Post Job Free

Resume

Sign in

Inspection Engineer

Location:
Abu Dhabi, Abu Dhabi Emirate, United Arab Emirates
Posted:
February 04, 2020

Contact this candidate

Resume:

Jinish Ompedathil

E-mail: adbkyb@r.postjobfree.com

Mobile: +971********* (UAE)

Mobile: +919********* (INDIA)

Career Objective

For seeking a position in a high technical level with a dynamic and challenging professional environment.

Professional Summary

15 years of experience as a QA/QC Engineer/Supervisor/Coordinator & QC Inspector in Welding, Piping, Pressure vessels, Tanks, Skid and Structures in the field of Oil and gas, pipelines, petrochemical refineries, manufacturing and power plant projects etc.

Team oriented with good communication and presentation skills.

Enjoys challenging work environment with problem solving abilities.

Ability to work both independently and collectively to achieve objectives.

Hard & Smart working Under any Circumstances

Educational Qualifications

Diploma in Mechanical Engineering.

Sree Bodhi University Pondicherry (2004)

Secondary School leaving Certificate (S.S.L.C)

General Education Department Govt. of Kerala. (2001) Additional Qualifications

CSWIP 3.1-Welding Inspector

ASNT LEVEL –II

Radiographic Test (RT)

Ultrasonic Test (UT)

Penetrant Test (PT)

Magnetic Particle Test (MT)

Computer Skills

Experienced Office Package: Microsoft Word, Microsoft Excel, Microsoft PowerPoint, Microsoft Outlook Express, Amogh and ERP

Experience Summary

I) Designation: QC Coordinator / Welding & NDT Inspector Company : PETROJET ABU DHABI

Client : ADNOC (Abu Dhabi National Oil Company)

Project : EPC for Rumaitha and Shanayel Restoration & 20% Technical Rate Project Tenure : 10-June-2019 to 30-Jan-2020

Responsibility

Carrying out weekly meetings with client and TPI inspectors and gathering/forecasting information for a smooth on-site work plan.

Review and verification of material Test Certificate to ensure compliance with Shell Dep, Codes, Standards and ITP.

Review of batch certificate and Verification of welding consumable as per Shell Dep, Codes, Standards and ITP.

Witnessing Welder performance qualification test.

Witnessing PQR qualification test and review the PQR & WPS documents.

Witnessing PQR qualification test of Hot Tapping.

Coordinating with Construction/production teams on day to day problems at site and following up on the same.

To conduct fit up and dimension inspections as per Inspection and Test Plan (ITP) and to provide technical guidance for welding sequence and distortion control.

Conducting site monitoring welding inspections with ADCO to confirm subcontractor’s adherence to project specifications.

Witnessing Tie in joint activities such as marking, thickness gauging, fit up, welding and NDT.

Witnessing and coordinating for flange/gasket/bolt torqueing in site.

Close monitoring of material handling and storage during various stages of fabrication and erection.

Ensure that all ITP, QCP, SHELL DEP, Project Specifications, codes and standards are being followed during the pre-fabrication and erection activities.

Carrying out the welding inspection before, during and after welding operation as per approved WPS, ITP, relevant engineering drawing, Shell Dep and project specification.

Guiding welders and explaining the company welding procedures.

Calibration control of welding machine, heat treatment equipment’s, inspection tools and other equipment’s as per project requirement.

Checking of welding consumable handling, storage and electrode Baking/Holding as per procedure.

Review the spool release packages from pre-fabrication shop and releasing the spools for further activities.

Releasing painted spools for erection by prioritizing the level of urgency.

Coordinating with subcontractor for each NDT activities.

Coordinating with ADCO for all inspection activities as per ITP. II) Designation : NDT & Welding Inspector

Company : Maire Tecnimont Spa

Client : ADCO (Abu Dhabi Company for Onshore Petroleum Operations) Project : EPC for Al Dabbiya Surface Facilities Project – Phase III Tenure : 16-Aug-2016 to 30-April-2019

Responsibility

Carrying out weekly meetings with client and TPI inspectors and gathering/forecasting information for a smooth on-site work plan.

Review and verification of material Test Certificate to ensure compliance with Shell Dep, Codes, Standards and ITP.

Review of batch certificate and Verification of welding consumable as per Shell Dep, Codes, Standards and ITP.

Witnessing Welder performance qualification test.

Witnessing PQR qualification test and review the PQR & WPS documents.

Witnessing PQR qualification test of Hot Tapping.

Coordinating with Construction/production teams on day to day problems at site and following up on the same.

To conduct fit up and dimension inspections as per Inspection and Test Plan (ITP) and to provide technical guidance for welding sequence and distortion control.

Conducting site monitoring welding inspections with ADCO to confirm subcontractor’s adherence to project specifications.

Witnessing Tie in joint activities such as marking, thickness gauging, fit up, welding and NDT.

Witnessing and coordinating for flange/gasket/bolt torqueing in site.

Close monitoring of material handling and storage during various stages of fabrication and erection.

Ensure that all ITP, QCP, SHELL DEP, Project Specifications, codes and standards are being followed during the pre-fabrication and erection activities.

Carrying out the welding inspection before, during and after welding operation as per approved WPS, ITP, relevant engineering drawing, Shell Dep and project specification.

Guiding welders and explaining the company welding procedures.

Calibration control of welding machine, heat treatment equipment’s, inspection tools and other equipment’s as per project requirement.

Checking of welding consumable handling, storage and electrode Baking/Holding as per procedure.

Review the spool release packages from pre-fabrication shop and releasing the spools for further activities.

Releasing painted spools for erection by prioritizing the level of urgency.

Conducting the walk-through inspection of completed piping system with respect to Isometric, P&ID, GA.

Preparing all piping punch lists and verifies all items are in place and act as an agent for Company during punch list activity.

Witness the Hydro test of Piping System as per LDT and Isometric.

Review the hydro test packages and prepare the punch list.

Coordinating with subcontractor for each NDT activities.

Coordinating with ADCO for all inspection activities as per ITP. III) Designation : QC Engineer

Company : Qatar Engineering Construction Company WLL (QCON-UAE) Client : ADGAS (Abu Dhabi Gas Liquefaction Co. Limited) Project : EPC FOR FER PROJECT PACKAGE 3 SRU SCHEME 8 & 16 (DAS ISLAND) Tenure : 10-Oct-2014 to 9-Aug-2016

Responsibility

Carrying out weekly meetings with clients and TPI inspectors and gathering/forecasting information for a smooth on-site work plan.

Review and verification of material Test Certificate to ensure compliance with Project Specifications, Codes, Standards and ITP.

Review of batch certificate and Verification of welding consumable as per Project Specifications, Codes, Standards and ITP.

Witnessing Welder performance qualification test.

Witnessing PQR qualification test and review the PQR & WPS documents.

Coordinating with Construction/production teams on day to day problems at site and following up on the same.

To conduct fit up and dimension inspections as per Inspection and Test Plan (ITP) and to provide technical guidance for welding sequence and distortion control.

RT film verification and evaluation of rejected joints. Conducted awareness sessions to welders/ welding foremen on weld defects, welding quality, and welding safety.

Witnessing Tie in joint activities such as marking, thickness gauging, fit up, welding and NDT.

Witnessing and coordinating for flange/gasket/bolt torqueing in site.

Witnessing and monitoring of jacketed piping fabrication.

Witnessing of Weld visual inspection of jacketed piping.

Witnessing of Valve Inspection as per API-598.

Close monitoring of material handling and storage during various stages of fabrication and erection.

Coordinating with subcontractor for each NDT activities.

Ensure that all ITP, QCP, Project Specifications, codes and standards are being followed during the pre-fabrication and erection activities.

Carrying out the welding inspection before, during and after welding operation as per approved WPS, ITP, relevant engineering drawing, and project specification.

Guiding welders and explaining the company welding procedures.

Calibration control of welding machine, heat treatment equipment’s, inspection tools and other equipment’s as per project requirement.

Checking of welding consumable handling, storage and electrode Baking/Holding as per procedure.

Organizing, monitoring and reviewing of PWHT chart and reports.

Review the spool release packages from pre-fabrication shop and releasing the spools for further activities.

Releasing painted spools for erection by prioritizing the level of urgency.

Conducting the walk-through inspection of completed piping system with respect to Isometric, P&ID, GA.

Preparing all piping punch lists and verifies all items are in place and act as an agent for Company during punch list activity.

Witness the Hydro test of Piping System as per LDT and Isometric.

Review the hydro test packages and prepare the punch list.

Preparation of project dossier and documentation.

Coordinating commissioning activities.

Coordinating with ADGAS for all inspection activities as per ITP. IV) Designation : QC Inspector (Welding & Piping)

Company : ABJ Engineering & Contracting Company K.S.C (closed), Kuwait.

(Kharafi National Fabrication Facility)

Clients : Total E&P UK Ltd, Saipem S.p.a, Petrofac, KOC, KNPC Project : Laggan Tormore Project (Shetland gas plant project) UK, Building New Booster Station BS 171 at West Kuwait, Building New Booster Station BS 160 at West Kuwait, EPC for Asab FFD Project (Lift Gas Dehydration package), EPC for Asab FFD Project (Pressure Vessels)

Tenure : 02-Mar-2010 to 15-Jun-2014

Responsibility

Carrying out weekly meetings with clients and TPI inspectors and gathering/forecasting information for a smooth on-site work plan.

Review and verification of material Test Certificate to ensure compliance with Project Specifications, Codes, Standards and ITP.

Review of batch certificate and Verification of welding consumable as per Project Specifications, Codes, Standards and ITP.

Witnessing Welder performance qualification test.

Witnessing PQR qualification test and review the PQR & WPS documents.

Coordinating with Construction/production teams on day to day problems at fabrication shop and following up on the same.

To conduct fit up and dimension inspections as per Inspection and Test Plan (ITP) and to provide technical guidance for welding sequence and distortion control.

RT film verification and evaluation of rejected joints. Conducted awareness sessions to welders/ welding foremen on weld defects, welding quality, welding safety.

Witnessing Tie in joint activities such as marking, thickness gauging, fit up, welding and NDT.

Witnessing and coordinating for flange/gasket/bolt torqueing in site.

Close monitoring of material handling and storage during various stages of fabrication and erection.

Coordinating with subcontractor for each NDT activities.

Ensure that all ITP, QCP, Project Specifications, codes and standards are being followed during the pre-fabrication and erection activities.

Carrying out the welding inspection before, during and after welding operation as per approved WPS, ITP, relevant engineering drawing, and project specification.

Guiding welders and explaining the company welding procedures.

Calibration control of welding machine, heat treatment equipment’s, inspection tools and other equipment’s as per project requirement.

Checking of welding consumable handling, storage and electrode Baking/Holding as per procedure.

Organizing, monitoring and reviewing of PWHT chart and reports.

Review the spool release packages from pre-fabrication shop and releasing the spools for further activities.

Releasing painted spools for erection by prioritizing the level of urgency.

Witnessing skid structurel, equipments, piping members erection.

Witnessing hydro test activities of skid assembly.

Witnessing various stage of skid assembly.

Final inspection of skid assembly with respect to the P&ID, Isometric drawing and GA.

Witnessing pneumatic test of skid assembly full system.

Final dimension inspection of fabricated piping spools.

Preparation of Final Dispatch spool release.

To conduct final dimension and weld visual inspection of Pressure vessel fabrication as per ITP.

Witnessing Pneumatic test of RF Pads for Nozzles.

Conducting the walk through inspection of completed pipe rack modules with respect to Isometric, P&ID, GA.

Preparing all piping punch lists and verifies all items are in place and act as an agent for Company during punch list activity.

Witness the Hydro test of Piping System as per LDT and Isometric.

Review the hydro test packages and prepare the punch list.

Coordinating with KOC, KNPC, SAIPEM, PETROFAC, PETRECO, TOTAL, and TPI for all inspection activities as per ITP.

V) Designation : QC Inspector Mechanical

Company : Black Cat Engineering & Construction. W.L.L Doha Qatar Client : QATAR PETROLEUM (ON SHORE)

Project : EPIC for replacement of V-2003 (GLYCOL SEPARATOR) and installation of air cooler at NGL-2/Mesaieed

: EPIC for smokeless flare & automatic blow down system & new control room at FSP/Dukhan

Tenure : 15-May-2008 to 04-Feb- 2010

Responsibility

Familiar with P&ID, Isometric and Equipment Drawing.

Material verification with the support of drawing and mill test certificate (MTC)

Close monitoring of material handling and storage during various stages of construction.

To conduct fit up and dimension inspections as per Inspection and Test Plan (ITP) and to provide technical guidance for welding sequence and distortion control.

Ensure that all inspection and test plan, quality control procedures, project specification, codes and standards are being followed during the production activities.

Witnessing Weld visual inspection & preparing report.

Witnessing Welder performance qualification test.

Witnessing PQR qualification test.

Carrying out the welding inspection before, during and after welding operation as per approved WPS, test plan, relevant engineering drawing, international standard and project specification.

Coordinating for all NDT activities such as RT, LPI, MPI, UT, PWHT&AUT as per the project requirements and specification.

RT film verification and evaluation of rejected joints. Conducted awareness sessions to welders/ welding foremen on weld defects, welding quality, welding safety

Witnessing Tie in joint activities

Marking all tie in joint with respect to drawing.

Coordinating all NDT activities of tie in joints.

Calibration control of welding, heat treatment equipment’s, and inspection tools and equipment’s as per company procedure.

Review test package and line walk down.

Organizing, monitoring and evaluating PWHT

Witnessing the Post weld Heat treatment process AS PER APPROVED COMPANY PROCEDURE

Checking of consumable specifications, handling, storage, and treatment during welding.

Witness the Hydro test of Piping System AS PER APPROVED COMPANY PROCEDURE

Witnessing of hydro test, preparation of test pack & line check

Preparation of checklists, punch lists, mechanical clearance, and inspection release reports.

Final dimension inspection of fabricated piping spools.

Review the spool release package and releasing the spools for further activities.

Preparation of Final Dispatch spool release.

Preparing all piping punch lists and verifies all items are in place and act as an agent for Company during punch list activity.

Coordinating commissioning activities.

Verifying heavy equipment documents with the project requirements. VI) Designation : QC Engineer

Company : Karpara Project Engineering (P) Ltd

Client : ADITYA BIRLA

Project : 2x23 MW TPP Project / Madya Pradesh

Tenure : 21-Dec-2007 to 13-Mar-2008

Responsibilities

Familiar with Equipment Drawing.

Material verification with the support of drawing and mill test certificate (MTC)

Close monitoring of material handling and storage during various stages of construction.

To conduct fit up and dimension inspections as per Inspection and Test Plan (ITP) and to provide technical guidance for welding sequence and distortion control.

Ensure that all inspection and test plan, quality control procedures, project specification, codes and standards are being followed during the production activities.

Witnessing Weld visual inspection & preparing report.

Witnessing Welder performance qualification test.

Carrying out the welding inspection before, during and after welding operation as per approved WPS, test plan, relevant engineering drawing, international standard and project specification.

Coordinating for all NDT activities such as RT, LPI, MPI, UT, PWHT as per the project requirements and specification.

RT film verification and evaluation of rejected joints. Conducted awareness sessions to welders/ welding foremen on weld defects, welding quality, welding safety

Calibration control of welding, heat treatment equipment’s, and inspection tools and equipment’s as per company procedure.

Organizing, monitoring and evaluating PWHT

Witnessing the Post weld Heat treatment process AS PER APPROVED COMPANY PROCEDURE

Checking of consumable specifications, handling, storage, and treatment during welding.

Coordinating commissioning activities.

Verifying heavy equipment documents with the project requirements.

Witnessing the sequence erection activities and dimensional inspection for all boiler pressure parts and non-pressure parts items.

Witnessing Boiler Drum installation and dimensional check.

Witnessing Pre-Parts and Equipment erection.

Preparation of project dossier and documentation.

Witnessing and monitoring of jacketed piping fabrication. VII) Designation : QC Engineer

Company : Bhavani Erectors (P) Ltd

Contractor : Bharat Heavy Electrical Ltd

Client : NTPC & SAIL (NSPCL)

Project : 2x250 MW TPP Project / Bhillai

Tenure : 10-Aug-2006 to 9-Dec-2007

Responsibilities

Familiar with Equipment Drawing.

Material verification with the support of drawing and mill test certificate (MTC)

Close monitoring of material handling and storage during various stages of construction.

To conduct fit up and dimension inspections as per Inspection and Test Plan (ITP) and to provide technical guidance for welding sequence and distortion control.

Ensure that all inspection and test plan, quality control procedures, project specification, codes and standards are being followed during the production activities.

Witnessing Weld visual inspection & preparing report.

Witnessing Welder performance qualification test.

Carrying out the welding inspection before, during and after welding operation as per approved WPS, test plan, relevant engineering drawing, international standard and project specification.

Coordinating for all NDT activities such as RT, LPI, MPI, UT, PWHT as per the project requirements and specification.

RT film verification and evaluation of rejected joints. Conducted awareness sessions to welders/ welding foremen on weld defects, welding quality, welding safety

Calibration control of welding, heat treatment equipment’s, and inspection tools and equipment’s as per company procedure.

Organizing, monitoring and evaluating PWHT

Witnessing the Post weld Heat treatment process AS PER APPROVED COMPANY PROCEDURE

Checking of consumable specifications, handling, storage, and treatment during welding.

Coordinating commissioning activities.

Verifying heavy equipment documents with the project requirements.

Witnessing the sequence erection activities and dimensional inspection for all boiler pressure parts and non-pressure parts items.

Witnessing Boiler Drum installation and dimensional check.

Witnessing Pre-Parts and Equipment erection.

Preparation of project dossier and documentation. Witnessing and monitoring of jacketed piping fabrication. VIII) Designation : QC Engineer

Company : Bhavani Erectors (P) Ltd

Contractor : Bharat Heavy Electrical Ltd

Client : Jindal Stainless Ltd (JSL)

Project : 2x125 MW TPP Project / Orissa

Tenure : 25-Oct-2005 to 2-Aug-2006

Responsibilities

Familiar with Equipment Drawing.

Material verification with the support of drawing and mill test certificate (MTC)

Close monitoring of material handling and storage during various stages of construction.

To conduct fit up and dimension inspections as per Inspection and Test Plan (ITP) and to provide technical guidance for welding sequence and distortion control.

Ensure that all inspection and test plan, quality control procedures, project specification, codes and standards are being followed during the production activities.

Witnessing Weld visual inspection & preparing report.

Witnessing Welder performance qualification test.

Carrying out the welding inspection before, during and after welding operation as per approved WPS, test plan, relevant engineering drawing, international standard and project specification.

Coordinating for all NDT activities such as RT, LPI, MPI, UT, PWHT as per the project requirements and specification.

RT film verification and evaluation of rejected joints. Conducted awareness sessions to welders/ welding foremen on weld defects, welding quality, welding safety

Calibration control of welding, heat treatment equipment’s, and inspection tools and equipment’s as per company procedure.

Organizing, monitoring and evaluating PWHT

Witnessing the Post weld Heat treatment process AS PER APPROVED COMPANY PROCEDURE

Checking of consumable specifications, handling, storage, and treatment during welding.

Coordinating commissioning activities.

Verifying heavy equipment documents with the project requirements.

Witnessing the sequence erection activities and dimensional inspection for all boiler pressure parts and non-pressure parts items.

Witnessing Boiler Drum installation and dimensional check.

Witnessing Pre-Parts and Equipment erection.

Preparation of project dossier and documentation. Witnessing and monitoring of jacketed piping fabrication. IX) Designation : Junior QC Engineer

Company : T.P.S Builders Ltd

Tenure : 3-July-2004 to 19-Oct-2005

Project Handled

Project : FCCU Project Kochin Refinery Ltd / Kerala Contractor : Engineers India Limited

Client : Kochin Refinery Ltd

Personal Details

Fathers Name : Gangadharan Ompedathil

Age & Date of Birth : 32, 04-Apr-1985

Sex : Male

Marital Status : Married

Nationality : Indian

Languages Known : English, Hindi, and Malayalam

Passport Details

Passport Number : P7163920

Place of Issue : Abu Dhabi

Date of Issue : 12-06-2017

Date of Expiry : 11-06-2027

Declaration

I hereby declare that the above-mentioned details are correct and true to the best of my knowledge.

Jinish Ompedathil



Contact this candidate