George-Ciprian PETRESCU
Address: *** ****** ******, ********, *******
Mobile: +4-072*-****** ROMANIA;
Email; ************@*****.***
Skype: georgeciprianpetrescu
Date of Birth: June 2nd, 1979
- - P R O F E S S I O N A L E X P E R I E N C E - - 24 Ianuarie, Ploiesti Position – mechanical engineer May of 2019 – now
Job description/ Responsibilities
Full time job in steel structure factory.
Achievement of 2d drawings for cutting steel machines and survey for the process of assembling the devices for over 300 tons of steel in various projects;
Achievement of 2d drawings for cutting steel machines with different procedures for carbon steel and stainless steel.
WABAG WATER SERVICES, Bucharest Position – mechanical engineer January of 2019 – March of 2019
Job description/ Responsibilities
Full time job.
Achievement of isometrics and 3d model with Autocad 3d plant. SPEC ENGINEERING AND CONSTRUCTION, Bucharest Position – Lead 3D design piping engineer Nov of 2017 – Dec of 2018
Job description/ Responsibilities
Full time job.
Achievement of 3d model with Autocad 3d plant;
Training and practice 3d model with Autocad 3d plant;
Verifying 3d model with Naviswork;
To create internal piping classes within Autocad 3d plant Spec Editor;
To issue data sheet for various items according EN codes, API norms, ANSI norms for project specifications. Industrial Montaj S.A. Ploiesti Position – mechanical engineer January of 2017 – April of 2017
Job description/ Responsibilities
Full time job.
I was responsible in the area for scaffolding in the Petrotel – Lukoil Refinery;
Daily, weekly, monthly activity report (by MS Excel); SITECNE, Sarroch Office, Italy
May of 2016 – august of 2016 Position – 2D, piping design engineer Job description/ Responsibilities
Full time job;
Design of cooling water network and foam solution network for firefighting system;
As built cooling water systems and fire extinguishing project;
Survey for “As Built”;
Attention to survey in site;
The graphics are done in AutoCAD;
2
In most of my work in the company I was involved in projects for Sarlux Saras Refinery Caspian Proger, Aksai Kazakhstan Position – 3D design piping mechanical engineer April and May of 2015
Job description/ Responsibilities
Full time job.
Achievement of 3d model with smartplant3d;
Training and practice 3d model with smartplant3d in cloud;
To verify RoK codes (GOST) and EN codes, API norms, ANSI norms for project specifications. I.P.I.P S.A., Ploiesti
November 2014 – 29.02.2016 Position – Engineer 2D/3D, piping design engineer Job description/ Responsibilities
Full time job;
Achievement of project documentation according to surveys and P& I D’s;
Attention to survey in site;
The graphics are done in AutoCAD, PDMS ( 5 months training and practice in the company and, during abroad job – self-educated) ;
I worked in authorizing projects pipeline (Petromidia -KazMunayGaz – HB Unit, RC Unit), I’m involved also in
“Interconnection of New Primary and Secondary Heaters in CDU No.2” project and Revamping Project Petrom- OMV Unit Abramut.
In refinery it is necessary to survey all type dimensions of pipes (1/2” to 36” or 40”), different pipeline product (air, nitrogen, water, condensate (low, medium, high pressure), steam (low, medium, high pressure), oil, gas, gasoline, diesel-fuel, flare line).
To design or to project the lines according EN, SR-EN, ASME, API, BS, DIN by case. In most of cases I used
“Piping equipment” by Trouvay Cauvin, Pipe data pro;
To prepare iso’s and material and supports list;
To prepare MTO and Summary of piping materials;
To prepare drawings, iso’s, plot plans, and P&ID’s if necessary “As Built” is. Saipem S.p.A., San Donato Milanese
October 2014 Position – Engineer 2D, piping design engineer Job description/ Responsibilities
Full time job on Project Spiritwood Nitrogen Plant
Achievement of project documentation according to Line List and P& I D’s; I.P.I.P S.A., Ploiesti
August 2010 – September 2014 Position – Engineer 2D, piping design engineer Job description/ Responsibilities
Full time job;
Achievement of project documentation according to surveys and P& I D’s;
Attention to survey in site;
The graphics are done in AutoCAD;
In most of my work in the company in authorizing projects pipeline (Petrom -OMV – DAV2 Unit revamp Project, FCC Unit Revamp Project). In refinery it is necessary to survey all type dimensions of pipes (1/2” to 36” or 40”), different pipeline product (air, nitrogen, water, condensate (low, medium, high pressure), steam (low, medium, high pressure), oil, gas, gasoline, diesel-fuel, flare line. These projects were made with Foster Wheeler Italiana (FWI) in DAV Unit (atmospheric and vacuum distilleries unit) and FCC Unit (catalytic cracking fraction unit).
In collaboration with FWI were developed sketches for tie-in’s and repairs projects, after survey and after FWI
check sketches for a good solution.
To design or to project the lines according EN, SR-EN, ASME, API, BS, DIN by case. In most of cases I used
“Piping equipment” by Trouvay Cauvin, Romanian norms NPCICh and P118 as well NFPA’s. 3
To prepare drawings, iso’s, plot plans, and P&ID’s if is necessary “As Built”. October 2007 – July 2010 Position – Technical engineer 2D, piping design engineer Job description/ Responsibilities
Full time job;
Design of cooling water network and foam solution network for fire fighting system;
As built cooling water systems and fire extinguishing project;
Survey for “As Built”;
Attention to survey in site;
The graphics are done in AutoCAD;
In most of my work in the company I was involved in authorizing projects pipeline (Petrom – Suplacu de Barcau, Aprechim Pitesti, Brazi).
Petrotel-Lukoil S.A., Ploiesti
October 2006 – September 2007 Position – Technical engineer energy consumption accountability Job description/ Responsibilities
Full time job;
To collect information (quantity, pressure, temperature) a b o u t energy consumption (gas, steam, condensate, electrical power);
Daily, weekly, monthly activity report (by MS Excel);
I made sketches for department with MS Visio;
Very carefully to prepare reports.
Energomontaj S.A. Bucuresti, Brasov Branch
July 2003 – May 2005 Position –Technical engineer Site Engineer Coordinator Job description/ Responsibilities
Full time job;
Activity in that company is to setting and erecting equipments for power stations. My job was to coordinate and check all activities in site, developed by Energomontaj S.A.
As responsibilities: in site must have maximum attention for HSE (health, safety and environmental);
Setting layout sketch detail for erection;
Over 6 km air duct installed in drug factory LekPharma (now, Sandoz) Tg-Mures, maintenance service for cement
kiln (Lafarge-Hoghiz, Brasov), air duct for thermal power-station Paroseni, Hunedoara;
Steel structure (beam, supports, metal) for cement plant Holcim Turda;
Daily, weekly and monthly activity report (by MS Excel and then MS Project).
- - E D U C A T I O N
- -
Start 2006 – End 2010 Ploiesti Oil and Gas University, Ploiesti Faculty of Mechanical engineering – Economic engineering in mechanical field Start 1998 – End 2002 Bucharest Polytechnics University, Bucharest Faculty of Power energy – 2nd Technical College - Faculty of power system.
- - T R A I N I N G S - -
Training : Introduction in PDS, PDMS, Microsoft Project. Smartplant 3d (piping), Autocad 3d plant (piping).
- - S K I L L S
- -
Foreign languages English - good level; Italian – basic level; IT Skills Microsoft Office, Word, Visio, AutoCAD, PDMS, SmartPlant3d, Cosmos, SolidWorks, Mathcad, Microsoft Project, Internet Explorer, Mozilla Firefox. Driving License B Category, no records.