CAREER OBJECTIVES

*** *** ****, ******, ********

+63-956*******

adbmif@r.postjobfree.com

To pursue a challenging career and be a part of a progressive company that gives a scope to enhance my knowledge and utilizing my skills towards the growth of the company as well as gaining experiences that will help me learn and further develop as a professional. EDUCATION

Tertiary 2009 – 2015 Lyceum of the Philippines University – Batangas Secondary 2005 – 2009 Sta. Teresa College

Elementary 1999 – 2005 San Juan-Sto. Niño Elementary School BS Mechanical Engineering PROFESSIONAL LICENSE

CSWIP 3.1 License No: 000******* Date Taken: November 2018 Registered Mechanical Engineer License No: 0089400 Date Taken: September 2015 WORK EXPERIENCE

MHPS (Philippines), Inc.

AG&P Special Economic Zone San Roque, Bauan, Batangas June 2016 up to May 2019 Position: QC ENGINEER 1

Duties and Responsibilities:

Reviews project specifications / code requirements, respective procedure, work methodology and ITP / IPS, etc.

Implements the Inspection and Test Plan and Inspection Procedure Standard accordingly.

Conducts daily inspection and test as required in the ITP such as material receiving inspection, positive material identification

(PMI) inspection, lay-out inspection, fit-up inspection, welding inspection, visual & dimensional inspection, blasting / painting inspection and final inspection on fabrication of the following component such as Boiler and Pressure vessel, Water Wall Panels, Headers, Tube coils, HRSG, Structural Parts of Power and Industrial Plant.

Perform Risk Based Maintenance Inspection on Thermal Power Plants and assist in Replica Inspection for material testing; perform NDE activities.

Witness hydrostatic test in accordance with ASME / METI Code and work instruction.

Prepares the required records / documentation of inspected item in accordance with ITP and costumer requirements.

Reports any nonconforming products and processes; prepares nonconformity reports accordingly.

Participates in the disposition of nonconforming items / products. Initiates activities to clear outstanding items in the non- conformity punch list.

Check / monitors subcontractor’s quality performance.

Witness Welder’s Qualification Testing and Welding Procedure Qualification Testing.

Conduct presentation of products to be witnessed by Authorized Inspector or Customer.

Attends internal project coordination meetings.

SITEWORK ASSIGNMENTS

SCPC Unit 1 (Calaca, Batangas)

Assist Japanese Technical Advisor in gathering data for Combustion Tuning April 18, 2017 – April 21, 2017

SLPGC Unit 3 (Calaca, Batangas)

Boiler Tube Inspection (RBM) and Replica Inspection November 20, 2017 – November 28, 2017

SCPC Unit 2 (Calaca, Batangas)

Replacement of Burner Panels, Furnace Lower Panels, R11 and R13 Reheater Tubes, Orifice December 17, 2017 – Feb. 26, 2018

Team Energy Pagbilao Unit 1 (Pagbilao, Quezon)

Bifurcate tubes replacement

April 1, 2018 – April 20, 2018

SCPC Unit 2 (Calaca, Batangas)

Emergency repair of Side Wall Panels

May 17, 2018 to May 28, 2018

Team Energy Pagbilao Unit 2 (Pagbilao, Quezon)

Replacement of Bifurcate tubes, LP Feedwater Heater, MBFP 4V-2C Discharge Valve, Tubes at Secondary Reheater and Primary Superheater, and inspection of Desuperheater Spray Nozzle June 4, 2018 – July 3, 2018

SMC Consolidated Power Unit 2 (Limay, Bataan)

Boiler Tube Inspection (RBM) and Replica Inspection July 6, 2018 – July 17, 2018

Team Energy Pagbilao Unit 2 (Pagbilao, Quezon)

Emergency repair of Hopper Panel and Side Wall Panel August 1, 2018 – August 6, 2018

SKILLS

Performs Welding Inspection

Performs Non-Destructive Examination such as Liquid Penetrant, and Magnetic Particle Testing

Knowledgeable in Radiographic Testing, Ultrasonic Testing, and Eddy Current Testing

Knowledgeable in AutoCAD and Microsoft Office

SEMINARS AND TRAINING ATTENDED

AFFILIATIONS

Philippines Society of Mechanical Engineers - Member (2015-Present)

Philippine Welding Society, Inc. - Member (2015-2016)

Philippine Society for Nondestructive Testing, Inc. - Member (2015-2016) PERSONAL INFORMATION

Gender : Male

Date of Birth : January 19, 1993

Height : 167 cm

Nationality : Filipino

Birthplace : Mabini, Batangas

Weight : 65 kg

Civil Status : Married

Religion : Roman Catholic

Language Spoken : English, Filipino

REFERENCES

Dr. Conrado I. Dotong

Dean, College of Engineering

Lyceum of the Philippines University Batangas

+63-919-***-****

I hereby certify that the foregoing information are true and correct to the best of my knowledge and belief. Kure C. Gonda

CSWIP 3.1 Welding Inspectors Course TWI Certification Ltd. – November 12-16, 2018

BOSH Training Course Synerquest Management Consultancy Services Inc. – September 2017

Magnetic Particle Examination – Lvl. 2 Certification MHPS-Philippines Inc. – August 18, 2017

Liquid Penetrant Examination – Lvl. 2 Certification MHPS-Philippines Inc. – July 17, 2017

Visual Examination – Lvl. 2 Certification MHPS-Philippines Inc. – June 7, 2017

Confined Space Safe Entry Course with Workshop Safeline Consultancy Inc. – September 6, 2016

Eddy Current Testing – Level 2 Training Course Philippine Nuclear Research Institute – April 11-22, 2016

Ultrasonic Testing – Level 2 Training Course Philippine Nuclear Research Institute – March 7-18, 2016

Radiographic Testing – Level 2 Training Course Philippine Nuclear Research Institute – February 9-22, 2016

Welding Inspectors Course Metals Industry Research and Development Center – January 19-23, 2016

Basic Training (Offshore Safety) Philippine Seafarers Training Center – November 24-December 2, 2015 Engr. Renato T. Banaga

Vice-President, Philippine Society

for Nondestructive Testing

+63-917-***-****

Engr. Geronimo C. Ducusin

Department Manager, Quality Assurance Dept.

MHPS (Philippines) Inc.

+63-917-***-****

Team Energy Sual Unit 1 (Sual, Pangasinan)

Replacement of High Temperature Reheater Panel, Side Wall tubes, Desuperheater Pipeline September 5, 2018 – October 18, 2018