Post Job Free

Resume

Sign in

Manager Project

Location:
Rawdat Al Khail, Qatar
Posted:
February 07, 2020

Contact this candidate

Resume:

ANUP KUMAR SINGH

:

Contact No

: India:- +91-968*******/779-***-****

Objective Scaling new height of success with hard work & dedication and leaving marks of excellence on every step, in quest of senior level assignments in project execution & operation / vendor management with a leading organization of repute in Telecom industry, Building Automation & Security Surveillance industry. Qualification Diploma in Electrical Engineering (Industrial control) Government Polytechnic Rampur UP .Technical University, Lucknow Year of passing 2001 First class with 73.74 %

PROFILE SUMMERY

• A professional with more than 18 years experience in: Project Management Installation Management Vendor Management Budgeting Site Management Team Management

Customer Management Process Improvement

• Able to lead cross- functional team & integrate their efforts to maximize operational efficiency & effectiveness

• Presently associated with THALES GULF DOHA QATAR as an Installation Manager for Telecom project – Doha Metro Rail Corporation Limited (QRAIL ) Phase-1 Project. AREAS OF EXPERTIES

• Project Installation Management

• Site survey, Planning, Time Scheduling, Cost Monitoring Review of drawings, Techno -commercially, specification and equipment schedules & Execution.

• Execution of Telecom projects (QRAIL ) :- Telephone, CCTV, Public Information Display System(PIDS), Passenger Address System(PAS), TETRA RADIO, Fibre Optical Transmission System(FOTS), Broad Band Radio System (BBRS), Master Clock systems(MCK), GE, Access Control Systems ETC

• Execution of Telecom projects (BMRCL ) which includes in 10 systems EPABX (TS), CCTV, Public Information Display System(PIDS), Passenger Address System(PAS), TETRA RADIO, Fibre Optical Transmission System(FOTS), Broad Band Radio System (BBRS), Master Clock systems(MCK), GE, SDH ETC .

• Execution of IBMS projects which includes Fire Alarm System (FAS), Public Address System (PAS), Building Management System (HVAC of Building including controlling and monitoring of CHILLERS, Heat Exchangers, chilled water pumps(VFD control),AHU, FCU,CCU,HRF and Diff. Fans. Controlling and Monitoring of Fire pumps, Cold water Transfer pumps, Foul water and Sump pumps. Level control of fire and domestic tanks. Electrical Systems including DG SET, PFC Panels, LV Panels, incomer and outgoing breakers in LV panels, ATS panel, ACB, MCCB, VCB, Meters in DG & LV panels, Lifts and Escalator), Access Control System. Water Leak System, Gas Flooding Systems, and Rodent Replicate System etc.

• Heading team of contractors, engineers& supervisors on the site. Allocation of work schedule to manpower.

• Certification of measurement with contractors for payments.

• Preparation of various documents as like a As built Drawing, Cable Schedule, termination details

• Site Management

Anchoring on-site activities to ensure completion of projects within time & cost parameters and effective resource utilization to maximise the output.

• Inspecting field site to observe and evaluate condition and operability for facilities and structure, and collect filed survey data & measurements.

• Implementing stringent systems and quality plans / manuals to ensure high quality standards during all the stage of projects according to designing.

• Co-ordination and follow-ups of inspections with Consultants for obtaining approvals for works executed as per approved drawings and method statements

E- Mail & Social Media adbno2@r.postjobfree.com,

adbno2@r.postjobfree.com

adbno2@r.postjobfree.com

linkedin.com/in/anup-singh-339974b7

• Installation and testing with supporting during system testing commissioning

• Ensuring safety of Manpower and Equipments.

WORK EXPERIENCE

1. Name of Organization : Thales Gulf Qatar

Location-: Doha Qatar

Duration-: From 17 Feb 2018 to till date

Designation-: Installation Manager

Nature of Project: - Design, Procurement, Installation & testing of Signalling & Telecom Systems (IP Telephone, CCTV, PIDS, PAS, TETRA RADIO, FOTS, BBRS, MCK, GE, OFC,VDR ORS ETC) of Doha Metro Phase-1. Responsibilities-:

Developing project installations schedule, plans and procedures in relation to installations, method statements.

Interfacing with the construction supervision consultants to ensure required testing forms are updated as telecom required and filled properly

Pre installation inspection to insure readiness of side physical condition, drawing approvals, required accessories material requirements as per site conditions.

Work closely with the Construction Supervision Consultant, Contractors, vendors and suppliers in resolution of technical problems and to ensure that identified deficiencies are repaired and update as to actual site conditions. Ensure that contractors, vendor, supplier follow HSE guidelines at site.

Developing equipment fixture as well as technical & site requirements for installation

Monitor the installation subcontractors. Coordinate with design and interface teams to solve site construction issues

Routine inspection of installations, quality, progress testing meetings and monitors team workloads to maximize performance with planning and utilization.

Plan and manage installation of Telecom equipment in Gold Line stations, Switch Box, Stabling Yard.

Supported for final commissioning and revenue operation start of Green Line of QRAIL Phase-1 2. Name of Organization : Thales Portugal S.A

Location-: Bangalore, INDIA

Duration-: From 15 July 2013 to 15 Feb 2018

Designation-: Installation Manager

Nature of Project: - Design, Procurement, Installation & testing of Telecom Systems (EPABX, CCTV, PIDS,PAS, TETRA RADIO, FOTS, BBRS, MCK, GE, SDH ETC) for Bangalore Metro Responsibilities-:

Developing project installations schedule, plans and procedures in relation to installations, method statements.

Interfacing with the construction supervision consultants to ensure required testing forms are updated as telecom required and filled properly

Pre installation inspection to insure readiness of side physical condition, drawing approvals, required accessories material requirements as per site conditions.

Ensure that contractors, vendor, supplier follow HSE guidelines at site.

Developing equipment fixture as well as technical & site requirements for installation

Monitor the installation subcontractors. Coordinate with design and interface teams to solve site construction issues

Routine inspection of installations, quality, progress testing meetings and monitors team workloads to maximize performance with planning and utilization.

Site Material planning, logistics and timely procurement in consultation with PM

Establish weekly meeting to review project status and formulate action items. Provide progress report to Project Manager.

Planning and control of Installation tests as per Contractual requirement

Coordinate and monitor ASBUILT drawings preparation and ensure sign off by customer

Support for Metro Safety Commissioner inspection

Monitor closure of testing stage snags for Final take over by client Achievements: Installed and supported T&C for successful revenue operation of 35 stations, 1 Depot and 1 OCC/BCC.

3. Name of Organization : Schneider Electric India Pvt Ltd ( BU ) Location-: NCR ( Delhi )

Duration-: From Oct 2011 to July 2013

Designation-:Sr.Project Engineer

Nature of Project: - Integrated Building Automation System, Fire Alarm System, Access Control System, P.A.System & CCTV Systems

Responsibilities-:

Project co-ordination, Project scheduling.

Approval of site drawing from Client & Consultant.

Closely interface with GC/ PMC for IBMS dependences & deficiency.

Interact with multi sub-vendor and single point of contact between client and vendor.

Monitors and reports on the progress of day by day activity which would affect project cost or schedule.

Quality control with cost budgeting to complete the project as per specification and within given time frame.

Planning, Material Managements, Execution & project Co-ordination at site.

Interface to other contractors for IBMS requirement & closely follow up

Macro &Micro of the analysis of the activities involve in SITC&H of projects

Monitor closure of testing stage snags for Final take over by client A) Dr. B. R. Ambdkar Multi Specialty Hospital Noida U.P B) Holiday Inn Five star Hotel Delhi

C) Kempinski Ambience Five star Hotel CBD New Delhi 4. Name of Organization -: Sudhir Power Projects Pvt. Ltd. Location-: NCR (Delhi)

Duration-: From August’07 to Sept 2011

Designation-:Sr.Project Engineer

Key Responsibilities of Projects-:

Interfacing with Civil and Electrical contractors for IBMS requirements.

Project co-ordination, Project scheduling with Site Manager.

Approval of System drawing from Client & Consultant.

Monitoring multi sub-vendor and single point of contact for installation testing commissioning.

Quality control with cost budgeting to complete the project as per specification and within given time frame.

Planning, Material Managements, Execution & project Co-ordination at site.

Technical & commercial evaluation of offers

Involve in Supply Installation Testing & Handover of projects’

Submission of as built drawing, Snag closure.

A) DMRC Phase#2 Projects

• BE-20 Stations (Dilshad Garden to Mansarover Park & Adarsh Nagar to Jahangir puri) working for BMS & Fire Alarm System.

• BE-19 Anand Vihar Corridors, BE-21 Noida Corridor & BE-22 (Kutub Minar to Arjangarh) working for Fire Alarm System.

• Yamuna depot & Sultanpur Depot working for Access Control System & Fire Alarm System.

• BE-26 (Lajpat Nagar to Badarpur Corridor) working for Fire alarm System also Monitoring E&M Works B) CPWD/CWG/SPM Talkatora Stadium working for SCADA 5. Previous Experience : Projects in Integrated Building Automation System, Fire Alarm System, Access Control System, P.A. System & CCTV Systems

• Name of Organization -: Ms Fire Pro Systems Pvt. Ltd

• Name of Organization -: Siemens Building Technologies

• Name of Organization -: M/S JOHNSON CONTROLS (I) PVT LTD.

• Name of Organization -: M/S LML LTD.

PERSONAL DETAILS

DOB / Age : 25-02-1977

Marital Status : Married

Permanent Address : Vill-Ranapur, Post-Nisgar

: Distt- RaiBarelI 229202 (U.P), INDIA

Language Known : Hindi & English



Contact this candidate