Post Job Free

Resume

Sign in

My professional is Electrical Engineer

Location:
Kovilpatti, Tamil Nadu, India
Salary:
Negotiable
Posted:
January 20, 2020

Contact this candidate

Resume:

P.Venkatachalapathy

adbc2t@r.postjobfree.com

adbc2t@r.postjobfree.com

adbc2t@r.postjobfree.com Mobile No. +91-979*******

ELECTRICAL ENGINEER

OBJECTIVE:

To discharge the entrusted function effectively and efficiently to get a position from where I can contribute creatively towards the development of the organization and to constantly improve and update myself to become a valuable asset for the organization through intelligent application of knowledge and continuous learning.

Professional Education:

Electrical and Electronics Engineering (2002 – 2005)

Experience

Total experience 10 years in Electrical Engineer power plant project experience.

Job Profiles:

1.PMK Engineering Energy System Power Plant Project (Chennai)

Position: Electrical Engineer

Period: Feb 2019 to Till Date

·Involving the work of 500 MW thermal power plant project and installation of plant LV< HV & EHV electrical equipment inside, outside the plant and switch yard erection.

·Installation of 400 KV/200KV switchyard and its accessories control, structural and equipment erection, switchyard overall earthing arrangements Double moose conductor stringing, arrangements of jumbering, installations of isolator, sf6 breakers.

·Breaker, lighting arrester wave drop capacitor voltage transformer current transformer and swtichyard control wiring and control panel installation of cable tray in switchyard and laying of LT control cable and switchyard earthing.

·Inside thermal plant overall cable tray arrangements and HT, LT, low current cable laying and overall plant lighting system arrangement

·Installation of G.T. transformer 400/21 KV, 200 MVA 1 Nos, unit transformer 21/6.6kv 35 MVA 2 no's and its bus duct arrangements and earthing arrangements.

·Installation and termination of 6.6KV, 11KV motor for various function in power plant like chp, ahp, cw pump bl pump, bunger mill and its control panel installation.

·Installation of 6.6KV/415V, 11/415V station service transformer for various uses of inside and outside the plant

·Involved in Erection and commissioning of power plant (CFBC) activities

·Traveling to the entire Projects site for Erection and commissioning

·Steam Drum, Column erection header superheated attempertor, Ibd tank, cyclone economizer, coal feeder, Bunker, ESP – Electrostatic Precipitator Erection using the draw given by the design team

·To coordinate the mechanical engineering and drafting activities to ensure efficient and economical design solution whilst maintaining the delivery schedule.

·To monitor construction testing and commissioning work executed by construction contractors

·To prepare requisitions for technical evaluations and discipline material and equipment

·Fabrication of boiler parts Example Expansion bellow, ducting, fans, earthing and lighting etc

·Project proposal of boilers parts

·To carry out quality inspection and witnessing the testing of equipments like..

·PA, SA, ID fans & Valve list required for site erection

·HP and LP Dosing systems

·Fluid coupling for boiler Feer water pumps etc.

·Boiler Parameters

·Boiler Capacity 260 TPH

·Steam Pressure 101 Kg/cm2

·Steam Temperature 540 C

·Feed Water I/L Temperature 230 C

·Installation of 13.8Kv/380V 2500KVA transformers 12 No’s and its BUS ducts arrangements. Inspection testing, commissioning and handover as per international standards

·Installation of Temporary substation with 16 No’s 625 K.V.A. D.G. sets and 4 No’s 2500 K.V.A Transformer all are one group connected system, and installation of its BUS BAR, U.G. cable Termination, Installation of its switch gear, protective relays arrangements.

·Installation of earthing system, structural earthing Equipment earthing Transformer, D.G. earthing and lighting protection earthing as per international standards.

2.Dolphin Engineering Company Power Plant Project (Abu Dhabi)

Position: Electrical Engineer

Period: Oct 2018 to Jan 2019

·HI-POT for HV 300,400,630 Sq.mm XLPE cables, 20/400KV 300MVA GSU 20/6.6 KV 15 MVA transformer IPB bus and meggering of LV cables in the power plant.

·Switch Gear & Transformer testing up to voltage level of 400 KV, 500 MW power plant, Testing and commissioning of Transformer, H.T & L.T motors, site Testing of HT & LT Panels, Cables, Logical and Other Panels.

·Installation of GSU 20/400 KV, 400MVA transformers 2 nos, 20/220 KV, 400 MVA 1 nos, and its local and remote control panel.

·Installation of UAT 30 MVA 20/6.6, 6.6 KV unit and station transformers 3 nos and its local and remote control panels.

·Installation 6.6 KV station switches, 400 units switch gears and its breakers VCB, MCCB and relay settings, its control wiring checking and modification and also interlock checking with required system.

·Installation of 400 MVA transformers RTCC panel and its internal wiring checking and modifications.

·Supervision, Commissioning and handling over as per clients requirements, Erection, testing and Commissioning of all electrical equipments like 11 KV, 22KV, 400KV, 220KV, switchyard, transformers, Sf6, VCB, ACB’s, MCCB’s Relay panels.

·Supervising subcontractors for Mechanical & electrical jobs and assuring compliance with project schedules & specifications, preparation, of man power and machineries mobilization schedule for projects.

·Supervising of project subcontractors and coordinating with clients / consultants for approvals of engineering submittals – drawing & documents and materials.

·Technical correspondence with clients, consultants, subcontractors and vendors and documentation for future reference.

·Supervise and ensure compliance by subcontractors with all project schedules and specifications

·Estimate requirements for material and coordinate with procurement to ensure in time availability at the sites.

·Supervise and assist with testing of medium voltage switch, preparation of project execution plan, supervision of site project work.

·Involve the work in installation and testing commissioning of 3*250 MW duel mode SIEMENS gas turbine power plant and its transformers 300 MVA, 15 MVA transformers (HYUNDAI), Switch gear, protection panels and auxiliary transformers in the power plant

·Installation and testing commissioning of transformers project panels, PCC panels, GCB panels, MCC panels, cable protection panel, different protection panel and relay panels, control wiring checking with drawings and modifications if it is necessary.

·Installation and testing commissioning of 400 KV, 220 KV substation interlocking system with GCB panel, transformers protection panel for GSU, UAT fire fighting panel and control wiring checking for above systems.

3.Noor Alkhaleej Company Nuclear Power Plant Project (Iraq)

Position: Electrical Engineer

Period: May 2018 to July 2018

·Monitoring & inspection of execution & witnessing commissioning tests of electrical systems & follow up with contractor for standardization & quality job.

·Design review of GIS, MV, LV, Protection Systems & other plant utilities

·Commissioning of 3 x 170MVA Power Transformer (TBEA) with OLTC (MR) & 3 X 30 MVA Unit Aux Transformers

·Commissioning of 6.6 Kv, 0.4 Kv Switchgears, Dry Type Transformers, MV & LV Motors including VFD’s

·Installation and commissioning of 125V DC Redundant Battery backup system for 11KV, 6.6KV & 400V switchgear controls

·Testing and commissioning of 11KV, 3 & 4 way Schneider Electric RM6 Ring Main units with SF6 breaker and disconnector equipped with VIP300 self powered Protection Relay

·Installation, Meggering& RTD Test of MV Motors up to 6150KW

· LV & MV cable selection/sizing/testing including MV termination Kits

· Soil resistivity test and execution of Earthing at site

· Control Valves Testing (Fisher, Metso, Jamesbury)& calibration

·Installation, testing & commissioning of Temperature, Flow, Level & Pressure measuring instruments and inter-connection with DCS Honeywell Experion PKS

·Worked on Cable schedules, JB schedules, Isometrics, P&ID, motor interconnection diagrams, Functional Logic Diagrams etc

·Monitoring of functional and operational tests of various equipments in order to prepare the equipment to the first start up

·Inspection, Supervision & Witness of Site Tests & Commissioning

·Preparation of inspection reports, certificates, progress reports and site correspondence

·Stability Test of Transformer, Generator & Cables

·Complete Component & Functional Testing of 4.16kV & 480V Switchgear

·Testing of MiCOM P122,P192, P127, P921, P663; GE G60,T60,C60; ABB REM615 Protection Relays

·Proficient with BECKWITH ELECTRIC CO. M-4272 Motor Bus Transfer System for MV Switchgear

·Site Test of Motors & Generators

·Modification & engineering of Plant Systems for betterment

·Review/Approval of Test Procedures

·Ensure compliance with Project Technical Specifications, International Standards, and OEM procedures and specifications

·Perform equipment walk-down, safety walk-down & ensure safe turnover of equipment from Contractor to Client.

4.Sogelec Iskan Engineering Thermal Power Plant Project (Qatar)

Position: Electrical Engineer

Period: Mar 2015 to June 2016

·As a electrical engineer (Owner’s Engineer) for 2 X 520 MW (1040 MW) Thermal Power Corporation involved in review engineering of Boiler Turbine Generator (BTG) area and water systems.

·Involved in preparation of specifications, data sheets, scope of work from design stage

·Involved in approval of various electrical and thermal sizing calculations for boiler and boiler auxiliaries like fans, mills, air – preheater, Electrostatic Precipitator (ESP) turbine and turbine auxiliaries like Boiler Feed Pump (BSP) and Condensate Extraction Pump (CEP), condenser, HP heaters, LP Heaters, vacuum pumps etc.

·Review and approval of engineering drawings and documents like GA Drawings, P & IDs Heat and Mass Balance Diagrams, Water balance Diagrams, deign basis reports, PG test procedures according to project contractual scope of work and specifications requirements

·Ensured all work is carried out in accordance with applicable codes like ASME codes and standards, HEA standards within the boundaries of the asset basis of design and according to tender specifications requirements.

·Study of alternative cooling system (Air cooled condenser) for 600 MW Supercritical Thermal Power Projects. Preparation of Heat and Mass Balance Diagrams (HMBDs) for the same project and prepared the technical study reports.

·Our assignment includes pre-financial closure technical due diligence studies, construction monitoring, performance test (PG Test) witnessing and certifying performance test values, review of punch list and annual operational review.

·Successfully submitted the technical due Diligence Report, Construction Monitoring Reports, PG test results review, punch List verification and Annual Operational review to the satisfaction

·As an In – house Electrical Engineer for 6 x 660 MW Sasan Ultra mega TPP. Involved in review engineering of Boiler Turbine Generator (BTG) area.

·Engineering of Boiler and auxiliaries for 6 x 660 MW sasan ultra mega supercritical thermal power project involved in preparation of specifications, data sheets scope of work from design stage

·Review and approval of engineering drawings and documents like GA Drawings, P & IDs. Heat and Mass balance Diagrams submitted by Shanghai Electrical Company (SEC), design basis reports according to project contractual scope of work and specifications requirements.

·Involved in approval of various mechanical and thermal sizing calculations for boiler and boiler auxiliaries like fans, mills, air- preheater and Electrostatic Precipitator (ESP) etc.

5.Hyundai Engineering Company Power Plant Project (Abu Dhabi)

Position: Electrical Engineer

Period: June 2013 to June 2014

·540MW POWER PROJECT :

·Execution to plant layout & commionssing activities.

·Undertaking Design Study, review & Erection activities of the plant.

·Review and analysis of site data.

·Exposure to Construction Planning work.

·Identification of bench marks.

·Study and analyze as to the availability of various inputs.

·Evaluation of the sequences of construction activities.

·Interpretation of drawings and providing clarification of engineering design.

·PROJECT MONITORING :

·Project information system for highlighting slippage and hold ups for management actions.

·Overall project schedule/ network/ charts identifying the critical path, priority activities and target dates of completion.

·Update and monitor the schedule against the progress of work.

·Prepare weekly progress reports.

·Monitor the overall project.

·OPERATIONS (135 MW X 4)

·Exposure to power plant operations through DCS technology including efficient handling of emergencies in boiler & TG areas.

·Balance of Plant Operation

·Coal Handling Plant (PLC & Local)

·Fuel Oil Station

·Fire Fighting System

·All project management and project engineering activities for 4x171 MW detail engineering project.

·Involved in project engineering and project management activities from pre-bid engineering stage through basic and detail engineering.

·Involved in preparation tender technical specification for Boiler and ESP, Turbine and Air Cooled Condenser for 2 x 300 MW Project. Attended pre-bid clarification and post bid clarification meeting with various boiler and turbine vendors such as BHEL, Siemens, Thermax, Ansaldo etc. Involved in preparation of bid evaluation report for BTG package.

·Managed the project as per schedule and planning, monitored the project progress, weekly review and monitoring of man-hours and budget for various disciplines such as mechanical, electrical and C&I involved in detail engineering activities.

·Prepared Monthly progress report, minutes of meetings, successfully organized kick-off meeting, and technical meeting with various vendors for Botswana Project.

·Knowledge of Energy Audits of Boiler, Turbine, Compressor, Pumps, Fans, Lighting, Water system, Air system, as per Central Electricity Authority guidelines and BEE (Bureau of energy efficiency, Government of India)

·Involved in the internal energy audit conducted at 2x250 MW Dahanu Thermal Power Plant

·I was Project Engineer responsible for handling key mechanical packages for Sea Water Based FGD at Dahanu TPP right from concept till commissioning of FGD. FGD has Efficiency of 99% sulphur removal

6.Muhibbah Engineering Construction Company (Qatar)

Position: Electrical Supervisor

Period: Jan 2010 to April 2012

·Ensured all work is carried out in accordance with applicable codes like ASME codes and standards, HEA standards within the boundaries of the asset basis of design and according to tender specification requirements.

·Project Management, co-ordination with other engineering disciplines like civil, electrical, & C&I departments for engineering activities. Assisted construction and commissioning team at site for timely execution of FGD Project.

·Arranged the Kick-off meetings and vendor meetings and preparation of minutes of meetings

·Exposure to Reliance infrastructure Generation Transmission and Distribution business including Operation & Maintenance

·Involved in Testing and Commissioning of SCADA (Supervisory Control and Data Acquisition) system

·Attended DRUM (Distribution reforms and Upgrades Management) Training during same period

·Marketing in Industrial filters, lubricants (ELF Lubricants), and other industrial products

·Engineering, Material Inspection and Handling, Legal and IBR Documentation, IBR Inspection of Pressure Parts, Erection and Commissioning for HRSG. (7000 MT, 2 x 315 TPH)

·Routine of all pipe lines as per plant layout, Preparing BOQ, Technical Specifications for procurement as per Standards, clearing Technical Deviations in offers and giving Technical Recommendations.

·Finalizing Technical Specifications of various BOP equipments for procurement as per requirement, clearing Technical Deviations in offers from Vendors and giving final Technical Recommendations, Material Inspection and Handling, Erection and Commissioning.

·Hot tap off for the provision of oil firing for newly coming 2 X 750 TPH Boiler.

·Interconnection of newly coming main steam lines with existing power plant.

·Commissioning of GAS TURBINE. (GE FRAME 9E PG 9171)

·Commissioning of BOILER FEED PUMPS. (350 TPH KSB MAKE)

·Performed preventative maintenance and repairs to the plant's boilers, turbine-generator, conveyor system, and other auxiliary equipment.

·Engineer in charge of the water treatment program (open & closed loops).

·Provides technical expertise for boiler and auxiliary equipment applying precision maintenance concepts that ensure equipment meets mechanical standards as required by statutory regulations.

·Install and commission mid-size steam turbines, generator sets, air compressors and diesel engines. Plan and execute mechanical inspections (major & minor outages) of air compressors, diesel engines and turbine generator sets.

·Was charged with the removal of B&W coal mills and oversaw the installation of new ductwork for the conversion of the units from coal firing to natural gas including gas recirculation fans, forced draft fans, induced draft fans and supporting ductwork.

·I was a member of the startup QC/QA team at Monroe super critical station FGD/SCR project.

·Managed power plant maintenance, fuel distribution, energy conservation projects, system upgrades and mechanical construction, with a focus on process optimization and reliability.

·Successfully prepared model of 210 MW PF boiler. (Length 3 ft, Width 1.75ft, Height 7ft)

7.Saudi Aramco Engineering Power Plant Project (Saudi Arabia)

Position: Electrical Supervisor

Period: July 2006 to Aug 2009

·Involving the work of 500MW thermal power plant project and installation of Plant LV, HV&EHV electrical equipment inside, outside the plant and switch yard erection and pre commissioning.

·Installation of 400KV/200KV switchyard and its accessories control structural and equipment erection, switchyard overall earthing arrangements Double moose conductor stringing, arrangements of Jumbering, installations of isolator, sf6 breakers.

·Breaker, Lighting Arrester, Wave Drop, Capacitor Voltage transformer and switchyard control wiring and control panel installation and pre commissioning, Installation of Cable tray in switchyard and laying of LT, control cable and switchyard earthing.

·Installation of BMK Control Panel, sf6 Control Panel, Isolator Control Panel, Earth Rod Control Panel and Pre Commissioning.

·Inside Thermal Plant overall cable tray arrangements and HT, LT, Low Current Cable Laying and overall Plant Lighting System Arrangement.

·Installation of G.T. Transormer 400/21 KV, 200 MVA 1 nos. and its Bus Duct Arrangements and its Body Earthing, Lightening and neutral Grounding resistance earthing.

·Involve the work in installation and testing commissioning of 3*250 MW dual mode SIEMENS gas turbine power plant and its transformers 300 MVA, 15MVA transformers (HYUNDAI), Switch Gear, Protection Panels and Auxiliary transformers in the power plant.

·Installation and testing commissioning of GSU 20/400KV, 400MVA transformers 2 Nos, 20/220KV, 400 MVA 1 Nos, and its local and remote control panels.

·Installation and testing commissioning of UAT 30MVA 20/6.6, 6.6 KV unit and station transformers 3 Nos. and its local and remote control panels.

·Installation and testing commissioning of transformer project panels, PCC Panels, GCB Panel, MCC Panels, Cable Protection Panels, Differential Protection Panel and Relay Panels.

·Control Wiring Checking and Modification and also Interlock Checking with drawings and modifications if it is necessary.

·Installation and testing commissioning of 6.6KV Station Switchers, 400 V Unit Switch Gears and its brakers VCB, ACB, MCCB and its relay settings, its control wiring checking and modification and also interlock checking with required system.

·Installation and testing commissioning of 400KV, 220KV substation interlocking system with GCB panel, transformer protection panel for GSU, UAT firefighting panel and control wiring checking for above system.

·Testing and commissioning of high and low voltage, electric network and transformer substation, preparation of technical specification, installation and operation of medium Voltage Cable Networks, installation, testing and commissioning.

·Switch Gear & Transformer testing up to voltage level of KV. 500 MW Power plant, Testing and commissioning of Transformer, H.T& L.T,motors, Site Testing of HT & LT Panels, Cables, Logical and Other Panels.

·HT& LT Electrical Projects, sub-stations, transmission & distribution drawing related with control, protection, interlocking working with medium & high voltage switch gears equipments, power transformers, HV/MV cables, station auxiliaries, HV&EHV

Electrical Project Testing and Commissioning of Various Make, Transformer ( 500,750,1000,1600,2500 KV.A, 16,35,70,200, M.V.A).

·Generator ( ( 500,750,1000,1600,2500 KV.A) and Motor ( L.T motor up to 250 H.P,H.T motor up to 4000 H.P), protection relays, Differential protection, over current and Earth fault, over and under Voltage relays. Control & Relay panels.

·Electrical switchgear VCB,ACB,OCB and SF6 Breaker and isolators. Power transformers, Distribution transformers, current transformers, potential transformers.

·Battery chargers converter panel, inverter panel, Battery banks, Neutral grounding resisters of transformers, Supervision of EHV, MV& LV Industrial and utility Electrical installations up to 400/220 Have experience on the project involving substations, indoor switchgears, control and protection panels, HV& MV power cabling and control cabling.

·Experience in power distribution, handled erection of power distribution line, 11/415V 33/11K V, 22/415V, 400/220KV sub- stations for power distribution Experience in Project of HV, MV, & LV ( Cabling, Cable trays & junction boxes termination cable testing, cable jointing, UP’s, motors, Actuators, lighting, Switchgear, Transformers, RMU’s)

EDUCATIONAL QUALIFICATION

Electrical & Electronics ENGG.

COMPUTER PROFICIENCY

WINDOWS & MS OFFICE, MSWORD, EX-CEL, AUTO-CAD-2007

PROJECTS

SEMI-SERVO STABILIZER

Languages Proficiency

·English, Malayalam

·Tamil, Hindi

Passport Details:

PASSPORT NO : P3395791

COUNTRY : INDIA

DATE OF ISSUE : 31/08/2016

DATE OF EXPIRY : 30/08/2026

PLACE OF ISSUE : TIRUCHIRAPPALLI

Personal Details:

NAME : P. Venkat

Father’s Name : S. Perumalsamy

Date of Birth : 15/04/1984

Nationality : Indian

Sex : Male

Marital Status : Single

Declaration

I hereby declare that the above information is true up to my knowledge.

Yours Truly

(P. VENKAT)



Contact this candidate