

Training/Seminars Title : Level 2 Liquid Penetrant Testing

Date Attended : August 25, 2014

Training/Seminars Title : Level 2 Visual Testing

Date Attended : February 11-12, 2014

Training/Seminars Title : Work at Heights Course for Supervisors

Date Attended : December 23-24, 2013

Training/Seminars Title : Apply Workplace Safety and Health in Process Plants

Date Attended : October 01, 2014

Training/Seminars Title : Supervise Workplace Safety and Health in Process Plant

Date Attended : September 9-21, 2013

Training/Seminars Title : Supervise Work in Confine Space Operation

Date Attended : September 2-7, 2013

Training/Seminars Title : Rotating Equipment Fitting

Date Attended : September 17-20, 2013

Training/Seminars Title : QA Awareness

Date Attended : April 12, 2013

Training/Seminars Title : Supervisory HSSE Program-Module 1

Date Attended : April 5, 2013

Training/Seminars Title : Occupational Safety & Health Risk Assessment Training

Date Attended : March 23, 2013

Training/Seminars Title :PSME-Corrosion Control Using Protective Coatings/Turbo Charger Date Attended : March 24, 2012

Training/Seminars Title : PSME- Technical Seminar and Election of 2012 Officers

Date Attended : October 15, 2011

Training/Seminars Title : Basic Safety Training, Personal Survival Techniques, Fire

Prevention and Fire Fighting, Elementary First Aid, and

Personal Safety and Social Responsibility

Date Attended : January 8-14, 2007

Training/Seminars Title : Introduction to Hydrogen Sulfide/SCBA

Date Attended : December 7, 2006

Training/Seminars Title : First Aid at Oil & Gas Drilling RIG

Date Attended : December 8-9, 2006

Training/Seminars Title : Basic Training Program for Drilling Personnel

Date Attended : December 4, 2006-January 3, 2007

CHARACTER REFERENCES:

Brainard Canacao

Ultralon International

Product Design Engineer

006************

Christchurch New Zealand

Noriel Delos Reyes

Lead Supervisor

Qatar Kentz W.L.L (Member of SNC Lavalin Group)

50653882

Angelito Baclaan

Piping Supervisor

Qatar Kentz W.L.L (Member of SNC Lavalin Group)

adbshu@r.postjobfree.com

Vobette Benitez

Asst. Superintendent

PEC LTD

+65 9785-3821

Jeremy Toriano Bahil

QC Manager

Shing Leck Engineering Services

adbshu@r.postjobfree.com



Contact this candidate