Post Job Free

Resume

Sign in

Team leader civil

Location:
Abu Dhabi, Abu Dhabi Emirate, United Arab Emirates
Posted:
January 29, 2020

Contact this candidate

Resume:

Mostafa Gaber Ahmed Diab

Address : Alexandria / EGYPT

Date Of Birth : 05/01/1973

Nationality : Egyptian

Country of residence : UAE –Abu Dhabi

Current Mob : 009**-********* ( UAE )

Telephone : 002 - 010******** EGYPT )

Home : 002- 03 4255279

Martial State : Married

E- mail

: adbh0a@r.postjobfree.com (Permanent )

Positions :

Senior Civil Engineer ( Acting Civil Section Head )

Civil Superintendent

S. structure/ building Engineer

U/G Piping Engineer

LNG Tank Engineer

QA/QC Civil Engineer

Profile :

B.Sc. in Civil Engineering Alex University 1995 with final grade (V. Good )

A Civil Engineer with previous experience in Maintenance, tendering scopes, Budgeting, Execution, Quality Control, Supervising, Revamping for a major big project (E P C ) Contract such as

Refinery, Oil& Gas, Cement factory, Electrical projects, U/G Piping, LNG ( gas) Plant, Deconstruction buildings, (E&I ) Buildings & revamping works & Concrete repairing, Tendering

Previous company :

Previous Experience

From April 2007 till now

Working as a Senior Civil Engineer in Ruwais gas plant with

“ GASCO “ ADNOC group )

To plan, coordinate and supervise the civil resources to ensure that work orders are executed in accordance with GASCO standards and HSE requirements, within the budget & time frame.

To enforce the implementation of Gasco Health, Safety and Environment Management System (HSE-MS) and also promote awareness of its use among all division and department personnel.

To conduct periodic surveys of critical structures and installations to identify abnormal condition, settlement, and material deterioration and recommend remedial action.

To review & amend Civil Engineering specifications and Civil Packages including tender documents and bid evaluations for plant modifications.

To Prepare multi scopes for short & Long term agreements .

To coordinate and handle the Major / Minor Shut downs all over the plant .

To coordinate the implementation of work orders with other Departments and Sections within the plant, for reasons of safety and quality assurance.

To ensure implementation of Competency Based Training & Development programs, through use of Personal Development Plans (PDP’s) and UAE Nationalization directives.

To review and approve Contractors’ payment invoices to ensure compliance with work executed, variation orders and claims.

To participate in negotiating of Civil Contractors proposals, To compile/provide input for preparation of division/department Capital and Operating budgets and monitor annual expenditure budgets.

To prepare the civil section yearly proposed budget

To prepare the Civil section 5 years businnes plan

To Prepare the Civil section strategic objectives & Budget control

To enhance and improve the Civil section ISO in line with civil activities

MAIN CHALLENGES

To contribute towards achieving efficient, timely and quality completion of all Habshan and Bab Plants related Civil Maintenance works, taking into account the current impact on running facilities and personnel.

To maintain networking communications between Civil Section Head colleagues, Operations, HSE Department, Administration and outsource Contractors personnel, when due consideration is given to the diverse schedules, commitments and locations of all concerned personnel.

Back up working as Acting Civil section Head during intervales leaves

From October 2005 till February 2007

Project : Khursaniya Gas Plant Project

Company : Technip / Bechtel ( J.V )

Position : Civil Engineer (U/G RTR piping )

Client : ARAMCO - SAUDI ARABIA

Responsibility

Performing activities shown in the construction quality control plan and all U/G infrastructure works like :

RTR pipes, Sulpher Basins,duct banks, manholes, basins etc

Following all the construction activity for the U/G piping from the deliveries to the fabrication shop then the installation .

Supervising the under ground piping activities ( Gravity & Pressure Line ) all types of piping likes: Carbon steel,GRP, Plastic, HDPE,Concrete pipes

Prepare the weekly summary report for the all U/G activities including the material deliveries focusing with the schedule of the construction works .

Reviewing the Subcontractors ( C3 ) to be confirmed with site construction

Attending the construction meetings and provide the work front for the contractors

From October 2003 Till June 2005

Project : Unleaded Gasoline / Low Sulpher Gas Oil )

Company : TECHNIP ITALY S.P.A

Position :Civil Engineer

Consultant : PARSONS

Total coast : 550,000,000 $

Client : Abu Dhabi Oil Refinery ( ADNOC / TAKREER )

Location : United Arab Of Emirates ( RUWAIS REFINERY )

Responsibility

Performing activities shown in the construction quality control plan and all basics concrete works for the Execution pf the Ulg/Lsgo project ) likes :

Pipe rack, Foundation, Columns, Sulpher Basins,Paving etc

Supervision for the under ground concrete activities ( Duct bank, Cable Trench, Manholes, Sulpher Basins )

Supervising the under ground piping activities ( Gravity & Pressure Line ) all types of piping likes: Carbon steel,GRP, Plastic, HDPE,Concrete pipes

Making all final punch lists for units before commissioning.

From February 2002 Till October 2003

Project : DAMIETTA LNG Project

Company : Kellogg Brown &Rout / Tecnicas Reunidas / JGC ( J.V )

Total coast : 1500,000,000 $

Client : Eni Group&Union Fenosa

Location : Damietta LNG Plant

Position : QA/QC Engineer for LNG civil works

Responsibility

Supervising the construction works of Liquefied Natural Gas LNG Plant

From February 2002 to February 2003

QA/QC for Civil Works for the Post tension LNG Tanks it was consist of:-

316 piles ( 1.2 diameter, 49 depth, 800 mm diameter) each tank

post tensioning raft foundation ( 40 m diameter, 1.2 depth, 55000 m3 )

Concrete walls ( 42 m height,800mm width,160 vertical post tensioning pipes, 10,000 m3 )

Doom roof ( 80 m diameter, 800mm thickness, Air pressurizing lifting )

Following the insulation activity inside tank ( foam glass, pluvex )

Supervising the post tensioning activities for the horizontal & vertical ducts ..

Prepare the construction remarks on the work procedure and the method of statement before approval to be comply with the project standards

From February 2003 till October 2003

QA/QC for the steel structure activity & the Paving and the Underground Pipes for the LNG Train the process plant for the LNG and my duty is :

the steel structure activity for the erection for 7500 tons

Giving the full hand power to the contractor to achieve the schedule target

the industrial communication building inside the plant such as:-

( Substation,Control room, FIR ) for the Execution and Finishing .

From January 2001 till January 2002

Project : Blue Circle Cement Egypt ( line 5 )

Company : Blue Circle Industries - PLC ( English Company )

Position : civil Engineer (Building & U/G works& Steel structure )

Total coast : 100 000 000 $

Responsibility

Supervising activities shown in the construction quality control plan and all basics like : -

Supervising the Execution for the main C.F silo for the cement by slipping form for ( 70 m height, 40 m diameter,750mm wall width ) Prestressed tanks

Concrete Works ( buildings, structures, slipping form, conveyors, silo, substation )

Steel structures buildings ( conveyors, structures, bridges, c f silo, flash dryer Road Slabs .

Performing the prestressed for the silo ( 70 m height, 40 m width, big slab 1.6 m depth ) .

From March 1999 to October 2000

Project : Midle East Oil Refinery ( MIDOR REFINERY )

Company : Technip / Technipetrol ( Italian & French Company )

Position : QA/QC Civil Engineer ( Civil & Steel Structural & Buildings)

Consultant : Foster Weller

Total coast : 1-800-***-*** $

Responsibility

Performing activities shown in the construction quality control plan and all basics concrete works for the Execution pf the two units ( Sulpher Unit & Hydrogen Unit ) likes :

Pipe rack, Foundation, Columns, Sulpher Basins,Paving etc

Supervising the under ground concrete activities ( Duct bank, Cable Trench, Manholes, Sulpher Basins )

Supervising the under ground piping activities ( Gravity & Pressure Line ) all types of piping likes: Carbon steel,GRP, Plastic, HDPE,Concrete pipes

Have responsibility of monitoring assembly of steel structure parts and inspected finally all units before Mechanical installation .

Participating for modification of steel structure making that done as requirement .

Making all final punch lists for units before commissioning .

Witnessing qualification test and determining their validity as construction specifications .

From January 1997 to March 1999

Project : Biblotheca Alexandrina ( Phase II )

Company : Arab Contractors / Balfour Beatty J.V

Position : Quality Control Engineer ( Civil & Finishing )

Consultant : Snohetta & Hamza Consortium

Total coast : 120 000 000 $

Responsibility

Quality Inspection ( Reinforcement, Shuttering, Surveying, Block Work & Plaster ) .

Verification of the acceptability of construction upon the pertinent quality control .

Close out of quality deficiency notes and nonconformance reports .

Attendance at quality system / technical audits as determined by the QA / QC Mgr .

Preparation of quality control plans for construction and inspection .

Review of construction method of statements .

Follow up of all concrete batches produced and inspection of its compliance with standard requirements .

From November 1996 to July 1997

Project : Bibliotheca Alexandrina ( Phase I )

Company : Rodio – Trevi – Arab Contractors J.V (Italian Company )

Position : QC Engineer For foundation & underground engineering

Consultant : Snohetta & Hamza Consortium

Total coast : 70 000 000 $

Responsibility

Supervising the maintenance system to ensure the immediate repair of the dewatering system operation .

Supervising the piling activity & diaphram wall

Monitoring of ground water table ( vibrate wire piezometers ) .

Preparation of quality control plans and inspection checklists .

In-process and final inspection of construction works ( concrete structure, insulation works, installation of pre-cast units etc ) .

From August 1995 to November 1996

Working as a consultant Engineer at consultant Engineering Office

Design works and consulting site works and Repair concrete Works .

COARSES

API 936 REFRACTORY CERTIFIED

PMP Profisional project management

ISO certified

Six segma green belt

Contractcts reading / writing and mitigation

Management with emothional

Time mangment

Problem solving & descision making

Budgeting & cost analysis

Safety supervisory responsibility from TECHNIP at UAE

Safety Permit to work from TECHNIP at UAE

Safety Confined space coarse from TECHNIP at UAE

Safety accident shape from Kellog Brown&Rout ( LNG Gas plant )

Safety work shop From BECHTEL AT Saudi Arabia

Special Construction

Prestressed cilos, Tanks

Postensioning Tanks ( LNG Tanks )

Piles, Diaphram walls

Slipform silo

Concrete Dome ( Air lift )

Basins & Culverts

Painting& Insullation &refractory

Repair and Remedial works for concrete.