Resume:

V.KRISHNAN A/L G.VENGADA SALAM @ ROY

HP +601******** / 011-******** E-MAIL adba4v@r.postjobfree.com AGE 49+

HOME ADDRESS C-1-2-8 Ocean View Resort Condominium,Batu 9,Jalan pantai, Teluk Kemang71050 Port Dickson,Negeri Seembilan

NATIONALITY Malaysian MARITAL STATUS Married

PROFESSIONAL AFFILIATION

Registered Construction Personnel with Construction Industry Development Board, CIDB

Member of Singapore Institute Of Engineering Technology

EXPERIENCES

Project Manager at Elmibina Sdn. Bhd. (April 2017 – Present)(Project Value RM42Millions)

(Projek D49 –Pembinaan Rangkaian Paip Pembentungan Di Kajang 1 & Kajang 3 Selangor)

(Project Upgrading Sludge Treatment Facility Package 2: Upgrading Sludge Holding Tank And Other Associated Works For BUKIT NANAS & WANGSA MAJU Sludge Treatment Facility)(Project Value RM7Millions)

Responsibilities:

Plan,Execute and successfully completed the sewerage pump stations D49 package.Kajang six (6) plants of 125,000PE,115,000PE,15,000PE,10,000,5000PE

And 1000PE

Lead the Construction of One of the Plant of sub-structure works depth of !7metres by method of Top Down Construction

Coordinate and execute with Mechnical Contractors on installation of pipe,fittings,high capacity pumps,Process Instruments Penstock,Mechnical Screeens,Oduor Removal System and Surge Vessel and other associates works

Liaise with Electrical team with all aspect of Electrical& Instrumentation works

Carry out internal testing,Dry test and External Endurance Test

Have involved on all aspects of planning& testing from PDC2 to PDC8

Sound knowledge in Desludging & Decommissioning works MDU (Mechanical Dewatering Unit)and Sewerage Networking

Coordinate with Surveyors on all settings,UDM,Dilapidation,Soil Investigation and As-built data and drawings.

Involved in Testing & Commissioning,plant maintenance of RSP(pump),blowers, aerator,piping, valves, electrical panel and instrumentation

Sound knowledge of Water Treatment Plant Construction

Manage the day-to-day working, utilization and technical implementation.

Report Writing and project correspondence.

Manage site activities and site supervision team.

Attend site Progress meeting, Technical meeting and Risk Assessment meeting.

Manage and coordinate daily progress schedule, materials, machineries and equipments.

Verify progress and sub-contractors claims.

Attend join site evaluation client and subcontractor.

Liaise with consultant with all technical aspects of project.flow

Liaise on with Project Management Team,(IWK )and Jabatan Perkhidmatan Pembentungan JPP(Client)

Conduct staff meeting

Coordinate daily site safety matters.

Attend Safety Committee Meeting

Review and monitor all QA& QC documents

Technical Report Writing,, Technical & sample materials submission, Method of statement, Submission Shop drawing for approval and other Technical submission pertaining for approval.

Construction Manager at Altis Engineering Sdn Bhd. (2016-2017)Sub-Contractor ( Sunway Construction)

(Project V201 MRT Sunway,Prima Damansara)(Project Value RM21 Millions)

Responsibilities:

Lead the site technical operation on daily basis,from excavation,

Cut-off pile, Earthing protection, Steel formwork, Rebar Installation and Concreting.

Liaise on with Surveyor on survey works, Reports and as-built

Monitor and Organize daily activity on pit construction, Pre and Post Concrete, installation of electrical earthing protection system

Manage General workers, skill workers on each trade schedule on daily basics and monitor the daily progress target

Manage Site technical team, Review daily site records, Technical records, and Material Usage

Coordinate with site team in all technical aspects of the project.

Attend site joint inspection Pre Concreting and Post Concreting

Raise Request for Information on discrepancies of drawing and actual site works if any

Report writing and submission of progress report.

Supervise on attendance of all site staff

Manage all Construction of Pier Works, Quality and method of Construction

Manage and monitor sub-contractor works, submission of documents and records filling

Coordinate daily site safety matters.

Maintain QA&QC documents, drawing transmittal, drawing log book

Review and close NCR,other site memos

Conduct site staff meeting

Manage and Coordinate with site team on logistic of machinery usage on daily site operation, scheduling of resources of machinery and manpower

Review and approve sub-contractor claims

Proposed work proposal and submitting method of statements

Attend Client Sub- Contractor meeting

Site Manager at Ark Resources Berhad. (2012-2016)

(Projek Pusat Perdagangan Paroi,Seremban,Negeri Sembilan )(Project Value RM28 Millions)

(Projek Perumahan Lembah Bukit Bujang Kuala Kubu Bharu,Selangor )(Project Value RM24 Millions)

(Project NGV Plant KKIP Kota Kinabalu,Sabah)(Project Value RM60 Millions) Green & Brown field

Responsibilities:

Manage and control daily site operation.

Manage in all process of construction, monitor progress work, man power and machineries.

Chaired client and sub-contractors meeting.

Prepare site progress report.

Prepare site work program weekly basis.

Manage site supervision team.

Conduct site staff meeting.

Oversee site safety matters

Review and prepare documents for submission.

Prepare VO’s documentation, site memos and NCR.

Perform joint inspection with QS for sub-contractors progress claims

Verify site claims and work done by sub-contractors.

Site Manager at Xtreme Engineering Sdn Bhd. (2009-2012)

(Projek Pusat Perdagangan Majlis Perbandaran Kuantan Pasir Puteh,Kuantan )(Project Value RM30 Millions)

Responsibilities:

Arrange daily site activities, manpower, machineries and materials.

Manage daily site construction on structural, architecture and infrastructure works.

Manage all sub-contractors works.

Prepare weekly and monthly site work program.

Lead site sub-contractors meetings.

Participate client consultant meetings.

Manage and control site staff.

Sound experience of table forming method.

Site management and materials handling.

Site Supervisor at Kiara Kilat Sdn Bhd. (2008-2009)

(Project Mix Development Emerald West Rawang,Selangor RM12 Millions)

Responsibilities:

Supervise daily operation on KSK.

Supervise sub-contractors works.

Prepare daily report.

Prepare work summary.

Prepare machineries report.

Prepare site progress photos.

Maintenance Supervisor at Aseania Resort & Spa Langkawi (2005-2008)

Simpang Tiga,Jalan Pantai Tengah, Langkawi.Kedah

Responsibilities:

Supervise schedule maintenance, mechanical & electrical trouble shooting

Supervise sub-contractors works.

Coordinate with vendors on breakdown and periodic maintenance

Prepare reports.

Coordinate Maintenance of swimming pool,lift, sound system upgrading & trouble shooting

Supervise the plumbing repair work,cold water,grey water and heating system,air conditioning system

Supervise and keep records on spares inventory

Assist works on technical issues & safety issues

Self Employed, Kishore Handicraft. (2002-2004)Kulim, Kedah

(Renovation Works & Refurbished works)

Plant supervisor at Ansell Kulim (1999-2001) Kulim,Kedah

Responsibilities:

Manage daily production schedule.

Manage and monitor raw materials.

Supervise design process, raw material used on production.

Prepare daily, production report.

Keep records machineries maintenance schedule.

Liaise with QA QC department

Monitor safety practice.

Service & Calibration Engineer at Region Suppliers Sdn Bhd . (1995-1998)

(Service & Callibration Branch Butterworth Province Wellesly )

Responsibilities:

In lab Service and calibrate precise measuring instruments as; dial calipers, digi matic calipers, height gauge, pressure gauge,micro-meters, standard weight and surface plate.

In field service and calibrate precise measuring instruments as micro-scope, tool makers and profile projectors.

Prepare calibration report

Report writing

Liaise with SIRIM on master calibration.

EDUCATION BACKGROUND

1990-1993 - Perak Institute Of Engineering Technology ( PIET)Affiliated to Singapore Institute of Engineering Technology(SIET)

Diploma in Civil Engineering

Major : Civil Engineering

Specialization : Structure

Graduation Date : 1993

2016 -2017- Asian Institute of Professionals, University of Newcastle USA

Bachelor of Project Management

Degree in Project Management

Certificate of attendance

Qlassic Shasssic Cidb

Qlassic Awareness Course Cidb

Leadership & Supervisory Skills Smidec

RELATED COURSEWORK

Engineering Mathematics 1&2

Architectural Drafting 1,2,3&4

Engineering Science 1&2

Surveying & Leveling 1 & 2

Strength of Materials 1&2

Uniform Building by –laws

Principal of electricity 1& 2

Architectural Design 1& 2

English Communication 1&2

Building Materials 1& 2

Workshop Technology 1&2

Computer Programming

Fluid mechanics

Civil Engineering Materials 1 & 2

Construction Technology

ThermoDynamics

Building Construction

Engineering Drawings 1 & 2

SKILLS

Language Proficiency: English, Malay & Tamil.

Able to use Microsoft Office applications.

Able to read blueprints on Architectural & Structural drawing

An independent worker as well as a dynamic team player and able to communicate well with all levels.

Strong leadership, teamwork abilities gained from employment and result oriented

To build individual and technical skills in the related field

To enhance my communication and presentation skills.

Basic Land Survey & Leveling

PREFERENCES

Prefer working in a conduciveenvironment, where priorities are given for performance and career advancement.

Expected Salary: (negotiable)

Availability: Immediate

Possess Valid Driving License:B2 & D

REFEREE

Mr. Mahendran Ramadas

Resident Engineer

Visi Nusajaya Sdn Bhd.

No: 014 – 929 1709

En.Khalit

Resident Engineer

MRT

No.:019*******

Mr.Manickavasagam Subramaniam

Ex-General Manager (Asenia Resort & Spa Langkawi)

H/P:018- 5772487



Contact this candidate