Post Job Free

Resume

Sign in

Building Automation System, Electrical Installation, Commissioning

Location:
Dubai, Emirate of Dubai, United Arab Emirates
Salary:
5000
Posted:
February 01, 2020

Contact this candidate

Resume:

ANAM UL HAQ

Email: adbjd7@r.postjobfree.com

Cell: +971-**-*******, +92-301-*******

Visa Status: Visit Visa, Expires February 20, 2020

Address: Holiday Inn Express Hotel, Dubai, UAE

Career Summary:

Having 8 Years work experience in the field of BMS, HVAC System, Programming, Installation, Erection & Commissioning

of Industrial Electrical Projects. Experience in development, Automation and Control Interface using PLC, HMI & SCADA. Troubleshooting, Termination of Processing Plants and machines as per manufacturer drawings. Lead the Operation and Maintenance Team. Plan and manage workload across multiple projects documentation and generate reports.

Work Experience:

BMS Installation & Commissioning Engineer (Building Automation System). (August 2015 – Present).

CNS Engineering, Lahore (System Integrator by Schneider Electric)

Project: IBAS & ICT Services (Supply, Installation & Integration for NISHAT EMPORIUM MALL, Lahore).

Responsibilities:

Designed Electric and Control Schematics and Testing 1000+ HVAC System Control Panels using Schneider Electric

Plant Controller DDC MNB-1000, MNB-300, Andover Contiumm B3867 and Automation Server.

Programming and Configuration of Building Automation using Schneider Electric WorkPlace Tech Tool Software.

Graphics creation and System Integration using Schneider Electric StruxureWare Building Operation Software.

System Proposals, Engineered Submittals, Price Quotations and coordination with Consultants and Contractors.

Lead and Perform Installation, Termination and Commissioning of Building Automation for MALL, HOTEL and BANQUET:

(Equipment Manufacturer: Schneider Electric, Honeywell, OMRON, INDECT & Fike Fire Alarm System)

1.HVAC Control System

System includes; 63+ Air Handling Units, 400+ Fan Coil Units and Chillers for 3600 Ton HVAC System.

2.Smoke Management System

System Includes Control of 26+ Smoke Fans, 7 Pressurization Fans, 200+ Smoke and Pressurization Dampers.

3.Hotel Guest Room management system:

4.System Includes the automation of 200 Hotel Rooms using SEGCM Controller.

5.Addressable Fire Alarm System:

System Includes Fire Alarm Panels, SD, HD, ES, BD and Manual Pull Stations.

6.Plumbing Control System

System Includes Integration of Underground Water Tank with Tube Wells for auto operation, Water Flow Meters,

Steam Flow Meters, Diesel Flowmeters, Gas Flowmeters, Boilers Auxiliaries, Calorifiers and Heat Recovery Units.

7.Parking Guidance System:

System Includes Installation of 2500 Parking Sensors.

8.Lighting control system:

System includes the control of lights Auto Scheduling for Basement Area using KNX Controllers.

9.Electrical Monitoring System:

System Includes the integration of 60+ UPS and 20+ CBS with Central Control Room.

10.Emergency Voice Communication System:

Hardwire installation and commissioning of 200+ Emergency Fire Telephones and Disable Persons Telephones.

11.Electric Power Distribution:

Termination, Commissioning of Power, Control DBs, Motor Control Center MCCs and Variable Frequency Drives.

12.Field Devices:

Temperature sensors, Gas Detectors, CO2 sensors, Humidity sensors, Pressure Transmitter, Air Flow Switches,

ACV’S, IVA’S, Damper Actuator, BTU Meters, VAV, UDS, DPS and INDEX Sensors including containment work.

Electrical and Automation Engineer at Chenab Group (Processing Plant) Faisalabad. (February 2013 – August 2015).

Responsibilities include:

Programming, Installation, Maintenance of SIEMENS PLC Step7-400/300/200 using SIMATIC Manager Software.

HMI, Industrial PCs, Operating Panels using WinCC Flexible and Prosave Soft wares.

Diagnose, Troubleshooting Real Time issues related to Ladder Logic Language.

Troubleshooting, Repairing of Allen Bradley SLC, Mitsubishi FX PLCs.

Erection, Commissioning of Processing Plants and Machines.

Parameterizing, Troubleshooting, Repairing of VFDs such as Siemens Micro Master 440, ABB ACS, Lenze 9300, INVT, Danfoss VLT, Control Technique SP, Mitsubishi FR using their Software.

Operation and Maintenance of 15-Ton Coal-Fired Steam Boilers, 6 million kilocalorie Coal-Fired Thermal Boilers.

Troubleshooting of NIJHUIS Waste Water Treatment Plant to Maintain Process flow.

10MW power House Control Room Monitoring, Troubleshooting of panels for Jen Bacher 320 Gas Engines.

Electric Low Voltage Power distribution and calibration of Load Cells for Ball Fiber Plant.

Assistant Electrical Engineer at Kohinoor Textile Mills Limited, Rawalpindi. (January 2012 to January 2013).

Termination of Siemens S7-200, Mitsubishi FX PLCs as per drawings.

Hands of work experience on III- phase synchronous and Induction Motors.

Electrical Power Systems which includes Switch Gear and LT Power distribution.

Responsible for Documentation, Procurement, Maintenance of Electronic and Electrical equipment.

Professional Trainings and Courses:

• Schneider Electric TechTool Training • Schneider Electric Structure Ware Building Operation

Siemens PLC/HMI Training • Siemens SCADA Training • Mitsubishi PLC Training

Electro Pneumatic Control System • Electro Hydraulic Control System

AutoCAD Course • Chinese Language Course (Basic)

Academic Qualifications:

Bachelor of Science in Electronics Engineering (2011). COMSATS University, Abbottabad

(Pakistan Engineering Council No. ELECTRO/14230)

Diploma of Associate Engineer (DAE) in Electrical Govt. Poly Tech. Institute, Sargodha.

Hand’s-on Experience PLC/HMI/BMS Controllers/VFDs:

Industrial PLC/HMI & Controllers:

Siemens PLC S7-400, S7-300, S7-200; Allen Bradley PLC SLC Series, Mitsubishi PLC FX Series,

Siemens HMI and Industrial PCs.

Building Management System Controllers:

Schneider Electric BACnet Plant Controller MNB1000, MNB300, Continuum B3867, SEGCM Controller,

COMO Module for Parking System.

PLC/HMI Software:

Siemens SIMATIC Manager, Siemens WinCC Flexible, Siemens WinCC Explorer, Siemens Micro Win,

Siemens ProSave, WAGO CoDeSys, Mitsubishi GX Developer and Fatek WinProLadder.

BMS Software:

Schneider Electric StruxureWare Building Operation, Schneider Electric Work Place TechTool and IVIS.

Personal Information:

Passport Number: CA1751682. CNIC #: 33303-030-9168-3. D.O.B: May 3rd, 1986. Nationality: Pakistan

Current address: Holiday Inn Express Dubai Hotel, Safa Park, Dubai, UAE.



Contact this candidate