Post Job Free

Resume

Sign in

Construction Project

Location:
Akora, North-West Frontier Province, Pakistan
Posted:
January 15, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONAL:

Post employer : SENIOR PROFESSIONAL QUANTITY SURVEYOR (civil)

Name : Niaz Faraz Khan Gabari

Father Name : Saleh Muhammad

Qualification : B-Tech Hons CIVIL

Date of Birth : 3rd March, 1978

Domicile : Pukhtoon Khwa

Nationality : Pakistani

Passport No : BQ8911222

CNIC : 13202-0736122-7

Religion : Islam

Marital Status : Married

E-mail ID : adba47@r.postjobfree.com

Contact No : 033*-*******, 034*-*******

Permanent Address : Mingora City Battai Chowk District Swat Tehsil Babuzai KPK

ACADEMIC DURATION BOARD/INSTITUTE

B. TECH (Hons) 4 years D.I.H.E SINDH (Karachi) D.A.E 3 years B.T.E KPK (Peshawar) S.S.C B.I.S.E KPK (Abbottabad)

ADDITIONAL QUALIFICATION

QUANTITY SURVEYING 6 Months N.E.S.T SINDH (Karachi)

COMPUTER SKILL

Auto Cad MS Office

OBJECTIVES:

I am an enthusiastic professional Quantity Engineer possessing sound personality with all the characteristics necessary for the accomplishment of assigned job, performing duties to the entire satisfaction of the superior with full zeal, diligence. I would like to work in any field of civil engineering including Bridges, Highways, Metro, Motorway, Flyover, Tunnel, Cut & Cover Tunnel, and Infrastructures work. My desire position would include achieving results either independently or as a member of the team.

AREAS OF EXPERTISE:

Office Management and Monitoring of Bridges, Roads, Metro, Motorway, Flyover, Tunnel, Cut & Cover Tunnel, infrastructures Projects, B.O.Q, PC-1, Tendering, Rate Analysis, BBS, Escalation, TS, IFC Drawings Quantities, Quantity Analysis, etc.

PROFESSIONAL EXPERIENCE:

PROJECT No.08

Period: From April, 2015 To Continue.

EMPLOYER : Professional Engineering Services Islamabad (PEAS).

POSITION : Senior Quantity Surveyor.

PROJECT : Yakmach-Kharan 200 Km Road Project Baluchistan Section III&IV.

CLINT : National Highway Authority Islamabad Pakistan (NHA).

CONSULTANTS : Professional Engineering Services Islamabad (PEAS).

CONTRACTORS : D-Baluch Construction Company (Pvt) Ltd Karachi.

DUTIES :

Worked at Job Included.

A. Preparation of Interim Payment Certificate (IPC).

B. Preparation of Measurement Book (MB).

C. Calculation of Quantities like, Structure, Roads, Bridges & protection, Cover & Tunnel work.

D. Checking of IPC, s, Variation orders, and Technical sanction.

E. Checking the time Extension Schedule.

F. Checking of work Schedule Program.

G. Checking of shop drawings & Bar Bending schedule (BBS).

H. Checking of as built drawings.

I. Plotting of vertical and horizontal profile’s in Auto CAD.

J. Plotting of Cross Section in Auto CAD.

K. Taking of cross section.

L. Preparation of bill of quantities (BOQ)

M. Preparation of cross section.

N. Take of quantities of area (civil) electrical & mechanical works from GFC drawings.

O. Preparation of rate analysis for variation orders.

P. Checking of site inspection reports JMs for various works as per approved construction drawing and site verification works executed by the contractor.

Q. Preparation tender and construction documents.

R. Preparation of Quantity Surveyor report and monthly cash flow.

S. Take off for overall Project Quantities.

T. Checking of subcontractor bills and clarification.

U. Preparation of monthly valuation & certification from contractor and consultants.

V. Checking & receiving analyses quotations, liaising with contractor managers & site agent regarding price proven history, availability etc.

W. Preparation of revised PC-1.

X. Design of work flow chart for contractor & Team Leader.

PROJECT No.07

Period: From July, 2017 To March, 2019.

EMPLOYER : Associated Consulting Engineers Lahore (A.C.E).

POSITION : Senior Quantity Surveyor.

PROJECT : North Portal Package-II Lowari Tunnel Project.

CLINT : National Highway Authority Islamabad Pakistan (NHA).

CONSULTANTS : Associated Consulting Engineers Lahore (A.C.E).

CONTRACTORS : UIA & NCC (JV).

DUTIES :

Worked at Job Included.

A. Preparation of Interim Payment Certificate (IPC).

B. Preparation of Measurement Book (MB).

C. Calculation of Quantities like, Structure, Roads, Bridges & protection, Cover & Tunnel work.

D. Checking of IPC, s, Variation orders, and Technical sanction.

E. Checking the time Extension Schedule.

F. Checking of work Schedule Program.

G. Checking of shop drawings & Bar Bending schedule (BBS).

H. Checking of as built drawings.

I. Plotting of vertical and horizontal profile’s in Auto CAD.

J. Plotting of Cross Section in Auto CAD.

K. Taking of cross section.

L. Preparation of bill of quantities (BOQ)

M. Preparation of cross section.

N. Take of quantities of area (civil) electrical & mechanical works from GFC drawings.

O. Preparation of rate analysis for variation orders.

P. Checking of site inspection reports JMs for various works as per approved construction drawing and site verification works executed by the contractor.

Q. Preparation tender and construction documents.

R. Preparation of Quantity Surveyor report and monthly cash flow.

S. Take off for overall Project Quantities.

T. Checking of subcontractor bills and clarification.

U. Preparation of monthly valuation & certification from contractor and consultants.

V. Checking & receiving analyses quotations, liaising with contractor managers & site agent regarding price proven history, availability etc.

W. Preparation of revised PC-1.

X. Design of work flow chart for contractor & Team Leader.

PROJECT No.06

Period: From April, 2015 To June, 2017.

EMPLOYER : Professional Engineering Services Islamabad (PEAS).

POSITION : Senior Quantity Surveyor.

PROJECT : Yakmach-Kharan 200 Km Road Project Baluchistan Section I&II.

CLINT : National Highway Authority Islamabad Pakistan (NHA).

CONSULTANTS : Professional Engineering Services Islamabad (PEAS).

CONTRACTORS : D-Baluch Construction Company (Pvt) Ltd Karachi.

DUTIES :

Worked at Job Included.

A. Preparation of Interim Payment Certificate (IPC).

B. Preparation of Measurement Book (MB).

C. Calculation of Quantities like, Structure, Roads, Bridges & protection, Cover & Tunnel work.

D. Checking of IPC, s, Variation orders, and Technical sanction.

E. Checking the time Extension Schedule.

F. Checking of work Schedule Program.

G. Checking of shop drawings & Bar Bending schedule (BBS).

H. Checking of as built drawings.

I. Plotting of vertical and horizontal profile’s in Auto CAD.

J. Plotting of Cross Section in Auto CAD.

K. Taking of cross section.

L. Preparation of bill of quantities (BOQ)

M. Preparation of cross section.

N. Take of quantities of area (civil) electrical & mechanical works from GFC drawings.

O. Preparation of rate analysis for variation orders.

P. Checking of site inspection reports JMs for various works as per approved construction drawing and site verification works executed by the contractor.

Q. Preparation tender and construction documents.

R. Preparation of Quantity Surveyor report and monthly cash flow.

S. Take off for overall Project Quantities.

T. Checking of subcontractor bills and clarification.

U. Preparation of monthly valuation & certification from contractor and consultants.

V. Checking & receiving analyses quotations, liaising with contractor managers & site agent regarding price proven history, availability etc.

W. Preparation of revised PC-1.

X. Design of work flow chart for contractor & Team Leader.

PROJECT No.05

Period: From September, 2011 To February, 2015.

EMPLOYER : A.W.Hooker Associates QS/Cost Consultant Canada.

POSITION : Senior Quantity Surveyor.

PROJECT : A-King Aman-u-Allah Khan Highway 31 Km Afghanistan

B- Ahmad Zai Bridge, Myper Bridge, Rood Bridge &-

-Ghazni by Pass Afghanistan.

C-Village Link Roads Jalalabad Afghanistan

E- Village Roads Dara, Nusay, Kandibagh, Roshtaq

CLINT : US AID (Mazar Shrif) Branch Afghanistan.

CONSULTANTS : A.W.Hooker Associates QS/Cost Consultant Canada.

CONTRACTORS : A-Techno Style B-C.C.C. C-Hewadwall Construction.

DUTIES :

Worked at Job Included.

A. Preparation of Interim Payment Certificate (IPC).

B. Preparation of Measurement Book (MB).

C. Calculation of Quantities like, Structure, Roads, Bridges & protection, Cover & Tunnel work.

D. Checking of IPC, s, Variation orders, and Technical sanction.

E. Checking the time Extension Schedule.

F. Checking of work Schedule Program.

G. Checking of shop drawings & Bar Bending schedule (BBS).

H. Checking of as built drawings.

I. Plotting of vertical and horizontal profile’s in Auto CAD.

J. Plotting of Cross Section in Auto CAD.

K. Taking of cross section.

L. Preparation of bill of quantities (BOQ)

M. Preparation of cross section.

N. Take of quantities of area (civil) electrical & mechanical works from GFC drawings.

O. Preparation of rate analysis for variation orders.

P. Checking of site inspection reports JMs for various works as per approved construction drawing and site verification works executed by the contractor.

Q. Preparation tender and construction documents.

R. Preparation of Quantity Surveyor report and monthly cash flow.

S. Take off for overall Project Quantities.

T. Checking of subcontractor bills and clarification.

U. Preparation of monthly valuation & certification from contractor and consultants.

V. Checking & receiving analyses quotations, liaising with contractor managers & site agent regarding price proven history, availability etc.

W. Preparation of revised PC-1.

X. Design of work flow chart for contractor & Team Leader.

PROJECT No.04

Period: From April, 2009 To May, 2011.

EMPLOYER : Saud Consult Kingdom of Saudi Arabia Dammam KSA.

POSITION : Quantity Surveyor.

PROJECT : King Fasil-Bin-Abdul Aziz International Highway Project KSA.

CLINT : Ministry of Saudi Arabia (KSA).

CONSULTANTS : Saud Consult Kingdom of Saudi Arabia Dammam KSA.

CONTRACTORS : Saudi Bin-Ladin Group (KSA).

DUTIES :

Worked at Job Included.

A. Preparation of Interim Payment Certificate (IPC).

B. Preparation of Measurement Book (MB).

C. Calculation of Quantities like, Structure, Roads, Bridges & protection, Cover & Tunnel work.

D. Checking of IPC, s, Variation orders, and Technical sanction.

E. Checking the time Extension Schedule.

F. Checking of work Schedule Program.

G. Checking of shop drawings & Bar Bending schedule (BBS).

H. Checking of as built drawings.

I. Plotting of vertical and horizontal profile’s in Auto CAD.

J. Plotting of Cross Section in Auto CAD.

K. Taking of cross section.

L. Preparation of bill of quantities (BOQ)

M. Preparation of cross section.

N. Take of quantities of area (civil) electrical & mechanical works from GFC drawings.

O. Preparation of rate analysis for variation orders.

P. Checking of site inspection reports JMs for various works as per approved construction drawing and site verification works executed by the contractor.

Q. Preparation tender and construction documents.

R. Preparation of Quantity Surveyor report and monthly cash flow.

S. Take off for overall Project Quantities.

T. Checking of subcontractor bills and clarification.

U. Preparation of monthly valuation & certification from contractor and consultants.

V. Checking & receiving analyses quotations, liaising with contractor managers & site agent regarding price proven history, availability etc.

W. Preparation of revised PC-1.

X. Design of work flow chart for contractor & Team Leader.

PROJECT No.03

Period: From August, 2008 To March, 2009.

EMPLOYER : A.W.Hooker Associates QS/Cost Consultant Canada.

POSITION : Quantity Surveyor.

PROJECT : Egypt Fast Track Projects Maser.

CLINT : Meddle East Founded.

CONSULTANTS : A.W.Hooker Associates QS/Cost Consultant Canada.

CONTRACTORS : ABC.

DUTIES :

Worked at Job Included.

A. Preparation of Interim Payment Certificate (IPC).

B. Preparation of Measurement Book (MB).

C. Calculation of Quantities like, Structure, Roads, Bridges & protection, Cover & Tunnel work.

D. Checking of IPC, s, Variation orders, and Technical sanction.

E. Checking the time Extension Schedule.

F. Checking of work Schedule Program.

G. Checking of shop drawings & Bar Bending schedule (BBS).

H. Checking of as built drawings.

I. Plotting of vertical and horizontal profile’s in Auto CAD.

J. Plotting of Cross Section in Auto CAD.

K. Taking of cross section.

L. Preparation of bill of quantities (BOQ)

M. Preparation of cross section.

N. Take of quantities of area (civil) electrical & mechanical works from GFC drawings.

O. Preparation of rate analysis for variation orders.

P. Checking of site inspection reports JMs for various works as per approved construction drawing and site verification works executed by the contractor.

Q. Preparation tender and construction documents.

R. Preparation of Quantity Surveyor report and monthly cash flow.

S. Take off for overall Project Quantities.

T. Checking of subcontractor bills and clarification.

U. Preparation of monthly valuation & certification from contractor and consultants.

V. Checking & receiving analyses quotations, liaising with contractor managers & site agent regarding price proven history, availability etc.

W. Preparation of revised PC-1.

X. Design of work flow chart for contractor & Team Leader.

PROJECT No.02

Period: From February, 2005 To July, 2008.

EMPLOYER : D-Baluch Construction Company (Pvt) Ltd Karachi.

Note. Work at Head Office Karachi (M8 Section).

POSITION : Quantity Surveyor.

PROJECT : Gawader-Ratodero Road (M-8) Wangu Hill Reach 40 Km Project.

CLINT : National Highway Authority Islamabad Pakistan (NHA).

CONSULTANTS : ACC Islamabad.

CONTRACTORS : D-Baluch Construction Company (Pvt) Ltd Karachi.

DUTIES :

Worked at Job Included.

A. Preparation of Interim Payment Certificate (IPC).

B. Preparation of Measurement Book (MB).

C. Calculation of Quantities like, Structure, Roads, Bridges & protection, Cover & Tunnel work.

D. Checking of IPC, s, Variation orders, and Technical sanction.

E. Checking the time Extension Schedule.

F. Checking of work Schedule Program.

G. Checking of shop drawings & Bar Bending schedule (BBS).

H. Checking of as built drawings.

I. Plotting of vertical and horizontal profile’s in Auto CAD.

J. Plotting of Cross Section in Auto CAD.

K. Taking of cross section.

L. Preparation of bill of quantities (BOQ)

M. Preparation of cross section.

N. Take of quantities of area (civil) electrical & mechanical works from GFC drawings.

O. Preparation of rate analysis for variation orders.

P. Checking of site inspection reports JMs for various works as per approved construction drawing and site verification works executed by the contractor.

Q. Preparation tender and construction documents.

R. Preparation of Quantity Surveyor report and monthly cash flow.

S. Take off for overall Project Quantities.

T. Checking of subcontractor bills and clarification.

U. Preparation of monthly valuation & certification from contractor and consultants.

V. Checking & receiving analyses quotations, liaising with contractor managers & site agent regarding price proven history, availability etc.

W. Preparation of revised PC-1.

X. Design of work flow chart for contractor & Team Leader.

PROJECT No.01

Period: From March, 2000 To January, 2005.

EMPLOYER : Tekfen Construction Company Kazakhstan.

POSITION : Quantity Surveyor.

PROJECT : Trade Bridge over River Oxus Bridge, Zeravshan Bridge-

-& Dushanbe International Highway Projects Tajikistan.

CLINT : Tajikistan Communication Ministry Dushanbe.

CONSULTANTS : SMR Design Consulting Engineers.

CONTRACTORS : Tekfen Construction Company Kazakhstan.

DUTIES :

Worked at Job Included.

A. Preparation of Interim Payment Certificate (IPC).

B. Preparation of Measurement Book (MB).

C. Calculation of Quantities like, Structure, Roads, Bridges & protection, Cover & Tunnel work.

D. Checking of IPC, s, Variation orders, and Technical sanction.

E. Checking the time Extension Schedule.

F. Checking of work Schedule Program.

G. Checking of shop drawings & Bar Bending schedule (BBS).

H. Checking of as built drawings.

I. Plotting of vertical and horizontal profile’s in Auto CAD.

J. Plotting of Cross Section in Auto CAD.

K. Taking of cross section.

L. Preparation of bill of quantities (BOQ)

M. Preparation of cross section.

N. Take of quantities of area (civil) electrical & mechanical works from GFC drawings.

O. Preparation of rate analysis for variation orders.

P. Checking of site inspection reports JMs for various works as per approved construction drawing and site verification works executed by the contractor.

Q. Preparation tender and construction documents.

R. Preparation of Quantity Surveyor report and monthly cash flow.

S. Take off for overall Project Quantities.

T. Checking of subcontractor bills and clarification.

U. Preparation of monthly valuation & certification from contractor and consultants.

V. Checking & receiving analyses quotations, liaising with contractor managers & site agent regarding price proven history, availability etc.

W. Preparation of revised PC-1.

X. Design of work flow chart for contractor & Team Leader.

ASSIGED OF MAJOR PROJECTS SUMMARY

Senior Quantity Surveyor Professional Engineering Consultants 2019 to date Senior Quantity Surveyor ACE & Techno Inter Consult (jv) 2017-2019 Senior Quantity Surveyor Professional Engineering Consultants 2015-2017 Senior Quantity Surveyor A.W.Hooker Associates Canada 2011-2015 Quantity Surveyor Saud Consult KSA 2009-2011 Quantity Surveyor A.W.Hooker Associates Canada 2008-2009 Quantity Surveyor D-Baluch Construction Company 2005-2008 Quantity Surveyor Tekfen Construction Kazakhstan 2000-2005

Project Name: Company Country Tentative Value

BRIDGEs PROJECTs

Trade Bridge over River Oxus Tekfen Construction Tajikistan Confidential Zeravshan Bridge Tajik Tekfen Construction Tajikistan Confidential Egypt Fast Track Project A.W.Hooker Associates Egypt Masar Confidential Ahmad zai, Myper, Rood Bridges A.W.Hooker Associates Afghanistan Confidential

. Trade Oxus Bridge Rood Bridge Zeravshan Bridge

MEGA HIGHWAYs PROJECTs

Dushanbe International Highway Project Tekfen Construction Tajikistan Confidential Gawader-Ratodero (M-8) D-Baluch (Pvt) Ltd Pakistan Confidential King Aman-u-Allah Khan Highway A.W.Hooker Associates Afghanistan Confidential King Fasil International Highway Saud Consult KSA Confidential Yakmach-Kharan Highway Project PEAS Islamabad Pakistan Confidential LTP North Portal-II A.C.E Lahore Pakistan Confidential

Dushanbe Highway Kharan Highway M8

LTP (Tunnel) North Portal-II



Contact this candidate