Salman Khan
Objective:
Aim is to work in a challenging multi-tasking and innovative atmosphere of a bio-medical organization meeting global Standards, where I could use my professional bio-medical and analytical engineering skills and experience to the maximum potential.
Personal Data
Date of Birth: 15th May, 1993
Marital Status: Single
Nationality: Pakistani
Address: House No. BI-1082, Street 5 Chirah Road, Muslim Town, Rawalpindi Languages: English, Urdu
Email: adbhjh@r.postjobfree.com, adbhjh@r.postjobfree.com Phone Number: 0092 345-***-****
Educational Qualifications:
Oct 2019 B-Tech Electronics (Hons - 4 yrs) Preston University, Islamabad 2009 - 2012 DAE Electronics (Diploma) Swedish Institute, Rawalpindi 2007-2009 SSC Matriculation Muslim Int’l Model School, Mardan Technical Skills:
Multi-modality engineer with surpassing skills to work on variety of medical equipment’s including, MRI, CT-Scan, X- Rays, Ultrasound, IXR/DXR and Patient monitors.
Site planning, Installation, Corrective, Maintenance Planned Maintenance, FCO/Upgrade by following safety guidelines.
Working knowledge of Computer Networks (Ethernet, TCP/IP & Firewall) in Hospital environment
Working knowledge of different type of Operating systems (Windows 95/98/NT/XP/2000 /7/UNIX/Linux).
Working knowledge of different software including Auto CAD, MS Office, MS Visio, and Matlab7. Work Experience:
MEGAPLUS (Philips Healthcare) From JULY 2019 till date Designation: Senior Service Engineer
Job Description:
Responsible for Philips’s IXR/DXR as primary modality
CT Scanner as secondary modality C-arm, Ultrasound, MRI as supporting modality
Providing support to other FSEs onsite and remotely
Responsibilities include
Pre Installation work
Which involves site survey, creating initial layout of the site, correspondence with Philips to comply the final layout as per site requirement, sharing timelines for availability of resources (which includes riggers, installation tools, etc.) onsite, and keep strong communication with customer to ensure site readiness. Installation
Installations to be carried out as per instructions given in installation manuals using proper installation tools in timely manner or as per timeline, commission and testing of the equipment performance using proper safety and calibration tools. And handing over the equipment for clinical use. Preventive Maintenance
Submitting Preventive Maintenance schedule annually for the equipment which are in contract or warranty, periodically performs preventive maintenance as per submitted schedule. Keep follow up with Bio medical department
/ End User for the availability of equipment / system on given schedule. Interview with the end user/bio medical department if any problem occurring in functioning of the equipment. Performed PM as per checklist. Commissioning
Service Repair on designated equipment
Corrective maintenance is a part of job which involves attending service calls and respond timely. Troubleshooting of the problem, faulty part diagnostics using tools (ESD kit, safety tools if require, etc.) and procedures given in corrective maintenance. And escalate the problem to TIER 2 support in case of parts approval for ordering. And finally parts ordering and follow up the parts availability on site and replacement accordingly with signing up the service report to maintain the service record.
Field Change Oder
Performed FCO’s
keeping up-to-date on administrative responsibilities such as Maintaining Customer Service Log Internal service records in a timely manner, Maintaining communication with customer to ensure resolution and proper Follow-up, leading to customer satisfaction to ensure maximum uptime.
DWP (Pvt.) ltd (Philips Healthcare) From April 2016 till JUNE 2019 Designation: Service Engineer
Job Description:
Responsible for Philips’s Cardiovascular as primary modality and CT Scanner as secondary modality
Responsibilities include
Installations, Preventive Maintenance, Commissioning, Service Repair on designated equipment, Field Modifications Keeping up-to-date on administrative responsibilities Done Installations and PM for Various Types of modalities that includes: IXR : (Azurion 3 F15 Rel 1.2) (Azurion 7 F20 Rel 1.2) (Azurion 7 C20 Rel 1.2) (Allura Centron) (Allura FD /10F) (FD 20F with Swivel) (FD 20C with Table Tilt option) Rel 8.2 Quant Packages : Coronary Quant.sw Pkg, Vascular Quant.sw Pkg Workstations : (Intellispace PACS) (Interventional Tools with Options Stent Boost,Heart Navigator, Allura 3DRA, Vessel Navigator, EP Navigator) Coronary Tools, Echo Navigator + CX 50 Integration with Azurion 7 Hemodynamic System : ( Xper Flex Cardio with HP and XDS workstation Rel 1.5.14) MRI : (Achieva Nova Dual 1.5 T)
CT Brilliance 6 / 16 / 64 Air
X-RAY : ( Bucky diagnost ) ( Dura Diagnost F30 )
C-Arm : ( BV Endura Rel 2.3 ) (BV Pulsera Rel 2.3 ) ( BV Vectra Rel 1.1 ) US : (Affiniti 70g, CX 30, CX 50, Clearvue 550, HD5, and EPIQ 7C with Q-Lab Quant.sw pkg ) CREATIVE MASTERS INC. From JUNE 2009 till March 2016 Designation: Service Engineer
Job Description:
• Installation and commissioning of GE CT Scanner systems include GE Light Speed Ultra 8/16, GE High Speed LXi/DXi/FXi, Light speed Qxi 4 slice, GE Pro-speed, GE HSA RP1, RP2, CTI, Sytec 1800I, Sytec Sri, Prospeed,CT/e, &, Bright Speed Elite, GE Profile III MRI, CR Systems, Philips Bucky diagnost.
• Supervision of Site planning for the Installation imaging systems.
• Done Routine Tests, Functional Checks, Adjustments, and Alignments Conforming to Calibration Specifications.
• Software Load from Cold procedures, and Network Configurations.
• DICOM and PACS systems integration with CT, CR, MRI, US.
• Submission of paperwork in a timely manner on services performed.
• Maintaining all engineering documents updates for field repairs.
• Reporting the Log in site log to keep the sites running and got fewer breakdowns.
• Excellent ability to handle multi tasks and stressful situation.
• All other duties as assigned by the Management.
Projects:
Some of the recent Project highlights as follow:
Philips Azurion 7 C20 Angiography Installation and Commissioning - Evercare Hospital Lahore Apr 2019 – May 2019
Installation comprises
Hemodynamic System (Philips Flex Cardio)
Interventional Tools
Philips DuraDiagnost F30 DR Installation and Commissioning - Evercare Hospital Lahore Apr 2019 – May 2019
Philips BV Pulera and Vectra C-arm Installation and Commissioning - Evercare Hospital Lahore Apr 2019
Philips Azurion 7 F20 (Flexvision) Angiography Installation and Commissioning - Tabba Heart Institute Karachi
Apr 2018 – Apr 2018
Installation comprises
Hemodynamic System (Philips Flex Cardio)
Coronary Tools - Dynamic Roadmap pro, Stent boost live Interventional Tools
Echo Navigator
US CX 50
Philips Volcano
IVUS : 3.5.0.0.2957
IFR/FFR : 2.5.0.73
Philips Allura FD 20/C Rel 8.2 Angiography (Site Planning, Installation, Commissioning ) - Armed Forces Institute of Cardiology Rawalpindi
Mar 2017 – Mar 2017
Installation comprises Hemodynamic System (Philips Flex Cardio), Interventional Workspot (Stent Boost, Heart Navigator, Vessel Navigator, EP Navigator, and 3D RA)
Allura FD 20/C Rel 8.2 Angiography Installation and Commissioning - Children Hospital Lahore Jan 2018 – Jan 2018
Installation comprises Hemodynamic System (Philips Flex Cardio), Interventional Workspot (Stent Boost, Heart Navigator, Vessel Navigator, EP Navigator, and 3D RA) Intellispace (ISCV)
Allura FD 20/F Rel 8.2 Angiography (Site Planning, Installation, Commissioning ) - Armed Forces Institute of Cardiology Rawalpindi
Feb 2018 – Feb 2018
Installation comprises Hemodynamic System (Philips Flex Cardio), Interventional Workspot (Stent Boost, Heart Navigator, Vessel Navigator, EP Navigator, and 3D RA)
Philips Allura FD 20/C (FlexVision) Rel 8.2 Angiography Installation and Commissioning - PNS Shifa Hospital Karachi
Dec 2017 – Dec 2017
Hemodynamic System (Philips Flex Cardio), Interventional Workspot (Stent Boost) Intellispace (ISCV)
Philips Azurion 3 F15 Rel 1.1 Angiography Installation and Commissioning - Tabba Heart Institute Karachi Dec 2017 – Dec 2017
Installation comprises Hemodynamic System (Philips Flex Cardio)
Allura FD 20/C Rel 8.2 Angiography (Site Planning, Installation, Commissioning ) - PAF Hospital E9 Islamabad Nov 2017 – Nov 2017
Installation comprises Hemodynamic System (Philips Flex Cardio) and Intellispace (ISCV)
Philips Allura FD 10/F Rel 8.2 Angiography (Site Planning, Installation, Commissioning ) - Armed Forces Institute of Cardiology Rawalpindi
Nov 2017 – Nov 2017
Installation comprises Hemodynamic System (Philips Flex Cardio), Interventional Workspot Rel 1.4 (Stent Boost), Dynamic Coronary Roadmap Rel 2.0
Philips BV Endura Rel 2.3 Installation - Military Hospital Rawalpindi and Combined Military Hospital Rawalpindi
Oct 2018
Philips BV Endura Rel 2.3 Installation - Combined Military Hospital Kohat and Abbottabad Nov 2018
PROFESSIONAL TRAININGS :
CT 1020 CT Basics Virtual Classroom conducted by Philips Virtual Classroom (SLC).
DXR2EL001 X-ray Systems, Basic part 1
IGT2FE001_Field Exposure Cardio Vascular Systems
IGT2EL003 BV Family part 1
IGT2FE002Field Exposure Mobile Surgery Systems
Certifications :
The Courses Conducted by Philips as follow:
Basic Networking, Advanced Networking, Dicom Certification, Business Essentials, Safety Certification, Laser Safety Awareness, Imaging System Safety, Service Tools Certification, System Performance ESD and EMC, Clinical Terminology Certification
References :
Available upon request