Khatadah Abdul Badee
Project Planning Engineer
Dammam, K.S.A
adbkva@r.postjobfree.com
Summary
• Over 3 years of experience in pipeline project planning & execution involving EPC & shutdown works in Oil, Gas & Petrochemical industries.
• Expertise in Primavera P6 & MS Project for scheduling, cost & resource loading and progress monitoring.
• Sound background in project planning, executing, controlling and closeout.
• Knowledgeable and attended shutdown projects.
• Extensive knowledge in project management techniques like PERT, CPM, Crashing.
• Basic knowledge in CASESAR II, AUTOCAD, ANSYS, SOLIDWORKS
• Multilingual: Fluent in English, Hindi.
Work Experience
Project Planning Engineer Feb-2016-Till date
Infrastructure Engg. & Contracting Co. Ltd. (www.isecc-sa.com) A Subsidiary of SAUDI ARABIAN AMIANTIT COMPANY (FLOW-TITE) Responsibilities
• Programed Preliminary Baseline schedule & developed it into level 4/5 schedule in P6 & MS Project along with resource loading.
• Analyzed productivity per laminator to evaluate the duration required to complete project & sequentially generated manpower/equipment mobilization histograms.
• Prepared hourly based level 5 schedule in P6 & MS Project for complex shutdown projects.
• Prepared quantity take-off spreadsheet to merge activities in fabrication yard and site erection/hydro-testing/flushing in sequential manner with respect to actual receipt of free issue piping material.
• Prepared summary spreadsheet of installed and completed quantities (Día Inches/Linear Miters & Joints) against requirements of BOQ (Bill of Quantity) or in the format required by client representative for tracking project progress (PMS).
• Prepared CSS (Cost Summary Sheets) to accumulate all the costs associated with piping installation against BOQ of each drawing/isometric for billing value of work done.
• Prepared all documents needed for an insurance claim (Damage occurred due to heavy rainfall) that includes calculation of additional man/equipment hours required & daily productivity losses for reconciliation of the effected work.
• Reviewed contract agreements, drawings and other documents for preparation of technical proposals during and after bidding process which includes but not limited to:
Method Statements for Lamination & Hydrotesting of FRP
(GRP/GRV/GRE) Pipeline, Job-Safety Analysis, Risk-Assessment, Quality Plan, HSE Plan, Preliminary Schedule in P6 and others as specified or required by client.
• Generated several KPI (Key Performance Indicators) helpful for top management to track project success like Planned Vs. Actual manhours spent, Budget Variance, Cost Performance Index, Schedule Performance Index.
• Identified the reason for profit losses and applied ways to compensate for it (Re-arranging the misallocated labor & executing parallel activities).
• Prepared Daily/Weekly/Monthly project progress, manpower/man-hour, and variance analysis report.
• Communicated with client through letters & e-mails on installation issues.
• Documented information related to any delays/stoppages in installation activities, communicated with client and produced it the form of construction claims.
• Applied & familiar with project crashing to shorten duration of projects
(allocating more resources).
Education History
Bachelor of Engineering (B.E) degree in Mechanical Engineering Osmania University (Muffakham Jah College of Eng. & Tech), India Completion Date - May 2015
Higher Secondary (H.S.E-12th) in General Sciences
M.S. Junior College, Hyderabad, India
Completion Date – March 2011
Secondary School Certificate (Matriculation)
St. Marks Boys Town High School, Hyderabad, India
Completion Date - March 2009
Computer Skills
• Primavera P6
• MS Project
• MS Office
• AutoCAD, ANSYS, SOLIDWORKS (Beginner)
• CAESAR II (Beginner)
Trainings & Certifications/Seminars/Workshops
• Certified in ISO 9001: 2015 Awareness & Internal Quality Auditor
• Certified in Stress Analysis Using CAESAR II
• Certified in Project Management using Oracle Primavera P6 R17.7.
• Certified in Microsoft Project 2013.