JUSTINIANO M. LUNAR, JR.

Bldg. ***, St. ***

Al Khor, State of Qatar

Contact No. +974-********

E-mail: adbm4h@r.postjobfree.com

APPLICATION FOR : MEP PROJECT or CONSTRUCTION MANAGER Thirty-Six (36) Years Of Total Extensive Work Experience: T w e n t y - Four (24) years in Project Management and Administration of M E P Construction, Installation and Facilities Management; Seven (7) yrs. in construction of FIFA Standard Stadium (Al Bayt Stadium) State-of-the-Art Academy and Training Facilities (Aspire Academy Expansion) and Mall Facilities (Mall of Qatar);

Seven (7) years in construction in the field of oil and gas industry (Saudi Aramco);

Two (2) years in Airport Construction for Air Traffic Control System, Meteorological Equipment, and Special Electrical System (Hamad International Airport);

Eight (8) years in Commercial Building Complex (DAP & CAP) facilities management; and

Twelve (12) years total as Engineer and Technician in Commercial and Industrial Building Maintenance and Repair Works.

Objective:

To impart and practice my accrued knowledge in project management and installation in the general field of construction, gained through years of extensive practice and work experiences.

EMPLOYMENT RECORD:

PANY : LEONARDO

PROJECT TITLE : AL BAYT STADIUM

EMPLOYMENT PERIOD : MAR. 2017 to PRESENT - 2 Yrs. & 10 Months POSITION : ELECTRICAL CONSTRUCTION MANAGER

Duties and Responsibilities:

1. Conducts review of Project’s IFC Design Drawings and Shop Drawings, Specifications, and all relevant documentations for complete Electrical System with emphasis on LV and ELV Electrical Containments, System Devices and Interfaces. 2. Review material submission, method statements, ITP and other submissions related to my scope of works submitted by various subcontractors, before approving for client submission. 3. Initiate formulation and design of construction related documents for progress to be submitted to planning and Project Management Team.

4. Recruit and selection of Site Engineers to be deployed for construction activities. 5. Manage daily site installation works initiated by site engineers and sub-contractors for all required containments of LV and ELV, such as cable trays, trunks, PVC and GI conduits in order to attain required progress and completion according to construction schedule. 6. Manage coordination and installation of final fix devices from different sub-contractors to attain mechanical completion of each area,

7. Directly supervise and manage the network link installation works for the interfacing of elevator and escalators.

8. Conduct periodical meeting with sub-contractor and other stake holders to trace out issues and difficulties that affect construction activities. Ensure that all issues affecting construction by sub-contractors are being addressed.

9. Liaise with the main contractor with regards to issues affecting construction. 10. Attend periodical Management Meeting and provide reports according to the current status and progress of construction.

11. Directly report to Project Manager related construction activities, issues and progress for his reference and action.

COMPANY : AMUSEMENT WHITE WATER

PROJECT TITLE : DAHAB MOUNTAIN PROJECT-SALWA BEACH RESORT EMPLOYMENT PERIOD : JAN. 1, 2017 to FEB. 2017 - 2 Months POSITION : MEP MANAGER

NOTE: FEBRUARY 2017 MEP SCOPE OF WORKS WERE DE-SCOPE TO AWW DUE TO VERY LATE SUBMISSIONS OF REQUIRED

DESIGNS FROM DUBAI.

Duties and Responsibilities:

1. Conducts review of Project’s IFC Design Drawings, Specifications, and relevant documentations for complete MEP System of the project 2. Review shop drawings and material submissions, method statements, ITP from head office in Dubai before initiating the submission to ensure correctness and follows local requirement and standards.

3. Liaise with the main contractor with regards to issues affecting MEP document submission to ensure consultant approval.

4. Initiate construction at site of embedded PVC flanges required for facilities concrete castings. COMPANY : CONSTRUCTION DEVELOPMENT COMPANY

PROJECT TITLE : ASPIRE ACADEMY EXPANSION PROJECT

EMPLOYMENT PERIOD : AUG. 2015 to DEC. 2016 - 1 Yr. & 4 Months POSITION : MEP COORDINATOR

Duties and Responsibilities:

1. Conducts review of Project’s IFC Design Drawings and Shop Drawings, Specifications, and all relevant documentations for the complete MEP System of Aspire Academy Expansion Project with much attention and concentration to governmental statutory requirements from the Ministry of Interior and Qatar Civil Defense.

2. Facilitate coordination with different government agencies that have jurisdiction over various Electrical System that are involve in the construction, such as, MOI for CCTV and Access Control, Qatar Civil Defense for Fire alarm, Ooredoo for GSM, Tetra, Wi-Fi & Data, and Kahramaa for LV and MV System.

3. Ensure that material submittals of sub-contractors and other related documentations for the entire MEP System for consultant approval completely complies with the design requirements without any unjustified deviations.

4. Ensure that Sub-contractors submits the required material approval requests on time to relevant government agencies to obtain timely approval and avoid delay in procurement that will cause construction delay of the project.

5. Close monitoring and progress review of construction activities of different subcontractors in order to ensure adherence to approved construction schedule, quality requirements, and safely executions of all MEP Works.

7. Request recovery and mitigation plans from any subcontractors whose schedule slips unreasonably base on the approved program due to some internal and unavoidable circumstances.

8. Review the performance of the subcontractors from time to time and provide periodical reports to the Project Manager, including discrepancies and delays. 10. Facilitate proper coordination with other discipline at site to avoid clashing of works and delays.

11. Provides information and proposed corrective actions to Project Manager concerning issues that affects site construction related to electrical Works. COMPANY : URBACON TRADING AND CONTRACTING

PROJECT TITLE : MALL of QATAR w/ HOTEL & RESTAURANT EMPLOYMENT PERIOD : OCT. 2012 to AUG. 2015 – 2 Yrs. & 10 Months POSITION : MEP MANAGER

Duties and Responsibilities:

1. Conducts thorough review of project concept design concerning MEP discipline including the initial electrical load schedule of the mall for Kahramaa application of primary substation. 2. Attend to various MEP design meetings and workshops with design consultants and project architect. Provides input and comments concerning value engineering works on the MEP design concepts to help improve and economize the construction of the project. 3. Review and provide comments to all MEP drawing submittals from the design consultants to ensure compliance to the design concept, project specifications, and good engineering practice.

4. Review and provide comments in all shop drawing submittals prepared by structural and civil discipline team and sub-contractors to ensure consistencies to MEP design requirements.

5. Review tender packages for Vertical Transportation and MEP. Provide comments and inputs in their scope of supply and contractual obligation before it was sent out to various qualified bidders.

6. Review and evaluated tender technical offers for Vertical Transportation and MEP Package from various qualified tenderers. Provide comparison and summary reports including recommendation and submit to SR. MEP Manager for management evaluation and action. 7. Design and implement complete construction site electrical requirements and other support facilities. Facilitate and plan the requisition of all required materials to procurement. 8. Review and approved MEP design submittals and documents of sub-contractors for the construction of support facilities, such as labor camps, employees’ mess hall, canteen, etc.

9. Facilitate the preparation of RFI’s addressed to the design consultant to rectify issues that affects inconsistencies in MEP design drawings and specifications. 11. Initiate construction for MEP underground services that is being performed in-house until the awarding of contract to the winning MEP sub-contractors. 12. Review all submittals from the MEP subcontractors before sending to the consultant for approval.

13. Monitor the progress of MEP subcontractors by tracking his daily activities and achievement based on the subcontractor’s approved program. 14. Conducts monitoring and daily briefing to all site engineers in order to ensure the work of subcontractor is according to project requirement, quality and quantities required. 15. Ensure all deliverable requirements of subcontractor including materials are submitted on or before time to avoid delay.

16. Conducts review and provides comments on the MEP conceptual and schematic design of MOQ Five Star Hotel and Signature Restaurant based on international industry standards, sound engineering practice and authorities regulations. 17. Provides information and corrective actions to SR. MEP Manager related to issues that affects site construction.

18. Perform the duties and responsibilities of the SR. MEP Manager whenever he is on leave or official business.

COMPANY : SELEX SISTEMI INTEGRATI, SPA

LOCATION : DOHA, QATAR

PROJECT TITLE : NEW DOHA INTERNATIONAL AIRPORT – Air Traffic Control and Meteorological Special Equipment, CP - 35

EMPLOYMENT PERIOD : OCT. 2010 to OCT. 2012 – 2 Yrs. POSITION : MEP MANAGER

Duties & Responsibilities:

1. Evaluation and review of all design drawings and documentations coming from various sub-contractors pertaining to MEP and Special Systems (CCTV, Access Control System, and Fire Alarm and Detection System.) of building facilities, control tower, and airfield shelters. Provide comments and other actions necessary to the sub-contractor’s submittals before forwarding to the consultant to ensure acceptance and approval. 2. Ensure timely delivery of construction works by close monitoring the site progress and performance of various sub-contractors according to the approved work schedules and target plan pertaining to all MEP and Special System discipline. Requires the submission from any of the subcontractor’s a recovery plan whenever they slip on their schedule or required activities.

3. Provide summary reports to senior management regarding the performance of different sub- contractors concerning MEP and Special System works. 4. Facilitate procurement of additional project requirement including materials to ensure smooth construction activities that follows the required project schedule. 5. Attend to regular project meetings chaired by Engineer (Bechtel) and Consultant (ADPI) such as, Construction, Interface, Design and Progress meeting. Report the site progress to the Engineer and provides responses to technical queries being addressed by the consultant.

6. Performs the duties and responsibilities of the Construction Manager, Interface Manager and the QA/QC Manager whenever they are on vacation or on official leave of absence. COMPANY : ASYAD INTERNATIONAL CO., LTD.

LOCATION : RAS TANURA, SAUDI ARABIA (Main Office)

EMPLOYMENT PERIOD : JUL. 2003 to OCT. 2010 – 7 Yrs. & 3 Months POSITIONS : PROJECTS MANAGER / CONSTRUCTION MANAGER / PROJECT ENGINEER / PROJECTS HEAD TENDERER

PROJECTS HANDLED AND POSITION FROM JUL. 2003 to OCT. 2010: Company : Saudi Aramco, Ras Tanura Refinery – Ras Tanura Project Title : Converting Feeder #13 (13.8 KV) to Underground Cable Position : Project Manager

Period : Aug. 2010 to Oct. 2010

Duties & Responsibilities:

1. Evaluate the scope of works, design drawings and specifications of tender documents from client. Prepare cost estimates for all requirement including materials, manpower and equipment, and submit to company president for evaluation and tender submission. 2. Preparation of execution and construction plan including schedule, and submit to proponent for comment and approval.

3. Facilitate preparation and procurement for the required equipment and materials to be delivered on site as per schedule.

4. Ensure the supply of manpower requirement according to the required categories, skills, and certifications.

5. Ensure that all permits from all government agencies concerned are properly secure and ready before the commencement of any construction activities. 6. Ensure all safety measures to be in place at all times to avoid any damaged and loss to human and property.

Company : Saudi Aramco, Water Injection Facilities – Qurayyah Project Title : Fabrication and Installation of Water Injection Headers Position : Project Manager

Period : Aug. 2010 to Oct. 2010

Duties & Responsibilities:

1. Evaluate the scope of works, design drawings and specifications of tender documents. 2. Prepare cost estimates for all requirement including materials, manpower, and equipment and submit to company president for evaluation and tender. 3. Facilitate preparation and procurement for the required equipment to be delivered on the fabrication shop as per schedule.

4. Ensure the supply of manpower requirement according to the required categories, skills, and certifications.

5. Ensure that fabrication activities conform to project requirement and specifications. 6. Conducts regular meeting with Project Engineers and proponent to discuss the progress activities and important matters concerning the project. Company : Saudi Aramco, Qassim Bulk Plant – Qassim Project Title : Installation of Kerosene and Diesel Off-loading Skids Position : Project Manager

Period : Mar. 2010 to Oct. 2010

Duties & Responsibilities:

1. Evaluate the scope of works, design drawings and specifications of tender documents. Prepare cost estimates for all requirement including materials, manpower, and equipment and submit to company president for evaluation and tender. 2. Evaluate the submitted construction plan and schedule to ensure its correctness and viability according to the given site condition for implementation. 3. Facilitate preparation and procurement for the required equipment and materials to be delivered on site as per schedule.

4. Ensure manpower requirement is adequate and appropriate as per the site requirements. 5. Monitoring of construction activities to ensure conformance with agreed schedule, budgeted resources, and manpower and equipment safety. 6. Conducts Regular meeting with project engineers and proponent to discuss the progress activities and important matters concerning the project. Company : Saudi Aramco, Yanbu Refinery – Yanbu

Project Title : Installation of Gas Detection System in Marine Terminal and Tank Farm Area

Position : Project Manager

Period : Oct. 2009 to Feb. 2010

Duties & Responsibilities:

1. Evaluate the scope of works, design drawings and specifications of tender documents. Prepare cost estimates for all requirement including materials, manpower, and equipment and submit to company president for evaluation and tender. 2. Preparation of construction plan and schedule for review and implementation. 3. Execution of construction plan to meet the required deadline despite of site constraints and restrictions.

4. Close coordination with design and procurement department to ensure that required materials will be delivered on site as per schedule. 5. Ensure that project will be completed ahead of schedule in a given budget, resources and time.

6. Conducts regular meetings with project engineers and proponent to discuss the progress activities and important matters concerning the project. Company : Saudi Aramco NGL Terminal – Yanbu

Project Title : Replacement of Corroded Containments and Trestle Lightings with Cable Trays at M.O.A Berth 72 - Offshore Facilities Position : Project and Construction Manager

Period : Oct. 2008 to Jun. 2009

Duties & Responsibilities:

1. Evaluate the scope of works, estimate and submit for bidding and later enter into a negotiation with Saudi Aramco project proponent and contracts for the bid price and cost of the project.

2. Preparation of all requirements including budget, procurement and construction schedules for the implementation of the project.

3. Recruitment officer of all expatriate workers (engineers and skilled labors) from Philippines and India during the construction phase. 4. Regular meetings with project engineers and proponent to discuss the progress activities and important matters concerning the project.

5. Represent the company in all Saudi Aramco coordination meetings concerning the preparations for the construction and other requirements including manpower certification and accreditation.

Company : Saudi Aramco NGL Terminal – Yanbu

Project Title : Upgrading of Berth 71 & 72 Loading Arms, Replacement of Control Room HVAC System Including Gas Detection and Fire Alarm Systems, and Replacement of Corroded Containments with Cable Trays at M.O.A Berth 71 - Offshore facilities Position : Project and Construction Manager

Period : Sept. 2006 to Oct. 2008

Duties & Responsibilities:

1. Evaluate the scope of works, design drawings and specifications of tender documents. Prepare cost estimates for all requirement including materials, manpower, and equipment and submit to company president for evaluation and tender. 2. Preparation of all requirements including budget, procurement and construction schedules for the implementation of the project.

3. Recruitment officer of all expatriate workers (engineers and skilled labors) from Philippines and India.

4. Represent the company in all Saudi Aramco coordination meeting regarding the progress and financial requirements of the project.

5. Monitoring of engineering, procurement, and construction phase of the project. 6. Conducts periodic evaluation of progress and meeting with site engineers to correct and solved problems encountered during construction.

Company : MARAFIQ (Power & Water Utilities Co.) – Yanbu Project Title : Replacement of Security Perimeter Fence for Power Plant & Water Sewage Treatment Plant

Position : Project Manager

Period : Sept. 2007 to May 2008

Duties & Responsibilities:

1. Evaluate the scope of works, design drawings and specifications of tender documents. Prepare cost estimates for all requirement including materials, manpower, and equipment and submit to company president for evaluation and tender. 2. Preparation of all requirements including budget, procurement and construction schedules for the implementation of the project.

3. Recruitment officer of all expatriate workers (engineers and skilled labors and workers) from Philippines.

4. Represent the company in all MARAFIQ coordination meeting regarding the safety, progress and financial requirements of the project. 5. Coordinate with project proponents concerning construction problems and delays encountered in the implementation of the project

6. Monitoring of engineering, procurement, and construction phase of the project to avoid unnecessary deviations from the design.

7. Conducts periodic evaluation of progress and meeting with site engineers to correct and solved problems encountered during construction. Company : Saudi Aramco Crude Oil Terminal – Yanbu

Project Title : Replacement of Cast Iron Sewer Line with RTR pipe Position : Project Manager

Period : Sept. 2006 to Apr. 2008

Duties & Responsibilities:

1. Evaluate the scope of works, design drawings and specifications of tender documents. Prepare cost estimates for all requirement including materials, manpower, and equipment and submit to company president for evaluation and tender. 2. Preparation of all requirements including budget, procurement and construction schedules for the implementation of the project.

3. Recruitment officer of all expatriate workers (engineers and skilled labors and workers) from Philippines.

4. Represent the company in all Saudi Aramco coordination meeting regarding the safety, progress and financial requirements of the project. 5. Coordinate with project proponents concerning construction problems and delays encountered in the implementation of the project

6. Monitoring of procurement, and construction phase of the project to avoid unnecessary deviations from the design.

7. Conducts periodic evaluation of progress and meeting with site engineers to correct and solved problems encountered during construction. Company : Saudi Aramco Refinery – Yanbu

Project Title : Modification of Fire Water System at Utilities Area Position : Project Manager

Period : Aug. 2006 to May 2008

Duties & Responsibilities:

1. Evaluate the scope of work, design drawings and specifications of tender documents. Prepare cost estimates for all requirement including materials, manpower, and equipment and submit to company president for evaluation and tender. 2. Preparation of all requirements including budget, procurement and construction schedules for the implementation of the project.

3. Recruitment officer of all expatriate workers (engineers and skilled labors and workers) from Philippines.

4. Represent the company in all Saudi Aramco coordination meeting regarding the safety, progress and financial requirements of the project. 5. Coordinate with project proponents concerning construction problems and delays encountered in the implementation of the project

6. Monitoring of procurement, and construction phase of the project to avoid unnecessary deviations from the design.

7. Conducts periodic evaluation of progress and meeting with site engineers to correct and solved problems encountered during construction. Company : Saudi Aramco Refinery – Yanbu

Project Title : Construction of Three (3) Operator Shelters Position : Project Manager

Period : May 2007 to Feb. 2008

Duties & Responsibilities:

1. Evaluate the scope of work, design drawings and specifications of tender documents. Prepare cost estimates for all requirements including materials, manpower, and equipment and submit to company president for evaluation and tender. 2. Preparation of all requirements including budget, procurement and construction schedules for the implementation of the project.

3. Coordinate with project proponents concerning construction problems and delays encountered in the implementation of the project

4. Monitoring of procurement, and construction phase of the project to avoid unnecessary deviations from the design.

5. Conducts periodic evaluation of progress and meeting with site engineers to correct and solved problems encountered during construction.

Company : Hyundai Heavy Industries–Saudi Aramco Shaybah Gas Plant Project Title : E & I Construction of Co-Generation Power Plant Position : Project Head Estimator

Period : Nov. 2005 (Start Estimation Period)

Awarded : Feb. 2007

Duties & Responsibilities:

1. Evaluate the scope of works, examine the project submitted drawings and specifications, and estimates the cost of t he project for manpower and equipment then submit to the president for final tender.

2. Preparation of all requirements including budget, procurement and construction schedules for the implementation of awarded projects.

3. Recruitment officer of all expatriate workers (engineers and skilled labors) from Philippines and India during the project implementation phase. Company : Hyundai Heavy Industries – MARAFIQ Jubail Project Title : E & I Construction of Integrated Water & Power Plant Position : Project Head Estimator

Period : Dec. 2005 (Start Estimation Period)

Awarded : Oct. 2007

Duties & Responsibilities:

1. Evaluate the scope of works, examine the project submitted drawings and specifications, and estimates the cost of t h e project for manpower and equipment only then submit to the president for final tender.

2. Preparation of all requirements including budget, procurement and construction schedules for the implementation of awarded projects. 3. Recruitment officer of all expatriate workers (engineers and skilled labors) from Philippines and India during the project implementation phase. Company : Hyundai Heavy Industries – Saudi Aramco Ras Tanura Refinery

Project Title : E &I Construction of Co-Generation Power Plant Position : Construction Manager

Period : Jan. 2006 to May 2007

Duties & Responsibilities:

1. Evaluate the scope of works, design drawings and specifications of tender documents. Prepare cost estimates for all requirement including materials, manpower, and equipment and submit to Project Manager.

2. Recruitment officer of all expatriate workers (engineers and skilled labors) from Philippines.

3. Represent the company in all site coordination meeting with Tihama Power Generation, Mitsui, and HHI regarding the progress and financial requirements of the project. Coordinate with project proponents and engineers the problems and delays encountered in the implementation of the project

4. Monitoring of procurement, and construction phase of the project to avoid unnecessary deviations from the design.

5. Direct monitoring of daily construction progress. Conducts daily coordination meeting with all engineers and supervisors regarding the daily priorities and tackles site problem conditions and possible solutions.

Company : Samsung Engineering – APPC PP/PDH PLANT, Jubail Project Title : E & I Works for Polypropylene Dehygenation Plant Position : Project Head Estimator

Period : Oct. 2005 (Starting of Estimation Period) Awarded : June 2006

Duties & Responsibilities:

1. Evaluate the scope of works, examine the project submitted drawings and specifications, and estimates the cost of t he project then submit to the president for final tender. 2. Preparation of all requirements including budget, procurement and construction schedules for the implementation of awarded projects. 3. Recruitment officer of all expatriate workers (engineers and skilled labors) from Philippines and India during the project implementation phase. Company : Hyundai Heavy Industries – Saudi Aramco Shedgum Gas Plant

Project Title : E & I Construction of Co-Generation Power Plant Position : Project Head Estimator / Project Manager Period : Dec. 2004 to Dec. 2005

Duties & Responsibilities:

1. Evaluate the scope of works, design drawings and specifications of tender documents. Prepare cost estimates for all requirement including materials, manpower, and equipment and submit to Company president for final tender. 2. Preparation of all requirements including budget, procurement and construction schedules for the implementation of the project.

3. Recruitment officer of all expatriate workers (engineers and skilled labors) from Philippines and India during the project implementation phase. 4. Represent the company in all site coordination meeting with Tihama Power Generation, Mitsui, and HHI regarding the progress and financial requirements of the project. Coordinate with project proponents and engineers the problems and delays encountered in the implementation of the project

5. Monitoring of procurement, and construction phase of the project to avoid unnecessary deviations from the design.

6. Direct monitoring of daily construction progress. Conducts daily coordination meeting with all engineers and supervisors regarding the daily priorities and tackles site problem conditions and possible solutions.

Company : Saudi Aramco Mobile Refinery (SAMREF) – Yanbu Project Title : Electrical & Instrumentation Work for the Construction of Sulfur Silos

Position : Project Manager

Period : October 2004 to May 2005

Duties & Responsibilities:

1. Evaluate the scope of work given by the client, provide cost estimates for materials, equipment, and manpower required and submit to company president for inclusion of overhead and profit. Submit tender to client for approval. 2. Preparation of all requirements including budget, procurement and construction schedules for the implementation of the project.

3. Represent the company in all site coordination meeting with Yanbu Steel and SAMREF regarding the progress and financial requirements of the project. 4. Monitoring of procurement, and construction phase of the project to avoid unnecessary deviations from the design.

Company : Saudi Petro-Chemical Company (SADAF) – Jubail Project Title : Electrical & Instrumentation Works for the Construction of HRSG of Co-Generation Plant

Position : Project Engineer

Period : January 2004 to October 2004

Duties & Responsibilities:

1. Preparation of manpower, material, and equipment requirement of the project and submit to site manager for action

2. Directly supervise and monitor the construction phase of the project according to the project schedule.

3. Conduct periodical meeting with engineers and foremen regarding the progress of the project.

4. Sharing of problems and possible solutions that may help in speedy completion of individual tasks.

Company : Samsung Engineering – TASNEE Petro-Chemical Co., Jubail Project Title : E & I Works for PP/PDH Plant

Position : Site Engineer

Period : July 2003 to February 2004

Duties & Responsibilities:

1. Preparation of manpower, materials, and equipment requirement of the project according to the requirement of the project drawings and submit to site manager for action. 2. Directly supervise and monitor the construction phase of the project according to the milestone schedule. Provide staff scheduling in each area of the project building and monitors progress from time to time.

3. Coordinate with the s i t e manager f o r all requirements and problems encountered at site. COMPANY : CAP PHILS., INC.

LOCATION : SAN JOSE, ANTIQUE, PHILIPPINES

EMPLOYMENT PERIOD : AUG. 1, 1997 to FEB. 15, 2003 – 5 Yrs. & 6 Months POSITION : BUILDING ADMINISTRATOR

Duties & Responsibilities:

1. Manage the entire building facilities of the company in area including security personnel. 2. Ensure that all building facilities equipment are in good operating conditions including security installations.

3. Facilitate the