A Anders
Engineering Focal Team Lead
Griffin, GA 30224
adbi8c@r.postjobfree.com
Willing to relocate: Anywhere
Work Experience
Engineering Focal Team Lead
Bevline mechanical projects - South Africa
September 2014 to May 2019
Bevline Mechanical Projects
• Lead 2 supervisors, 4 Foreman, and their staff in their daily execution of duties and responsibilities.
• Prep and plan pre-shutdown activities.
• Execution of scope of work in the shutdown.
• Development of construction strategies.
• Development of risk assessments.
• Interface between MSFPS and Unit Managers.
• Implementation of construction strategy on cross zonal lives.
• Daily production updates and look ahead during shutdown. Supervisor, Piping
Group Five Engineering
November 2013 to July 2014
Supervised team in charge interconnecting piping from pipe racks, towers and pumps for Engen refinery fuel lines
as per Q.C.P. and client specifications.
Site Supervisor
Intershore Island View
September 2012 to September 2013
Designed and Planned scope of work for projects including estimation for labor cost, and skills analysis of required
labor. (Shutdowns / Turnarounds)
• Compiled work-packs for all disciplines and contractors.
• Team Built, repaired, and fabricated storage tanks.
• Installed suction and discharge pipelines.
• Oversee subcontractors ensuring the work is done to Q.C.P. and client specifications and standards. Superintendent
Fluor
August 2012 to September 2012
• One (1) Month Shut Down Project for Major Refinery
• Oversee subcontractors ensuring work packs are complete for the shutdown.
• Inspect all fit ups, pipe orientation, and dimensions of pipes.
• Sign off on all Quality Control Specifications
• Witness all pressure tests.
Piping Superintendent
Kentz GHER
August 2011 to May 2012
• Piping Superintendent in support of two separate major refineries.
• Designed and Planned scope of work for projects.
• Supported and managed supervisors in materials acquisition and requisitions.
• Ensured correct certifications were in place and ensured pipe spools were fabricated from approved construction
isometrics.
• Control deliveries of all pipe spools to site laydown.
• Q.C. all pipe spool installations.
Piping Supervisor
CHEVRON
March 2010 to June 2011
• Piping Supervisor in support of Oil Rig
• In charge of workshop fabrication, material identification, fabrication of pipe spools, confirm correction orientation
from A.F.C. Isometrics and work packs, ensured fabrication done to client specification.
• Managed 2 foreman, and their staff in their daily duties and responsibilities. Mechanical Piping Superintendent
McConnel Dowell
November 2008 to March 2010
• Piping Superintendent in support of major refinery projects.
• Ensured all work carried out by M.E.C. were to client specifications, inspection of manufacturers certs,
calibration certs, material certs and all checklists for equipment are carried out onsite and client Q.C.P's are
supported.
• Final quality check and sign off, confirmed sign-off for deviations and red line drawings, and isometric sign-off on all Q.C.P.'s.
• In charge of fabrication and installation of pipe spools of heat exchanges, pumps, vessels, knock out drums,
columns, boilers and pipe racks.
• Managed 2 foreman and their staff, and 4 assistants. Site Superintendent
June 2007 to May 2008
Contract)
Seshin Mines (Iron Ore Mine)
• Completed skills analysis to estimate all disciplines for scope of work.
• Worked close to client planning department to ensure all work is executed as per plan.
• Oversee piping, mechanical and structural steel work teams. Pipe Fitter, Piping Supervisor, Piping Foreman, Piping Superintendent Genrec Engineering & Contractors
1981 to 2007
and Workshop
Manager for multiple clients globally including by not limited to:
• SAIPEM
• Exon Mobile
• Flour SA, Genrec Engineering & Contractors, Murray & Roberts, Babcock Engineering, Stein Muller
• Mos Gas Oil Rig
• Power Plants, Ship Yards, Mines, Oil Rigs, Refineries