Post Job Free

Resume

Sign in

Power Plant Piping

Location:
Cebu City, Cebu, Philippines
Salary:
1500$
Posted:
February 05, 2020

Contact this candidate

Resume:

Neil B. Avanceña

Purok African Daisy Looc, Lapu- Lapu City Cebu 6015

Mobile number: 092********

Phone number: 032-***-****

Email Address : adbmp0@r.postjobfree.com

PERSONAL DATA:

Passport no.: P871345A

Issue Date: September 12, 2018

Expiration Date: September 11, 2028

Date of Birth: September 27, 1979

Age: 40years old

Status: Married

Religion: Roman Catholic

Objective

To share and develop more of my skills and commit myself to serve and uphold the goals and ideals of the company that I will be employed.

Education

Secondary : Babag National High School

1992-1996

Primary: Looc Elementary School

1986-1992

Skills & Abilities

Ability to thrive in a demanding environment requiring a high degree of deadline-driven

productivity, commitment, adaptability, communication, initiative and follow-through

Strong attention to detail and commitment to deliver quality results.

Able to work well under pressure, achieving excellent results in every task undertaken.

A team player that is also able to perform as an individual under minimum supervision.

Highly adaptable and resilient, thriving on challenges.

Experience

STATUS MARITIME CORP.

PRINCIPAL: AVIN INTERNATIONAL CORP.

NAME OF VESSEL: MT EPISKOPI

POSITION: MESSMAN

S/ON DATE: DEC. 5, 2017 – S/OFF DATE: SEPT. 7, 2018

Duties and Responsibilities:

Preparing Foods.

Good Housekeeping Accommodation in the Vessel.

STATUS MARITIME CORP.

PRINCIPAL: AVIN INTERNATIONAL CORP.

NAME OF VESSEL: MT KRITI DIAMOND

POSITION: MESSMAN

S/ON DATE: DEC. 1, 2018 – S/OFF DATE: SEPT. 26, 2019

Duties and Responsibilities:

• Preparing Foods.

• Good Housekeeping Accommodation in the Vessel.

Main Contractor: GS ENGINEERING & CONSTRUCTION

Company: SUNCHANG

AKCHALAK, UZBEKISTAN

Position: IRON WORKER IN PIP[ING SUPPORT DEPT.

August 23, 2014 to August 23,2015

Roles & Responsibilities:

Read and Interpret blue print drawing, general arrangement drawing.

Layout, Fit-up and Tack Welding.

Gas cutting and Grinding using power tools.

Punching and Drilling.

Install piping support base on drawing design.

Follow instruction to my superior or foreman.

Follow the rules and Regulations regarding safety.

Cleaning the area before and after work.

.

Main Contractor: GS ENGINEERING & CONSTRUCTION

Client: TAKREER

Company: IWI LIMITED ABUDHABI

Al-Ruwais Refinery Expansion Project (RRE2)

Position: IRON WORKER IN PIPING SUPPORT DEPT.

November. 26, 2012 to August 5, 2013

Main Contractor: SAMSUNG ENGINEERING

Client: TAKREER

Company: IWI LIMITED ABUDHABI

Al-Ruwais Fertil 2 Urea/ Ammonia Expansion Project

Position: IRON WORKER IN PIPING SUPPORT DEPT.

August 6, 2012 to November 25, 2012

Roles & Responsibilities:

• Read and Interpret blue print drawing, general arrangement drawing.

• Layout, Fit-up and Tack Welding.

• Gas cutting and Grinding using power tools.

• Punching and Drilling.

•Install piping support base on drawing design.

• Follow instruction to my superior or foreman.

• Follow the rules and Regulations regarding safety.

• Cleaning the area before and after work.

Main Contractor: Arabian Bemco Contractor Company Ltd/Doosan

Client: Saudi Electric Company (SEC)

Company: SEJONG CORPORATION

Position:IRON WORKER IN PIPING SUPPORT DEPT.

Project: QURRAYAH COMBINE CYCLE POWER PLANT PROJECT

April 3, 2011 to May 19, 2012

Roles & Responsibilities:

• Read and Interpret blue print drawing, general arrangement drawing.

• Layout, Fit-up and Tack Welding.

• Gas cutting and Grinding using power tools.

• Punching and Drilling.

•Install piping support base on drawing design.

• Follow instruction to my superior or foreman.

• Follow the rules and Regulations regarding safety.

• Cleaning the area before and after work.

Structural Fabricator

COLLORADO SHIPYARD CORPORATION

Oct. 4, 2010 – March 29, 2011

•Project involvement at Tuhaa Phae Project

Fabricator

GULF PIPING CO W.L.L.

January 25, 2007- October 2, 2009

• Project involvement at GPC W.L.L (to mention few)

OIL RIGS AND VOUYA PROJECT

Roles & Responsibilities:

• Read and Interpret blue print drawing, general arrangement drawing.

• Layout, Fit-up and Tack Welding.

• Gas cutting and Grinding using power tools.

• Punching and Drilling.

•Fabricate structure base on drawing design.

• Follow instruction to my superior or foreman.

• Follow the rules and Regulations regarding safety.

• Cleaning the area before and after work.

Fabricator

KMPE Co.

Salvage Road, Looc, Lapu-Lapu City

July, 2005- December, 2006

Roles & Responsibilities:

• Read and Interpret blue print drawing, general arrangement drawing.

• Layout, Fit-up and Tack Welding.

• Gas cutting and Grinding using power tools.

• Punching and Drilling.

•Fabricate structure base on drawing design.

• Follow instruction to my superior or foreman.

• Follow the rules and Regulations regarding safety.

• Cleaning the area before and after work.

TRAINING ATTENDED:

ALUMINUM FABRICATION/INSTALLATION

UNITRADE TRAINING & TRADE TEST CENTER

Rotary Club of Mactan-Training Center

May 7, 2010 to August 7, 2010

•Fabricate aluminum frame and drilling cutting, revets

•Install courting wall, mullon, section bold shoe brackets, pressure plate cover

•Install Transome, Norton tape aluminum lowvers.

TRAINING ATTENDED:

SHIELDED METAL ARC WELDING(SMAW)/NCII

TECHNICAL EDUCATION AND SKILL DEVELOPMENT

ISSUED ON:FEB,13,2016

VALID UNTIL:FEB.12 2021



Contact this candidate