Post Job Free

Resume

Sign in

Manager Project

Location:
Sohar, Al Batinah Region, Oman
Salary:
U$ 4,000.00
Posted:
January 16, 2020

Contact this candidate

Resume:

GREGORIO

G. MANZO

BS ARCHITECTURE

Post Box **0, Postal Code 322

Sohar, Sultanate of Oman

c/o Edwin G. Manzo

+968-********

adbbkk@r.postjobfree.com

adbbkk@r.postjobfree.com

ABOUT ME:

WORK EXPERIENCE

( Summary of Job Descriptions on page- 4 )

Studied Bachelor of Science in Architecture at the Technological Institute of the Philippines, Manila. With professional experience in field of Architecture & Interior Design and Construction.

Project Management, Mgt. in Building Information Modeling (BIM), computer aided design & drafting (CADD) manual drafting and sketching, 3D modeling & rendering.

JOMARI ENTERPRISE

Project Manager

Pasig, M. Manila

Jan 2017 – Present

Holylife Hospital - UBF Healthcare Inc., Life Homes Subdivision, Rosario Pasig

Existing & New Building, consist of 1 basement & Parking, Ground Lobby and Out-Patient Services, 3 Floors Medical Rooms and Roof Deck.

Contract Period: 1.5-Year Value: Php. 75 M.

TAKENAKA CORPORATION SINGAPORE

Design Architect, BIM & Site Coordinator

PROJECT INVOLVEMENT:

International Airport:

Terminal 4, Singapore Terminal 3, Dubai

Terminal 3, Singapore

7 Star Hotel:

Palm Jumeirah Sofitel Hotel

and Resort, Dubai.

Restoration of 18th Century

Bldg. & Clock Tower, SG.

LRT & MRT Station, Singapore. Wafer Fab/Clean Room, SG.

Hospitals:

100 Beds Holylife Hospital Mla

100 Beds Hospital, Khafji, KSA.

Oil & Gas Refinery (OSI)

ARAMCO, Rastanura, KSA.

KANOO Residential Compound

Residential Palace and

Resdtl. Villas, Dammam KSA.

Royal Saudi Airforce

Community Center Dar Al

Riyadh, Al Kharj KSA.

Singapore

Jan 2014 – Nov 2016

Proposed Terminal 4, Changi Airport

New passenger terminal building with a planned capacity of 16 million passenger movements annually, a multi-storey car park and an open-air car-park accommodating up to 1,500 lots. A two-storey holding area for taxis to pick up arriving passengers, road improvement work to facilitate traffic — including vehicles departing from T4 to East Coast Parkway. A connecting bridge across Airport Boulevard for buses and airside vehicles, and a 68m-high Ramp Control Tower for air traffic-control operations.

Contract Period: 3-Years Value:S$985million

SATO KOGYO (S) Construction Pte. Ltd.

Project Architect

Singapore

Sep 2011 – Nov 2013

Victoria Theatre and Victoria Concert Hall Additions & Alterations

Conservation and Restoration of 107 year old Heritage Building including the Clock Tower and the restoration of Clock Movement and 5 Historical Bells.

Contract Period: 2-Years Value: S$44,980,000.00 M.

COMPUTER SKILLS:

EVAN LIM-PENTA Construction Co. LLC

Project Architect

Microsoft Project, BIM - Revit Architecture 2014, AutoCAD 2014, 3D Studio Max

Accurender V3.0, INTERGRAPH MicroStation (unix & windows) INTERGRAPH IRAScan 32, Macromedia Dreamweaver, Apple Macintosh OS.X, MS Office 2010, DOS/Unix/Windows 98/ NT4.0-Server/Workstation, Windows 2000 Server/Pro,

Microsoft FrontPage, Microsoft Visio Pro.

Adobe Photoshop, Adobe Lightroom, Adobe Premiere Pro.

Dubai, UAE

Sep 2009 – Oct 2010

The Construction of Palm Jumeirah Sofitel Hotel & Resort

Consist of Basement Car Park, Main Hotel Bldg., Banquet Bldg. Apartments, Lodge Villas, Beach Suites, Restaurants & Swimming Pools.

Contract Period: 3-Years Value:850 Million AED.

SYSTEM CONSTRUCT L.L.C.

Senior Architect

Dubai, UAE

Oct 2006 – Sep 2009

Sama Dubai; Lagoons Sales Center. Value: 52M AED

Sama Dubai; Jumeirah Hills Sales Center

Value: 52M AED Dynergy Technology; Factory & Office Building

Value: 15M AED

UAE Exchange; Exchange Center/Ground + Mezz.

Value: 1.6M AED

AL ABBAR STAINLESS

Project Coordinator

OTHER SKILLS:

UAV Pilot (Drone) with 12 hrs. total flight time.

Photography & Videography

Photo & Video Editing.

(DJI Phantom 2 - Vision Plus)

IT – Administration of File Storage Server, Installation & configuration of CAD & Graphics Software, printer and plotter support.

Dubai, UAE

Jul 2005 – Aug 2006

The Construction of Dubai International Airport, U.A.E.

Car Park, Terminal 3 and Concourse 2

Internal Package - Consist of Stainless Steel claddings, Glass & Aluminum, Curtain Walls & Spider System.

Value:145M AED

SHIMIZU (S) CORP.

Site Architectural Coordinator

Singapore

Apr 2004 – Jul 2005

The Construction of Singapore Changi Airport Terminal 3

GFA 430,000 sqm. Spread over seven levels (including 3 levels of Underground car parks) 28 boarding gates, including 8 gates capable to handle the new super Jumbo Jet Airbus A380.

Value: US$ 882 Million, 3.5 Years.

FOLLOW ME:

Previous project photos:

https://www.flickr.com/photos/186406660@N08/albums

A.M. ASSOCIATES (Singapore) PTE. LTD.

IT/CAD Manager

Singapore

Apr 1999 – Jul 2005

SSMC Wafer Fab, ST Microelectronics -AMK8, SMU

LinkedIn:

https://www.linkedin.com/in/greg-g-manzo-30b88a64/

SMALLWOOD, REYNOLDS, STEWART

STEWART & ASSOCIATES PTE.LTD.

IT/CAD Specialist

Facebook:

https://www.facebook.com/Renaissance-Studio-Photography-151************/

Singapore

July 1998 – Apr 1999

West Bay Complex, Doha Qatar

Consists of Hotel, Marina, Retail Office Tower & Club

Fountain Square, Tampa, Florida, U.S.A.

Continuation….

HAN, YIP & LEE ASSOCIATES

Technical Manager

Singapore

July 1996 – June 1998

Sengkang LRT Station,

Sengkang HDB Proj.

Choa Chu Kang MRT Station

Residential Villas, Multi Storey Car Park

APCO - Architects and Town Planners Collaborative

CAD – Architectural Designer

Singapore

Feb 1995 – July 1996

St. Michael and Aberdeen Private Condominium,

Serangoon Rd.

Hazel Park Private Condominium, consist of Apartments, Clubhouse, Basement Carpark, Swimming Pools & Tennis Courts.

EDAS - Engineering Design and Supervision Firm

CAD Architect

Al Khiobar, KSA

Feb 1993 – Dec 1993

100 Beds Arabian Oil Company Hospital & Residential Villas.

ARABSCAN Rebdi and Belali Consulting Engineer

Team Leader/Coordinator

Dec 1991 – Dec 1992

On-Shore Inspection, ARAMCO Dhahran & Rastanura, Kingdom of Saudi Arabia. (World biggest Oil Refinery)

AL SUHAIMI DESIGN.

CAD Architect

Dammam, KSA

Mar 1989 – Dec 1991

Residential Villas & Commercial Complex

I. AL KHALDI ENGINEERING OFF.

Architectural Designer cum Draftsman

Dammam. KSA

Jan 1985 - 1989

Al Zamil Residential Complex,

Al Kanoo Residential Complex, consist of swimming

pool, man-made lagoon & Landscape Areas.

Residential Villas

TRANS ASIA (Phils.) INC.

Mechanical Draftsman (HVAC, Piping, Fire Sprinkler)

Makati, M.Manila

Oct 1982 – Jan 1984

Royal Saudi Air Force, Al Kharj, KSA

Military Community consist of High-rise Apartments, Shopping, Center, Radio/TV Stations & Underground Fuel Oil Storage Tank.

JOB DESCRIPTIONS:

Project Management:

Coordinating internal resources and vendors for the flawless execution of projects.

Ensuring that all projects are delivered on-time, within scope and within budget.

Coordinate internal resources and third parties/vendors for the flawless execution of projects.

Ensure that all projects are delivered on-time, within scope and within budget.

Developing project scopes and objectives, involving all relevant stakeholders and ensuring technical feasibility.

Ensure resource availability and allocation.

Develop a detailed project plan to track progress.

Use appropriate verification techniques to manage changes in project scope, schedule and costs.

Measure project performance using appropriate systems, tools and techniques.

Report and escalate to management as needed.

Manage the relationship with the client and all stakeholders.

Perform risk management to minimize project risks.

Establish and maintain relationships with third parties/vendors.

Create and maintain comprehensive project documentation.

Site Works & Coordination:

Prepare design program and schedules using Microsoft Project.

Propagate the principle of design as per contractors’ point of view to accelerate site works.

Attend meetings, create accurate project notes and take follow-up action on projects.

Identify and resolves issues and conflicts within the project team.

Coach, mentor, motivate and supervise project team members as per standards.

Build, develop and raise any business relationships vital to the success of the project.

Ensuring project transfer and drawings between parties as required by project.

Study in advance all related works as per construction drawings and revisions in accordance with the specifications and contracts.

Liaise with the main contractor and sub-contractors to coordinate all interfacing materials.

Coordinate with the estimation department if there is any variation in the design.

Prepare progress report. Conduct weekly or urgent meeting to the design team to keep them inform of any changes or discrepancies on the job site.

Prepare Site Clarification Request (SCR / RFI) for clarification of discrepancies and missing information from the construction drawings. Design support; also prepare partial plans, elevations, sections and detail drawings of stainless steel cladding, aluminum doors and windows as well as curtain walls - unitized & spider system.

Document control such as monitoring of sample submission, approval status of shop drawing and to ensure all trades are on schedule. Request for Information (RFI) for clarification of any discrepancies or missing information to the Consultants including site supervisions.

Monitor daily site activities, structural and architectural works on site whether it is to be constructed in accordance with construction drawings and specifications.

Perform ON-SHORE INSPECTION (OSI) and AS-BUILT drawings in ARAMCO Rastanura Oil Refinery, employee batch no. C-50891. Coordinate with Production Manager, Cad operators and other group leaders regarding work schedule. VECTORIZATION and RASTER EDITING of Aramco existing Drawings, E1D, PID, ILD, Detail Plan and ISOmetric drawings using INTERGRAPH MicroStation 32, MicroStation PC and AutoCAD R11.

Do plans and section of underground Fuel Oil Storage Tank. Do Fire Protection and H.V.A.C. plan.

Do Waste, Water and Storm drain piping layout. Do swimming pool piping plan and Flow diagram.

BIM Mgt & Coordination :

Responsible for BIM implementation and enforcement. Review and

Documentation, design and coordination conflicts.

Run and analyze clash detection on federated model. Communicate conflicts in model; both real and potential.

Prepare and distribute clash reports to facilitate the coordination process.

Manage and distribute coordinated digital documents to the project team.

Do site inspection and liaising with trade contractors.

Meet with the designer consultants and other contractors as required to facilitate review of models as needed.

Create a plan for implementation base in the project requirements, who are the team members, what is the project what are the goals.

Report on the company’s current and projected state in regards to BIM implementation.

Architectural & Interior Design:

Involved in preparation of architectural & interior drawings, concept design to development of construction drawings, design competitions, 3D modeling and rendering, interior design and client presentations, conceptualize/interpret design and micro detailing.

Conducted in-depth studies and analyses of areas to be designed to establish requirements that insure that the user's needs are met.

Developed schematic furniture layouts to determine practical requirements and project limitations.

Assisted the project manager and client with developing collateral equipments, including cost and acquisition strategy.

Estimated material requirements and costs and presented design to client for approval.

Advised client on interior design factors such as space planning, layout and utilization of furnishings or equipment, and color coordination.

Project design coordination, do construction and shop drawings, liaise with contractors and building material suppliers.

Strong knowledge in CADD system and Customization.

Strong design skills in Commercial & Residential Planning & Design.

Capable to lead from small to large size team player in transparent honesty and integrity

Ability to meet strict deadlines and communicate effectively in English.

Extensive knowledge of construction detailing and specifications.

EDUCATION & TRAINING:

TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES

Bachelor of Science in Architecture

1979 - 1983

Architectural Design

ARABSCAN, REBDI BELALI

MicroStation 32

Feb. 1992

IRAS, PC & Workstation

CROWN SYSTEMS (S) PTE. LTD.

Autodesk Revit Architecture Fundamentals 2014

July 15, 2015

Autodesk Revit Architecture

REFERENCES

Engr. Jobert Acantilado, General Manager, JOMARI ENTERPRISES

Yamamoto, Project Manager, TAKENAKA CORPORATION (S).

Jun Kato, Project Manager, SATO KOGYO (S) Pte. Ltd.

Massimo Mercurio, Managing Director, A.M. ASSOCIATES, Singapore

I hereby certify that the above information is true and correct to the best of my knowledge and belief.

GREGORIO G. MANZO

Applicant



Contact this candidate